Navigation Notices
Title | Date | UMR Mile | Subject |
PN 16-17 | 08/26/16 | 0.8 | Lock Closure Kaskaskia River RM 0.8 |
PN 16-14D | 08/26/16 | 46-38 | Rock Removal Dredging |
PN 16-14C | 08/18/16 | 46-38 | Rock Removal Dredging |
PN 16-14B | 08/09/16 | 46-38 | Rock Removal Dredging |
PN 16-15 | 07/14/16 | 200 - 201 | BANKLINE REVETMENT Upper Mississippi River mile 200-201 |
PN 16-14 | 07/11/16 | 0.8 | SCHEDULED PARTIAL LOCK CLOSURE Jerry F. Costello Lock |
PN 16-13 | 06/16/16 | 200.5 | SCHEDULED CLOSURE - Melvin Price Locks & Dam Upper Mississippi River mile 200.5 |
PN 16-12 | 06/03/16 | 0-300 |
CHANNEL MAINTENANCE DREDGING - USACE Dredge Potter Upper Mississippi River mile 0 - 300 |
PN 16-11 | 05/24/16 | 185.5 | SCHEDULED LOCK CLOSURE Locks 27, Main Chamber |
PN 16-10A | 05/24/16 | 273.4 | EMERGENCY CLOSURE CANCELED Culvert Valve Repairs Lock & Dam 24 |
PN 16-10 | 05/19/16 | 273.4 | EMERGENCY CLOSURE Culvert Valve Repairs Lock & Dam 24 |
PN 16-9 | 05/02/16 | 273.4 | SCHEDULED LOCK CLOSURE Lock & Dam 24 |
PN 16-7B | 04/18/16 | 44-40 | River Closure - Canceled |
PN 16-8 | 04/12/16 | 287.5 | Bankline construction activity - Red shanks conservation area |
PN 16-7A | 04/08/16 | 44-40 | Scheduled Lock Closure, Lock 27 Main Chamber |
PN 16-07 | 04/07/16 | 42-20 | Scheduled Lock Closure, Lock 27 Main Chamber |
PN 16-06 | 04/06/16 | 185.5 | Scheduled Lock Closure, Lock 27 Main Chamber |
PN 16-05 | 03/09/16 | 185.5 | Scheduled Lock Closure, Lock 27 Main Chamber |
PN 16-04 | 03/03/16 | 185.5 | Lock Closure, Lock 27 Main Chamber |
PN 16-03A | 2/25/16 | 185.5 | Lock 27, Main and Auxiliary Locks Closure Canceled |
PN 16-03 | 2/23/16 | 185.5 | Lock 27, Main and Auxiliary Locks Closure |
PN 16-02B | 2/29/16 | 273.4 | ICE RESTRICTIONS Lock and Dam 24 Canceled |
PN 16-02A | 1/25/16 | 273.4 | ICE RESTRICTIONS Lock and Dam 24 |
PN 16-02 | 1/19/16 | 273.4 | ICE RESTRICTIONS Lock and Dam 24 |
PN 16-01 | 1/07/16 | 201.5 | SCHEDULED LOCK CLOSURE Mel Price Auxiliary Lock Chamber |
PN 15-22A | 1/04/16 | 185.5 | HIGH WATER LOCK CLOSURE - CANCELLED LOCKS 27 MAIN CHAMBER |
PN 15-19A | 1/04/16 | 185.5 | HIGH WATER LOCK CLOSURE - CANCELLED Locks 27 Auxiliary Lock |
PN 15-20A | 1/04/16 | 201.5 | HIGH WATER LOCK CLOSURE - CANCELLED Locks 27 Auxiliary Lock |
PN 15-24A | 12/31/15 | 273.2 | HIGH WATER LOCK CLOSURE - CANCELLED Mel Price Aux Lock Chamber |
PN 15-23A | 12/31/15 | 241.2 | HIGH WATER LOCK CLOSURE - CANCELLED Lock and Dam 25 |
PN 15-24 | 12/29/15 | 273.2 | HIGH WATER LOCK CLOSURE Lock and Dam 24 |
PN 15-23 | 12/29/15 | 241.2 | HIGH WATER LOCK CLOSURE Lock and Dam 25 |
PN 15-22 | 12/28/15 | 185.5 | HIGH WATER LOCK CLOSURE LOCKS 27 MAIN CHAMBER |
PN 15-21 | 12/28/15 | 0.8 | HIGH WATER LOCK CLOSURE Jerry Costello Lock and Dam |
PN 15-20 | 12/27/15 | 201.5 | HIGH WATER LOCK CLOSURE Mel Price Auxiliary Lock Chamber |
PN 15-19 | 12/27/15 | 185.5 | HIGH WATER LOCK CLOSURE Locks 27 Auxiliary Lock |
PN 15-18 | 12/10/15 | 185.5 | SCHEDULED LOCK CLOSURE Locks 27, Main Chamber Upper Mississippi River, Mile 185.5 |
PN 15-17 | 12/08/15 | 185.5 | Scheduled lock closure locks 27 auxiliary chamber upper mississippi river, mile 185.5 |
