U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000


Skip to content U.S. Department of Transportation/Federal Highway AdministrationU.S. Department of Transportation/Federal Highway Administration

Federal Highway Administration Research and Technology
Coordinating, Developing, and Delivering Highway Transportation Innovations

Overview

Research and Technology (R&T) Projects

 

Select the search parameters below. Click the "GO" button [Help]

Project Name

Click the "Select All Projects" button to list all projects


Type specific key words and click the "GO" button [Help]

Search using Key Words


Select one of the search items below and click the "GO" button[Help]

Status
OR AND

Contact Name
OR AND

To search by dates, enter a date in one or both boxes [Help]

OR AND

Start Date

End Date

FHWA Laboratory Name
OR AND



PMSS Search help reset

 

 

Next Database update December 1, 2016

This project database contains projects sponsored or conducted by the Federal Highway Administration's Turner-Fairbank Highway Research Center and the Exploratory Advanced Research Program. Although it is not a comprehensive list yet, we are posting the information as we collect it. Keep checking back for more information.

For links to research in other Federal Highway Administration offices go to the Ongoing Research portion of this Web site.

 

 


List of All 430 Projects


Project ID: FHWA-PROJ-13-0108
Project Name: A Remote, Self-Sustained System for Monitoring Water Quality Near Highways
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0106
Project Name: A Self-Sensing Adaptive Material for New Generation of Multifunctional Highway Bridge Bearing System
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0004
Project Name: Abutment Interface Experiments for Integrated Approaches
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0023
Project Name: Accelerated Determination of Alkali-Silica Reaction Susceptibility During Concrete Prism Testing Through Nonlinear Resonance Ultrasonic Spectroscopy
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0007
Project Name: Active Traffic Management Study
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0104
Project Name: Addressing Challenges in Intelligent Construction Systems and Technologies
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0019
Project Name: Addressing the Challenges and the Return on Investment for Paperless Project Delivery (e-Construction)
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0070
Project Name: Advance Use of Recycled Asphalt in Flexible Pavement Infrastructure: Develop and Deploy Framework for Proper Use and Evaluation of Recycled Asphalt in Asphalt Mixtures
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0059
Project Name: Advanced Crash Analysis Program (ACAP) for Transportation Safety and Security
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0066
Project Name: Advanced Freeway Merge Assistance: Harnessing the Potential of Connected Vehicles
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0068
Project Name: Advanced Integration of Private Sector Freight Information with Public Traffic Information to Reduce Metropolitan Congestion (Freight Congestion Mitigation Decision Support)
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0009
Project Name: Advanced Traffic Signal Control Algorithms
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0011
Project Name: Advanced, Low-Cost Snowplow Visual Guidance System
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0130
Project Name: Advancement of Profile-Based Curl and Warp Analysis Using Long-Term Pavement Performance (LTPP) Profile Data
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0028
Project Name: Agent-Based Approach for Integrated Driver and Traveler Behavior Modeling
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-02-0003
Project Name: Alternate Corrosion-Resistant Protection Systems for Posttensioned Bridge Members
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0192
Project Name: American Society of Civil Engineers (ASCE)-Long-Term Pavement Performance (LTPP) International Data Analysis Contest
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0042
Project Name: Analysis of Construction Quality Assurance Procedures on Federally Funded Local Public Agency Projects
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0047
Project Name: Analysis of Network and Nonnetwork Impacts Upon Traveler Choice: Improve Modeling Accuracy for Better Transportation Decisionmaking
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/operations/13022/index.cfm


Project ID: FHWA-PROJ-13-0087
Project Name: Application and Validation of Remaining Service Interval Framework to Pavements Through the Use of State Highway Agency Pavement Management Data
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0006
Project Name: Application of Laser Shearography to Asphalt Issues
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0049
Project Name: Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Assessment of Data and Modeling Opportunities for Heavy Trucks
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0050
Project Name: Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Design for Environmental Data Capture System
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0048
Project Name: Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Eco-Adaptive Signalized Intersection Algorithm
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0046
Project Name: Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Engaging the International Community
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0051
Project Name: Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Environmental Models and Applications
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0047
Project Name: Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Evaluating Intelligent Eco-Drive Applications
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0053
Project Name: Applications for the Environment Real-Time Synthesis State-of-the-Practice Support
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0101
Project Name: Applications for the Environment: Real-Time Information Synthesis (AERIS) Evaluation Project
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0052
Project Name: Applications for the Environment: Real-Time Synthesis Broad Agency Announcement Project: Evaluate Fuel Efficient Route Guidance
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-15-0003
Project Name: Applications of Knowledge Discovery in Massive Transportation Data: The Development of a Transportation Research Informatics Platform (TRIP)
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0055
Project Name: Applications of Massive Data and Data Mining Techniques Concerning Safety Data
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0066
Project Name: Asphalt Component and Additive Compatibility
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0041
Project Name: Asphalt Mix Compaction Modeling
Status: Terminated
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0028
Project Name: Asphalt Modification with Phosphoric Acid
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0035
Project Name: Asphalt Pavement Embrittlement: Evaluating the Relationship Between Field and Lab Aging
Status: Terminated
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0048
Project Name: Asphalt Sustainability Issues: Evaluation of Long-Term Performance of Recycled Additives, Including Recycled Motor Oil, Reclaimed Asphalt Pavements, Reclaimed Asphalt Shingles, and Bioasphalts
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0005
Project Name: Asphalt with Improved Physical Properties
Status: Terminated
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0076
Project Name: Assess the Feasibility of Deploying Partial Automation for Truck Platooning
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0026
Project Name: Assessment of Prestressing Strand and Lightweight Concrete via the Standard Test for Strand Bond (STSB)
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0022
Project Name: Augmenting Inductive Loop Sensor Data with SPAT and GrID (MAP) via Data Fusion, Harmonia — Phase II: Product Development (111FH2-15)
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0066
Project Name: Backcalculation of the Long-Term Pavement Performance Program Deflection Data
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/15036/15036.pdf


Project ID: FHWA-PROJ-08-0022
Project Name: Balancing Safety and Capacity in an Adaptive Signal Control System, Phase I
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0037
Project Name: Balancing Safety and Capacity in an Adaptive Signal Control System, Phase II
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0054
Project Name: Behavioral Sciences Approach to Testing, Validating, and Establishing Best Practices for Alternative Highway Revenue Collection
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0133
Project Name: Behavioral-Based (or Agent-Based) National Freight Demand Modeling
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0038
Project Name: Berkeley Transportation Systems-Measurement Transportation System Performance Measures Using Loop Infrastructure (102-FH2-005 10C10078)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0046
Project Name: Better Understanding of Weathering Steel Performance
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0025
Project Name: Calibration of Driver Behavior Parameters for Optimization of Work Zone Throughput
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0015
Project Name: Carbon Nanotube-Based Self-Sensing Concrete for Pavement Structural Health Monitoring
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0024
Project Name: Center for Transportation Injury Research
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0022
Project Name: Characterization of Fresh and Hardened Cementitious Mixtures for Sustainable Pavements
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0014
Project Name: Characterization of Open-Graded Aggregates
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/13068/index.cfm


Project ID: FHWA-PROJ-14-0126
Project Name: Characterizing Existing Hot-Mix Asphalt Layer Damage for Mechanistic Pavement Rehabilitation Design
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0108
Project Name: Characterizing Unknown Foundations to Improve Bridge Safety
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0056
Project Name: Clarus Data for Weather-Responsive Traffic Signal System Applications
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0004
Project Name: Clear Roads Highway Operations Pooled Fund (continued from TPF-5(092)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0052
Project Name: Collection of Data for Performance-Management of Walls, Slopes, and Nonbridge, Nonpavement Assets
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0070
Project Name: Communication Systems Analysis for Signal Phase and Timing (SPaT) Applications — Phase I
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0015
Project Name: Completion Of 67-80 Accelerated Pavement Testing Facility Mixture Fatigue And Rutting Characterization
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0189
Project Name: Compression Response of a Rapid-Strengthening Ultra-High Performance Concrete Formulation
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/hpc/12064/index.cfm


Project ID: FHWA-PROJ-13-0103
Project Name: Computer Vision Measurements and Analysis to Support Naturalistic Driving Studies for Road Safety
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0051
Project Name: Computer Vision Measurements and Analysis to Support Naturalistic Driving Studies. Developing calibration and metrics for automated data extraction algorithm.
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0050
Project Name: Computer-Based Guidelines for Curing Concrete
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0103
Project Name: Condition Assessment of a Mechanically Stabilized Earth (MSE) Wall
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0015
Project Name: Connected Vehicles Pooled Fund Study
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0003
Project Name: Connections for Modular Concrete Bridge Components
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0104
Project Name: Cooperating Camera Platforms for Ultra High-Resolution Tracking of Traffic
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0069
Project Name: Cooperative Adaptive Cruise Control
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-04-0001
Project Name: Corrosion Monitoring Research for New York City Suspension Bridges
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0081
Project Name: Countdown Pedestrian Signal's Legibility and Comprehension Without Flashing Hand
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0044
Project Name: Countermeasures to Hand-Emplaced Attack Methods on Steel Bridge Members
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0055
Project Name: Covered Bridge Preservation Research, Development, and Technology: Interagency Agreement II with the Forest Service, Forest Products Laboratory
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0034
Project Name: Covered Bridges Context Study/National Historic Landmark Nomination
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0027
Project Name: Creating Smart Pavements that Monitor and Report on Pavement Condition
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0089
Project Name: Creation of Long-Term Bridge Performance (LTBP) Bridge Portal: A Web-based Application with Advanced Visualization and Analysis Tools
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-03-0005
Project Name: Curved Steel Bridge Research Project
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0018
Project Name: Data Mining and Gap Analysis for Weather Responsive Traffic Management Studies
Status: Completed
Project Deliverable URL(s):
http://ntl.bts.gov/lib/38000/38100/38165/HTML/dmga.pdf


Project ID: FHWA-PROJ-14-0012
Project Name: DCode: A Comprehensive Automatic Coding System for Driver Behavior Analysis
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0062
Project Name: Deleterious Aggregates—Identification, Testing, Mitigation, and Use of Local Materials
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0095
Project Name: Demonstration of Network Level Pavement Structural Evaluation with Traffic Speed Deflectometer
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0020
Project Name: Design and Construction of Geosynthetic Reinforced Soil (GRS) Structures for Load-Bearing Applications: Part 1
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/index.cfm


Project ID: FHWA-PROJ-10-0021
Project Name: Design and Construction of Geosynthetic Reinforced Soil (GRS) Structures for Load-Bearing Applications: Part 2
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/11027.pdf


Project ID: FHWA-PROJ-11-0044
Project Name: Design of a Completely New Approach for a National Household-Based Long Distance Travel Survey Instrument
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0033
Project Name: Detailed Exploration of the Locking Point Concept in Mix Design
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0069
Project Name: Determining an Aggregate's Potential for Forming Alkali-Silica Reactivity (ASR) Gels in Concrete
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0020
Project Name: Develop and Deploy End-Result/Performance-Based Specifications for Pavement Construction
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0014
Project Name: Develop Concept of Operations and High-Level Requirements for the Dynamic Mobility Application (DMA) Freeway Bundle Integrated Network Flow Optimization (INFLO)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0015
Project Name: Develop Reliable Analysis Methodology and Tools for Evaluating Pavement Performance Under Movement of Superloads
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0001
Project Name: Develop Synthesis of Composite Pavement
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0045
Project Name: Develop Traffic Capacity Models for Mini-Roundabouts from Simulation
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0061
Project Name: Develop/Improve American Association of State Highway and Transportation Officials Concrete Coefficient of Thermal Expansion Test
Status: Active
Project Deliverable URL(s):
http://www.fhwa.dot.gov/research/tfhrc/programs/infrastructure/pavements/ltpp/getdata.cfm


Project ID: FHWA-PROJ-10-0068
Project Name: Development and Demonstration of Pavement Friction Thresholds, Including Friction Numbers and Macrotexture; Phase II Purchase and Delivery of Continuous Friction Measuring Equipment (CFME); Acceptance Testing and Demonstration of CFME
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0029
Project Name: Development and Demonstration of Systems-Based Monitoring Approaches for Improved Infrastructure Management Under Uncertainty
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0019
Project Name: Development and Evaluation of Selected Mobility Applications for Vehicle-Infrastructure Integration
Status: Completed
Project Deliverable URL(s):
http://gateway.path.berkeley.edu/~xylu/data/VII_FHWA_Project/


Project ID: FHWA-PROJ-10-0012
Project Name: Development and Evaluation of Technological Innovations in Transportation for People with Disabilities (Exploratory Advanced Research Program)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0085
Project Name: Development Length of Reinforcing Bars in Field-Cast Grouts
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0003
Project Name: Development of a Family of Ultra-High Performance Concrete Pi-Girders
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/hpc/14028/index.cfm


Project ID: FHWA-PROJ-11-0104
Project Name: Development of a Field Prototype for the Inspection of Culverts
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0065
Project Name: Development of a Rapid Method for Quality Assurance of Entrained Air-Void Properties in Hardened Concrete
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0097
Project Name: Development of Advanced Connection Systems for Adjacent Concrete Box Beams
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0043
Project Name: Development of Alternate Load Paths Around Blast or Cut Damaged/Destroyed Steel Truss Members
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0008
Project Name: Development of an Ultra-High Performance Concrete Bridge Superstructure System
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/09069/


Project ID: FHWA-PROJ-07-0001
Project Name: Development of an Ultra-High Performance Concrete Precast Bridge Deck Element
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/bridge/07055/


Project ID: FHWA-PROJ-08-0017
Project Name: Development of Best Practices Guide on Security of Historic Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0001
Project Name: Development of Concrete Paving Mixture Design for Long-Term Performance
Status: Proposed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0067
Project Name: Development of Crash Modification Factors
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0093
Project Name: Development of Enhanced Safety Systems Based on GPS and INU System
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0063
Project Name: Development of Lightweight Floor Replacement Systems
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0010
Project Name: Development of Long-Term Bridge Performance Program Protocols for Steel Bridge Coatings
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0045
Project Name: Development of New Default Traffic Datasets for the Mechanistic-Empirical Pavement Design Guide Using the Data from Long-Term Pavement Performance Specific Pavement Study Traffic Data Collection Pooled Fund Study, TPF-5(004)
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/13089/index.cfm


Project ID: FHWA-PROJ-08-0041
Project Name: Development of Nondestructive Evaluation Field Test Method for Alkali-Silica Reaction Detection and Identification of Cost-Effective Materials for Rehabilitation of Structures Affected
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0161
Project Name: Development of Nonproprietary Ultra-High Performance Concrete (UHPC)
Status: Completed
Project Deliverable URL(s):
http://www.ntis.gov/
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/13100/index.cfm


Project ID: FHWA-PROJ-03-0001
Project Name: Development of Performance-Based Specification for Asphalt Binders: Fatigue Characterization
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/11045/index.cfm


Project ID: FHWA-PROJ-08-0002
Project Name: Development of Performance-Based Specifications for Asphalt Mixtures
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0025
Project Name: Development of Soil Stiffness Measuring Device for Pad Foot Roller Compaction
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0046
Project Name: Development of Structural Carbon Nanotube-Based Sensing Composites for Rehabilitation of Deteriorating and Fatigue-Damaged Steel Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0017
Project Name: Development of the Capacity Analysis for Planning of Junctions Tool (CAP-X)
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/software/research/operations/cap-x/


Project ID: FHWA-PROJ-10-0017
Project Name: Differential Global Positioning System-Based Trilateration Positioning Receiver
Status: Terminated
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0033
Project Name: Dilemma Zone Intelligent Transportation Systems for High-Speed Intersections
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0031
Project Name: Dimensional Stability of Prebagged Grouts for Prefabricated Bridge Element and System Connections
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0030
Project Name: Direct Tension Test Method for Ultra-High Performance Concrete
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0054
Project Name: DMask: A Reliable Identity Masking System for Driver Safety Video Data
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0071
Project Name: Documentation of Highway Driving Simulator Software
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0009
Project Name: Downdrag on Continuous Flight Auger (CFA) Piles Due To Liquefaction
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0039
Project Name: Driver Behavior in Traffic
Status: Completed
Project Deliverable URL(s):
http://www.ntis.gov


Project ID: FHWA-PROJ-11-0106
Project Name: Driver Behavior on Horizontal Curves Pilot Study
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0060
Project Name: Driver Behavioral Situational Awareness System (DB-SAM)
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0041
Project Name: Driver Expectations When Navigating Complex Interchanges
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0058
Project Name: Dynamic Mobility Applications Analytical Needs Procurement
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0016
Project Name: Effective Integration of Analysis Modeling and Simulation Tools
Status: Active
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/operations/13036/index.cfm


Project ID: FHWA-PROJ-09-0037
Project Name: Effects of Automated Transit, Pedestrian, and Bicycling Facilities on Urban Travel Patterns
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0002
Project Name: Efficacy of Solid-State Welding for Bridge Fabrication
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0020
Project Name: Enhanced Analysis of Falling Weight Deflectometer Data for Use With the Mechanistic-Empirical Flexible Pavement Design and Analysis and Recommendations for Improvements to Falling Weight Deflectometer
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0054
Project Name: Enhancement of HIPERPAV (HIgh PERformance Concrete PAVing) III
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0034
Project Name: Environmental Effects in the Absence of Heavy Loads, Specific Pavement Study 8
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-05-0002
Project Name: Environmental Investigation in Support of the Federal Highway Administration Finding of No Significant Impact for Construction of a Nationwide Differential Global Positioning System
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0006
Project Name: Establish National Performance Indicators and Performance Health Index (Earmark)
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0014
Project Name: Establishment of the Saxton Transportation Operations Laboratory (TOL)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0047
Project Name: Evaluating Naturally Durable Wood Species for Repair and Rehabilitation of Aboveground Components in Covered Bridges
Status: Completed
Project Deliverable URL(s):
http://www.fpl.fs.fed.us/documnts/fplgtr/fpl_gtr224.pdf


Project ID: FHWA-PROJ-11-0057
Project Name: Evaluation and Removal of Surface Contaminants From Steel Prior to Coating
Status: Terminated
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0059
Project Name: Evaluation of Adaptive Lighting on Roadways
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0092
Project Name: Evaluation of Elongated Pavement Markings Signs
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0110
Project Name: Evaluation of Long-Term Pavement Performance Program Climatic Data for Use in Mechanistic-Empirical Pavement Design Guide Calibration and Other Pavement Analyses
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/15019/index.cfm
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/15026/index.cfm


Project ID: FHWA-PROJ-05-0001
Project Name: Evaluation of Low Cost Safety Improvements Transportation Pooled Fund Study
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0068
Project Name: Evaluation of Pedestrian Hybrid Beacons and Rapid Flashing Beacons
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0044
Project Name: Evaluation of Pedestrian Safety Engineering Countermeasures at Urban and Suburban Midblock Crossing Locations
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0027
Project Name: Evaluation of Pedestrian Safety Measures
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/safety/pedbike/10043/index.cfm
http://www.fhwa.dot.gov/publications/research/safety/10045/index.cfm
http://www.fhwa.dot.gov/publications/research/safety/pedbike/11039/11039.pdf
http://www.fhwa.dot.gov/publications/research/safety/pedbike/10068/10068.pdf
http://www.fhwa.dot.gov/publications/research/safety/pedbike/10044/index.cfm


Project ID: FHWA-PROJ-09-0010
Project Name: Evaluation of Some Key Assumptions of Mechanistic-Empirical Pavement Design Guide and Quantification of Its Impact on Prediction Accuracy
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0020
Project Name: Evaluation of Speed-Activated Displays on Curves
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0022
Project Name: Every Day Counts Activities
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0018
Project Name: Expert System Signal Operation Analysis Tool, Phase I
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0170
Project Name: Expert System Signal Operation Analysis Tool, Phase II
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0171
Project Name: Exploration of Integrated Vehicle-Based Safety Systems Naturalistic Driving Data
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0082
Project Name: Extended Event Horizon Navigation and Wayfinding for Blind and Visually Impaired Pedestrians in Unstructured Environments
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0015
Project Name: Extending the Season for Concrete Construction and Repair
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0085
Project Name: Extension of Flexible Pavement Life With Preservation to Resist Aging and Embrittlement
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0010
Project Name: Fatigue Characterization of Plant Produced High Reclaimed Asphalt Pavement Mixtures
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0053
Project Name: Fatigue of Plasma and Laser Cut Holes
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0013
Project Name: Fatigue Performance of Rib-to-Deck Welds for Steel Orthotropic Bridge Decks
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0043
Project Name: Feasibility of Mapping and Marking Underground Utilities by State Highway Agencies
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0005
Project Name: Feasibility of Using Surface Resistivity of Concrete for Measuring Permeability
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0037
Project Name: Federal Highway Administration Design Manual: Deep Mixing for Embankment and Foundation Support
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0004
Project Name: Federal Highway Administration Long-Term Bridge Performance Program
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0010
Project Name: Federal Highway Administration Support for TPF-5(039) Falling Weight Deflectometer Calibration Center and Operational Improvements
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0014
Project Name: Fiber-Reinforced Polymer (FRP) Applications in Hazard Mitigations (Seismic, Blast, Impact, etc.)
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0066
Project Name: Field and Safety Evaluation of Mini-Roundabouts
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0025
Project Name: Field Calibrations and Validations for Long-Term Pavement Performance Weigh-in-Motion Systems
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0039
Project Name: Field Data Collection of Truck Spray
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0036
Project Name: Field Pavement Remaining Structural Life Assessment Tests
Status: Terminated
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0092
Project Name: Fillet Weld Penetration Using Gas Metal and Flux-Cored Arc Welding Processes
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0002
Project Name: Flexural Behavior of Minimally Reinforced Ultra-High Performance Concrete Beams
Status: Terminated
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0003
Project Name: Flexural Fatigue Performance of Ultra-High Performance Concrete
Status: Terminated
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0015
Project Name: Flooded Pavement Assessment Methods
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0175
Project Name: Forensic Tool Box
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0109
Project Name: Foundation Characterization Program (FCP)
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0055
Project Name: Foundational Knowledge to Support a Long-Distance Passenger Travel Demand Modeling Framework
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0038
Project Name: Fracture Resistance of Cold Bent Steel
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-05-0004
Project Name: Full Scale Bridge Cable Tests
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0011
Project Name: Full-Scale Aggregate Base Design and Construction
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0006
Project Name: Fundamental Properties of Asphalts and Modified Asphalts III
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0014
Project Name: Galvanizing Effect on the Fatigue Performance of Sign and Signal Socket Connection Details
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0009
Project Name: General Laboratory Support for Coating and Corrosion
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0107
Project Name: Geosynthetic Reinforced Soil (GRS) — Timber Bridge: A Sustainable Bridge Construction for Low-Volume Roads
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0173
Project Name: Geosynthetic Reinforced Soil Design
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0056
Project Name: Geotextile Separation Layer for Aggregate Base Courses
Status: Temporarily Suspended
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0020
Project Name: Greatly Increased Use of Fly Ash in Hydraulic Cement Concrete for Pavement Layers and Transportation Structures
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0060
Project Name: Green Energy-Powered Dirigible Transportation
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0063
Project Name: Grout Performance in Staged Construction Connections
Status: Completed
Project Deliverable URL(s):
http://www.ntis.gov/
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/12055/index.cfm


Project ID: FHWA-PROJ-13-0019
Project Name: Guidance and Tools to Improve the Core Elements of State Quality Assurance Programs
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0045
Project Name: Guidelines for the Load and Resistance Factor Design and Rating of Riveted and Bolted Gusset-Plate Connections for Steel Bridges
Status: Completed
Project Deliverable URL(s):
http://www.trb.org/Publications/Blurbs/168923.aspx


Project ID: FHWA-PROJ-10-0008
Project Name: Gusset-Plate Testing Program
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0028
Project Name: Hardware-in-the-loop Simulation Tool for Connected Vehicle Technology Evaluation
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0121
Project Name: Hazard Mitigation Indefinite Delivery Indefinite Quantity (IDIQ) Contract
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0112
Project Name: Heavy Truck Cooperative Adaptive Cruise Control: Evaluation, Testing, and Stakeholder Engagement for Near-term Deployment
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0065
Project Name: High-Performance Computational Fluid Dynamics Modeling at Argonne National Laboratory Transportation Research and Analysis Computer Center
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0003
Project Name: High-Performance, Stress-Relaxing Cementitious Composites for Crack-Free Pavements and Transportation Structures
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0012
Project Name: High-Speed Deflection Measurements for Use in State Highway Agency Pavement Management and National Performance Management
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0002
Project Name: Highway Safety Information System (HSIS) V
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/safety/10053/index.cfm
http://www.fhwa.dot.gov/publications/research/safety/10024/index.cfm
http://www.fhwa.dot.gov/publications/research/safety/10039/index.cfm


Project ID: FHWA-PROJ-06-0003
Project Name: Highway Safety Information System (HSIS)-VI
Status: Active
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/safety/10053/index.cfm
http://www.fhwa.dot.gov/publications/research/safety/10024/index.cfm
http://www.fhwa.dot.gov/publications/research/safety/10039/index.cfm


Project ID: FHWA-PROJ-08-0018
Project Name: Historic American Engineering Record Book on Covered Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0050
Project Name: Howe Truss Bridge Design and Performance
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0060
Project Name: Human Factors Assessment of Pedestrian Midblock Behavior
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0031
Project Name: Human Factors for Limited-Ability Autonomous Driving Systems
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0005
Project Name: Hydration Kinetics of High-Volume Fly Ash Mixtures for Concrete Paving Applications
Status: Proposed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0020
Project Name: Identification of Effective Next Generation Pavement Performance Measures and Asset Management Methodologies to Support MAP-21 Performance Management Requirements
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0180
Project Name: Imaging of Aggregates Using Aggregate Imaging System (AIMS) II
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0072
Project Name: Impacts Assessment of Dynamic Speed Harmonization with Queue Warning
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0043
Project Name: Implementation of Jointed Plain Concrete Pavements Performance-Related Specifications by State Highway Agencies
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0024
Project Name: Improved Analytical Techniques for Historic Covered Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0052
Project Name: Improved Methods for Determination of Pavement Remaining Life
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0084
Project Name: Improved Performance of Concrete in Rigid Pavements and Other Transportation Structures Through Modeling of Cement Hydration
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0017
Project Name: Improved Reliability Modeling and Analysis for Primary Pavement Distress Models of Mechanistic-Empirical Design Guide
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0040
Project Name: Improving Signing and Markings at Complex Interchanges
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0016
Project Name: Improving the Seismic Resilience of the Federal-Aid Highway System
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0177
Project Name: In Situ (Field) Scour and Erosion Testing Device
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0159
Project Name: Incorporate Sustainability Factors in the Selection Process for Pavement Types
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0131
Project Name: Incorporating a Curling Factor in Layer Moduli Backcalculation Using Long-Term Pavement Performance's Seasonal Monitoring Program Falling Weight Deflectometer Data for Jointed Pavement Test Sections
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0129
Project Name: Increase in Roughness Due to Environmental Factors in Flexible Pavements
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0028
Project Name: Increased Understanding of Driver Visibility Requirements
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0035
Project Name: Index-Based Cost Estimation Procedures with Accuracy and Precision Analysis
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0178
Project Name: Influence of Large-Scale Turbulence Structures on Scour
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0057
Project Name: Informational Report on Methods to Achieve Safe Speeds on Rural and Suburban Roadways
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0062
Project Name: Innovative Approaches for Next Generation Vehicle Positioning - Phase I
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0012
Project Name: Innovative Technologies and Their Applications to Enhance the Seismic Performance of Highway Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0105
Project Name: Inorganic Polymers: Novel Ordinary Portland Cement-free Binders for Transportation Infrastructure
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0013
Project Name: In-Place Recycle Paving Methods: Energy Use Analysis
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0042
Project Name: Integrated Active Transportation System Operational Vision and Implementation Research Plan
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0022
Project Name: Integrated Texture-Noise Model Development
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0034
Project Name: Integrated Vehicle-to-Infrastructure Prototype Development
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0014
Project Name: Integrating 3D Digital Models Into Asset Management
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0055
Project Name: Integration of Multistate Clarus Data into Real-Time and Archived Regional Integrated Transportation Information System Data Visualization Tools
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0021
Project Name: Intelligent Multisensor Measurements to Enhance Vehicle Navigation and Safety Systems
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0045
Project Name: Intelligent Situation Awareness and Navigation Aid for Visually Impaired Persons
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0060
Project Name: Interactive Highway Safety Design Model
Status: Completed
Project Deliverable URL(s):
http://www.ihsdm.org/wiki/Welcome


Project ID: FHWA-PROJ-14-0058
Project Name: Interactive Highway Safety Design Model 2
Status: Active
Project Deliverable URL(s):
http://www.ihsdm.org/wiki/Welcome


Project ID: FHWA-PROJ-07-0026
Project Name: Intersection Control for Autonomous Vehicles
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0036
Project Name: Kinetic-to-Electric Energy Conversion (KEEC)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0039
Project Name: Laboratory Testing of Aggregates for Road and Bridge Construction
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0040
Project Name: Layered Object Recognition System for Pedestrian Collision Sensing
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/safety/11056/11056.pdf


Project ID: FHWA-PROJ-02-0002
Project Name: Long-Term Pavement Performance Data Analysis Activities
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0005
Project Name: Long-Term Pavement Performance Data Collection Activities Fugro
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0006
Project Name: Long-Term Pavement Performance Data Collection Activities Nichols
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0034
Project Name: Long-Term Pavement Performance Data Collection Activities North Atlantic Region — 2012
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0008
Project Name: Long-Term Pavement Performance Data Collection Activities Stantec NCRSC
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0007
Project Name: Long-Term Pavement Performance Data Collection Activities Stantec North American Regional Science Council
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0032
Project Name: Long-Term Pavement Performance Data Collection Activities, North Central Region — 2012
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0031
Project Name: Long-Term Pavement Performance Data Collection Activities, Southern Region — 2012
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0033
Project Name: Long-Term Pavement Performance Data Collection Activities, Western Region — 2012
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0023
Project Name: Long-Term Pavement Performance Program Onsite Technical Support (From 2007 to 2011)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0028
Project Name: Long-Term Pavement Performance Program Onsite Technical Support (From 2012 to 2016)
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0053
Project Name: Long-Term Pavement Performance Program Report
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0172
Project Name: Long-Term Pavement Performance Program Standard Data Release (SDR) Number 25
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0005
Project Name: Long-Term Pavement Performance Program Standard Data Release (SDR) Number 26
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0026
Project Name: Long-Term Pavement Performance Program Standard Data Release (SDR) Number 27
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0041
Project Name: Long-Term Pavement Performance Program Standard Data Release (SDR) Number 28
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0069
Project Name: Long-Term Pavement Performance Program Technical Support Services Contract
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0051
Project Name: Long-Term Performance of Timber Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0086
Project Name: Low-Powered Wired Sensors for Asset Management or Health Monitoring of Structure and Pavements
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0070
Project Name: Machine Learning for Automated Analysis of Large Volumes of Highway Video
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-04-0002
Project Name: Maintenance and Data Services for Long-Term Pavement Performance (LTPP) Weigh-in-Motion (WIM) Systems
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0067
Project Name: Making Driving Simulators More Useful for Behavioral Research
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0050
Project Name: Mapping Assessment for Connected Vehicle Highway Network
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0031
Project Name: Material Properties of Prebagged Grouts for Prefabricated Bridge Element and System Connections
Status: Completed
Project Deliverable URL(s):
http://www.ntis.gov/
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/13042/


Project ID: FHWA-PROJ-08-0044
Project Name: Material Reference Library
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0097
Project Name: Material Reference Library 2013—2018
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0042
Project Name: Materials Performance for Attack Countermeasures/Multihazard Mitigation Support on Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0029
Project Name: Mathematical Analysis of the Empirical Mode Decomposition
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0029
Project Name: Mechanical and Structural Nanoscale Modeling
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0023
Project Name: Mechanical Material Modeling and Simulation by New Multiple Length/Time-Scale Theories and Algorithms
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0036
Project Name: Mechanical Properties of Lightweight High-Performance Concrete
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/bridge/13061/index.cfm


Project ID: FHWA-PROJ-10-0088
Project Name: Megaregional Travel
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0039
Project Name: Microscopic Traffic Simulation Models and Software: An Open Source Approach (081-FH5) Small Business Innovation Research Program (SBIR), Phase II
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0038
Project Name: Microscopic Traffic Simulation Models: An Open Source Approach (081-FH5), Phase I
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0193
Project Name: Microscopic Traffic Simulation Models: An Open Source Approach (081-FH5), Phase II
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0002
Project Name: Microscopic Traffic Simulation Models: An Open Source Approach (081-FH5), Phase IIb
Status: Proposed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0026
Project Name: Mild Steel Reinforcement Splice Behavior of Lightweight High-Performance Concrete
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0033
Project Name: Modeling Hot-Mix Asphalt Compaction
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0011
Project Name: Modeling the Urban Continuum in an Integrated Framework: Location Choice, Activity-Travel Behavior, and Dynamic Traffic Patterns
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0041
Project Name: Modified Flexural Strength Test
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0048
Project Name: Monitoring of the Milton-Madison Bridge
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/13105/13105.pdf


Project ID: FHWA-PROJ-06-0017
Project Name: Monitoring of Wind Conditions and Bridge Behavior at Select Bridge Sites
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0026
Project Name: Motorcycle Crash Causation Study
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0049
Project Name: Multimodal Connectivity Options for a Future Seamless Transportation System
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0069
Project Name: Multimodal Intelligent Traffic Signal System (MMITSS) Prototyping and Field Testing
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0071
Project Name: Multimodal Intelligent Traffic Signal System Engineering
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0013
Project Name: Multiple-Hazard Design Principles for Highway Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0070
Project Name: Multisensor System for Vehicle Detection of 13 Classes (081-FH4), Phase 2b
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0059
Project Name: Nanoscale Approaches for Inhibiting Corrosion: Green Advanced Coatings for Application on Steel Structures and Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0010
Project Name: Nanoscale Approaches for Inhibiting Corrosion: Multifunctional Nanomaterials and Processes for Infrastructure Repair and Corrosion Inhibition
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0014
Project Name: Nanoscale Sensors for Structural Health
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0006
Project Name: National Forensic Workshop and Forensic Guidelines
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0009
Project Name: National Surface Transportation Safety Center of Excellence
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0091
Project Name: National Transportation Communication for Intelligent Transportation Systems Protocol (NTCIP) for Real-Time Signal State Transition Software for Advanced Traffic Controller — Phase II: Product Development (060-FH1)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0107
Project Name: Navigation Guidance for People With Vision Impairment
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0027
Project Name: New Approaches for Testing Connected Highway and Vehicle Systems
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0015
Project Name: New Approaches to Utility Cut Pavement Repair
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0019
Project Name: Next Generation of Smart Traffic Signals
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0002
Project Name: Next Generation Permanent Deformation Models for the Prediction of Rutting in Subgrade Materials for Pavement Design
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0061
Project Name: Next-Generation Vehicle Positioning in Global Positioning System-Degraded Environments for Vehicle Safety and Automation Systems
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0021
Project Name: Nondestructive Evaluation Web Manual
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0001
Project Name: Nonlinear Fracture Mechanics Approach to Fatigue Grading of Asphalt Mixtures and Binders
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0111
Project Name: Novel Development of Bio-based Binder for Sustainable Construction
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0134
Project Name: Novel Organic Cementitious Materials for Development of the Next Generation of Sustainable Transportation Infrastructure
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0022
Project Name: Operations Support for Concrete Pavement Roadmap
Status: Active
Project Deliverable URL(s):
http://www.cproadmap.org/


Project ID: FHWA-PROJ-09-0057
Project Name: Optimal Binder Selection for High-Level Reclaimed Asphalt Pavement Mixes
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0030
Project Name: Optimization of Data Collection for Pavement Management
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0188
Project Name: Optimized Shear Stud Spacing for Precast Deck Panel Construction
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0018
Project Name: Optimized Welds for High-Performing Steel Grade 100 Weathering (HPS100W) Steels
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/13102/13102.pdf


Project ID: FHWA-PROJ-06-0018
Project Name: Parametric Studies of Bridge Geometric Details and Their Aerodynamic Significance
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0098
Project Name: Pavement Performance Measures and Forecasting, and the Effects of Maintenance and Rehabilitation Strategy on Treatment Effectiveness
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0017
Project Name: Pavement Research Database
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0004
Project Name: Pavement Safety Performance (PSP) Data Analysis Program
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0025
Project Name: Pavement Shear Strain Response To Dual and Wide-Base Tires
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0185
Project Name: Pavement Structural Condition Evaluation at the Network Level
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0016
Project Name: Pavement Structural Evaluation at the Network Level
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0067
Project Name: Pedestrian Crash Modification Factors Study
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0030
Project Name: Pedestrian Detection, Counting and Tracking Systems for Travel Surveys, Traffic Safety Systems, and Traffic Control Systems (091-FH4)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0025
Project Name: Performance Evaluation of Prestressing Strands for Concrete Bridges With Chloride Contaminated Grout
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0008
Project Name: Performance Measurement Application for Dynamic Mobility Application Program
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0027
Project Name: Performance of Conventional Hot-Mix Asphalt Overlays and High Reclaimed Asphalt Pavement Content Overlays
Status: Terminated
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0061
Project Name: Performance Tests for Geosynthetic Reinforced Soil (GRS)
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/13066


Project ID: FHWA-PROJ-11-0035
Project Name: Performance-Based Contractor Prequalification as an Alternative to Performance Bonds
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0127
Project Name: Porous-Graded Asphalt
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0032
Project Name: Preservation Guidelines
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0032
Project Name: Protocols for Evaluating the Properties and Performance of Alternative Cementitious Materials (ACMs) for Use in Highway Applications
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0071
Project Name: Prototype Development and Small-Scale Demonstration of Dynamic Speed Harmonization with Queue Warning
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0011
Project Name: Publication and Distribution of the Fiber-Reinforced Polymer Bridge Deck Specifications
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0018
Project Name: Quality Assurance Data Analysis as a Leading Indicator for Infrastructure Condition Performance Management
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0003
Project Name: Quantification of Cost, Benefits, and Risk Associated With Different Quality and Project Delivery Systems
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0123
Project Name: Quantifying Driver Distraction and Engagement Using Video Analytics
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0018
Project Name: Quantifying Pavement Albedo
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0016
Project Name: Quantifying the Effectiveness of State Quality Assurance Programs
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0040
Project Name: Quick Incident Detection and Warning
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0039
Project Name: Radiographic Inspection of Gusset-Plate Connections
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/12071/


Project ID: FHWA-PROJ-11-0001
Project Name: Rapid Characterization of Alkali-Silica Reactivity (ASR) in Concrete
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0102
Project Name: Rapid Load Rating of Concrete Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0039
Project Name: Real-Time Data Capture and Management (RTDCM) State-of-the-Practice Assessment and Innovations Scan Support
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0013
Project Name: Real-Time Signal State Transition Software for the Advanced Traffic Controller (06-FH1)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0004
Project Name: Reevaluation of the Adjustment Factor for Coarse Bed Material Under Clear-Water Scour Condition
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0069
Project Name: Relating Ride Quality and Structural Adequacy for Pavement Rehabilitation/Design Decisions
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/12046/12046.pdf
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/12035/12035.pdf


Project ID: FHWA-PROJ-13-0088
Project Name: Remote, Ultra-Low Power Wireless Sensing System for Multimetric Self-Powered Monitoring of Bridge Components
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0107
Project Name: Remote, Wireless Camera Systems for Environmental Monitoring of Transportation Corridors
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0001
Project Name: Report to Congress on Pavement Marking Demonstration Project: Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users, Section 1907
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/safety/09039/


Project ID: FHWA-PROJ-11-0030
Project Name: Response-Based Load Rating of Steel Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0024
Project Name: Roadway Wind-Solar Hybrid Power Generation and Distribution System Towards Energy-Plus Roadways
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0090
Project Name: Rural Safety Innovation Program — Delta Regional Transportation Development Program
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0075
Project Name: Saxton Transportation Operations Laboratory TO-13002: Highway Capacity Manual (HCM) Guidance for Alternative Intersections
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0098
Project Name: Saxton Transportation Operations Laboratory TO-13003: Improved Data Collection for Work Zone Gap Acceptance Field Test
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0030
Project Name: Saxton Transportation Operations Laboratory TO-13004: Simulation for Research on Automated Longitudinal Vehicle Control
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0029
Project Name: Saxton Transportation Operations Laboratory TO-13005: Development of a Platform Technology for Automated Vehicle Research
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0048
Project Name: Saxton Transportation Operations Laboratory TO-13010: Workshop on Analysis of Network and Nonnetwork Impacts Upon Traveler Choice
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0074
Project Name: Saxton Transportation Operations Laboratory TO-13011: User Friendly Traffic Incident Management (TIM) Program Benefit-Cost Estimation Tool
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0007
Project Name: Scan International Technologies and Programs for Vehicle-Highway Cooperation
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/advancedresearch/pubs/13025/index.cfm
http://www.fhwa.dot.gov/advancedresearch/pubs/12033/index.cfm


Project ID: FHWA-PROJ-07-0027
Project Name: Scour Evaluation Studies: Scour in Cohesive Soils and Ex Situ Scour Testing Device
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0115
Project Name: Scour Evaluation Studies: Scour in Cohesive Soils and Ex Situ Scour Testing Device - Phase II
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0016
Project Name: Self-Powered Wireless Sensor System for Monitoring of Pavement
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0176
Project Name: Service Life Enhancement and Reduction in Carbon Footprint of Highway Structures
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0038
Project Name: Service Limit State Design and Analysis of Engineered Fills for Bridge Support
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0024
Project Name: Shear Behavior of Lightweight High-Performance Concrete Girders
Status: Active
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/15021/index.cfm


Project ID: FHWA-PROJ-10-0016
Project Name: Signal Phase and Timing (SPAT) with an Intersection Collision Model (101-FH3) Small Business Innovation Research (SBIR) Phase 1
Status: Completed
Project Deliverable URL(s):
http://code.google.com/p/etexas/


Project ID: FHWA-PROJ-11-0043
Project Name: Signal Phase and Timing (SPAT) with an Intersection Collision Model (101-FH3) Small Business Innovation Research (SBIR) Phase II
Status: Active
Project Deliverable URL(s):
http://code.google.com/p/etexas/


Project ID: FHWA-PROJ-11-0009
Project Name: Signal Phase and Timing and Related Messages for Connected Vehicle Applications
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0024
Project Name: Simplified Techniques for Evaluation and Interpretation of Pavement Deflections for Network-Level Analysis
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0002
Project Name: Simultaneous Structural and Environmental Loading of an Ultra-High Performance Concrete Component
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/10055/index.cfm


Project ID: FHWA-PROJ-12-0040
Project Name: Small-Scale Viscoelastic Continuum Damage (VECD) Protocol
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0103
Project Name: Smart Scour Countermeasures
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0195
Project Name: Solar Roadways
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0106
Project Name: Splice Length of Prestressing Strand in Field-Cast Ultra-High Performance Concrete Connections
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/hpc/14041/14041.pdf


Project ID: FHWA-PROJ-09-0058
Project Name: Standardized Methods Life-Cycle Cost Analysis
Status: Active
Project Deliverable URL(s):
http://www.fhwa.dot.gov/infrastructure/asstmgmt/lcca.cfm


Project ID: FHWA-PROJ-13-0040
Project Name: Steel Bridge Coatings Topics
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0032
Project Name: Steel Suspension Bridge Vulnerability and Countermeasures
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0014
Project Name: Step Frequency Ground Penetrating Radar for Location and Evaluation of In-Roadway Sensors (06-FH2_SBIR) Phase IIb
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-05-0009
Project Name: Stereo Pedestrian — A New Robust Multiple Pedestrian Detection and Tracking System, Phase I: Proof of Concept
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0015
Project Name: Stereo Pedestrian — A New Robust Multiple Pedestrian Detection and Tracking System, Phase II: Product Development
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0078
Project Name: Stereo Pedestrian — A New Robust Multiple Pedestrian Detection and Tracking System, Phase III: Field Test
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0064
Project Name: Structural Performance of a Novel Ultra-High Performance Concrete Composite Connection
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/hpc/12042/
http://www.ntis.gov/


Project ID: FHWA-PROJ-09-0003
Project Name: Structural Performance of Field-Cast, Ultra-High Performance Concrete Deck Level Connections
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/11022/index.cfm
http://trb.metapress.com/content/c0144v7194073208/


Project ID: FHWA-PROJ-06-0021
Project Name: Structural Use of Wood-Plastic Composites in Transportation Applications
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0027
Project Name: Student Research in Transportation Data
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0029
Project Name: Supply Chain-Based Solution to Prevent Fuel Tax Evasion
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0105
Project Name: Support Development of Research and Technology Communications and Outreach Plan
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0016
Project Name: SUP-PRESS — Suppressing Utility Problems — Protection via Robotic Engineering to the Subsurface
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-03-0003
Project Name: Surrogate Safety Assessment Model
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/software/research/safety/ssam/index.cfm
http://www.fhwa.dot.gov/software/research/safety/ssam/index.cfm
http://www.fhwa.dot.gov/software/research/safety/ssam/index.cfm


Project ID: FHWA-PROJ-09-0036
Project Name: Synthesis of Aerodynamic Results from Prior Wind Tunnel Bridge Investigations Conducted in North America
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0007
Project Name: Synthesis of Congestion Pricing
Status: Completed
Project Deliverable URL(s):
http://www.ops.fhwa.dot.gov/publications/fhwahop11008/index.htm


Project ID: FHWA-PROJ-10-0086
Project Name: System Performance Measurement Using Loop Infrastructure, Iteris-Phase II: Product Development (102FH2-05)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0067
Project Name: TechBrief: Construction Quality Assurance for Design-Build Highway Projects
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0014
Project Name: Technical Assistance for Cooperative Intersection Collision Avoidance Systems Program
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-07-0032
Project Name: Technical Support for the DYNASMART-P Release and Applications
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0094
Project Name: The National Transportation Control Interface Protocol (NTCIP) for Real-Time Signal State Transition Software for Advanced Traffic Controller — Phase II: Product Development (060-FH1)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0100
Project Name: TO — 14022: Speed Harmonization Fundamental Research
Status: Proposed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0099
Project Name: TO-14020: Lane Change/Merge Fundamental Research: Phase 1
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0032
Project Name: TPF-5(197) — The Impact of Wide-Base Tires on Pavement Damage: A National Study
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0006
Project Name: Traffic Analysis and Simulation Pooled Fund Study — Task 1: Traffic Analysis Tools Consistency: Recommended Practices
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/operations/11064/index.cfm


Project ID: FHWA-PROJ-10-0019
Project Name: Traffic Analysis and Simulation Pooled Fund Study—Task 2: Guidance on the Level of Effort Required to Conduct Traffic Analysis
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0073
Project Name: Traffic Bottleneck Identification and Diagnosis, Countermeasure Prioritization, and Innovative Solutions to Local/Systemic Problems
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-03-0004
Project Name: Traffic Control Devices Transportation Pooled Fund Study
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0045
Project Name: Traffic Management Center Pooled Fund Study—Task 1: Methodologies to Measure and Quantify Traffic Management Center Benefits, Phase 1
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0035
Project Name: Traffic Management Center Pooled Fund Study—Task 2: Integration of Traffic Management Centers and Law Enforcement, Needs Assessment
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0025
Project Name: Transfer Length and Development Length Behaviors of Lightweight High-Performance Concrete Girders
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0003
Project Name: Transportation System Performance Measurement Using Existing Loop Infrastructure (102-FH2-005) SBIR Phase II
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0096
Project Name: Transportation System Performance Measurement Using Loop Signature Amplifiers (102-FH2-009) SBIR Phase II
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-12-0093
Project Name: Tubular Flange Girder Systems for Curved Highway Bridges
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0160
Project Name: Ultra-High Performance Concrete (UHPC) — State of the Art 2012
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/hpc/13060/


Project ID: FHWA-PROJ-09-0001
Project Name: Ultra-High Performance Concrete Material Model
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/structures/10079/index.cfm


Project ID: FHWA-PROJ-13-0013
Project Name: Ultra-High Performance Concretes and High-Performance Steels as Countermeasures for Blast and Impact Protection
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0040
Project Name: Understanding the Alkali-Silica Reaction (ASR) Mechanism and Developing Rapid and Reliable Laboratory Test Methods to Address ASR Reactivity of Concrete Mixture Design
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-15-0002
Project Name: Update and Improve Long-Term Pavement Program (LTPP) Bind
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0025
Project Name: Use of Laser Scanning Technology to Obtain As-built Records
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0054
Project Name: Use of Mobile Data for Weather-Responsive Traffic Management Models
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0083
Project Name: Use of Nanoporous Thin Films (NPTF) to Improve Aggregate-Cement Interface
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-06-0020
Project Name: Use of Radio Frequency Identification Tags in Pavements
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0110
Project Name: Using Cooperative Adaptive Cruise Control (CACC) to Form High-Performance Vehicle Streams
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0021
Project Name: Using Long-Term Pavement Performance Program Distress Data to Support Performance-Based Reporting
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0017
Project Name: Utilizing 3D Digital Design Data in Highway Construction — A Case Study
Status: Programmed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-14-0008
Project Name: Validation of Pavement Performance Measures
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0040
Project Name: VASTO — Evolutionary Agent System for Transportation Outlook
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/advancedresearch/pubs/13054/index.cfm


Project ID: FHWA-PROJ-11-0067
Project Name: Vehicle Positioning and Communications Test Implementation for Initial Capability—Telecommunications and Positioning: Phase II
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0064
Project Name: Vehicle-to-Infrastructure Communications for Safety Concept of Operations (ConOps) Documentation
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0046
Project Name: Verification, Refinement, and Applicability of Long-Term Pavement Performance (LTPP) Classification Scheme
Status: Completed
Project Deliverable URL(s):
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/13091/index.cfm


Project ID: FHWA-PROJ-14-0053
Project Name: Video Deidentification in the Automobile Environment
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-11-0186
Project Name: Warm-Mix Asphalt Experiment Design
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0093
Project Name: Warning Sign Legends for Emergency Incidents
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-09-0031
Project Name: Wavetronix Higher Performance Traffic Detector (091-FH3-011)
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-10-0059
Project Name: Wind Effects on Bridge Stay Cables
Status: Active
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0033
Project Name: Wood Preservative Treatment Guide for Historic Covered Bridges
Status: Completed
Project Deliverable URL(s):
http://www.fpl.fs.fed.us/documnts/fplgtr/fpl_gtr205.pdf


Project ID: FHWA-PROJ-08-0026
Project Name: Wood Species Identification and Field Grading
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-08-0035
Project Name: World Guide to Covered Bridges Database, Geographic Information Systems, and Web Site
Status: Completed
Project Deliverable URL(s):
Deliverable URL not yet available

Project ID: FHWA-PROJ-13-0004
Project Name: Wrap-up of Various Corrosion Studies
Status: Proposed
Project Deliverable URL(s):
Deliverable URL not yet available
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000
Turner-Fairbank Highway Research Center | 6300 Georgetown Pike | McLean, VA | 22101