PN 15-16 | 11/24/15 | 30-26 | Inland Electronic Navigation Chart Update Sailing Line Adjustment (See Link) |
PN 15-15 | 11/19/15 | 185.5 | SCHEDULED LOCK CLOSURE MAIN CHAMBER, LOCKS 27 |
PN 15-14A | 11/17/15 | 46-38 | Rock Removal dredging - Postponed |
PN 15-14 | 11/06/15 | 46-38 | Rock Removal dredging |
PN 15-13 | 10/28/15 | 185.5 | SCHEDULED LOCK CLOSURE AUXILIARY LOCK, LOCKS 27 |
PN 15-12 | 10/26/15 | 185.5 | SCHEDULED LOCK CLOSURE AUXILIARY LOCK, LOCKS 27 |
PN 15-11A | 9/29/15 | 185.5 | SCHEDULED LOCK CLOSURE AUXILIARY LOCK, LOCKS 27 |
PN 15-11 | 9/24/15 | 185.5 | SCHEDULED LOCK CLOSURE AUXILIARY LOCK, LOCKS 27 |
PN 15-10 | 8/21/15 | 241.2 | Rip Rap Installment Lock and Dam Spillway |
PN 15-3B | 8/3/15 | 185.5 | Schedule Closure Mel Price wire rope inspection |
PN 15-2A | 7/29/15 | 185.5 | REVETMENT MAINTENANCE CHAIN OF ROCKS CANAL |
PN 15-5A | 7/29/15 | 185.5 | High Water Lock Closure-Aux Lock 27 Cancelled |
PN 15-9 | 7/14/15 | 185.5 | Maintenance Lock Closure |
PN 15-8A | 7/14/15 | Kaskia | High Water lock Closure - Cancelled |
PN 15-8 | 7/11/15 | Kaskia | High Water Lock Closure |
PN 15-7A | 6/30/15 | 241.2 | High water lock closure - LD 25 - Cancelled |
PN 15-7 | 6/29/15 | 241.2 | High water lock closure - LD 25 |
PN 15-6A | 6/30/15 | 273.2 | HIGH WATER LOCK CLOSURE Lock and Dam 24 - Cancelled |
PN 15-6 | 6/29/15 | 273.2 | HIGH WATER LOCK CLOSURE Lock and Dam 24 |
PN 15-5 | 6/18/15 | 185.1 | High water lock closure - Lock 27, Auxiliary Lock, mile 185.1 UMR |
PN 15-4 | 6/17/15 | Kaskia | High water lock closure - Jerry Costello Lock and Dam |
PN 15-3 Rev A | 6/8/15 | 200.8 | POSTPONED SCHEDULED LOCK CLOSURE Mel Price Locks and Dam |
PN 15-3 | 5/26/15 | 200.8 | SCHEDULED LOCK CLOSURE Mel Price Locks and Dam |
PN 15-2 | 4/7/15 | 185.5 | SCHEDULED CLOSURES LOCK 27 - MAIN LOCK |
PN 15-1 | 3/30/15 | 51.9 | GEOTECHNICAL BORINGS, Cape Girardeau, MO Upper Mississippi River |
PN 14-12 Rev A | 3/23/15 | Lock 27 | LOCKS 27 Scheduled Closures |
PN 14-14 rev F | 1/18/15 | 185.5 | SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev E | 1/17/15 | 185.5 | SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev D | 2/4/15 | 185.5 | SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev C | 2/2/5 | 185.5 | SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev B | 1/29/15 | 185.5 | SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev A | 12/30/14 | 185.5 | Locks 27 (UMR 185.5) - Scheduled Closures to the Main Lock |
PN 14-14 | 12/30/14 | 185.5 | Locks 27 (UMR 185.5) - Scheduled Closures to the Main Lock |
PN 14-13 | 12/04/14 | 200.8 | Auxiliary Lock Closure |
PN 14-11a | 11/16/14 | Mel Price | Mel Price Main Lock Closure Delayed |
PN 14-12 | 11/6/14 | Lock 27 | Locks 27 Scheduled Closures |
PN 14-11 | 11/6/14 | Mel Price | Mel Price Main Lock Closure |
PN 14-10 | 10/15/14 | Mel Price | Mel Price Aux Lock Dredging Closure |
PN 14-09 | 10/02/14 | Lock 27 | Lock 27 Aux Chamber High Water Closure |
PN 14-08a | 9/25/14 | Lock 27 | Lock 27 Aux Chamber Reopen |
PN 14-08 | 9/12/14 | Lock 27 | Lock 27 Aux Chamber High Water Closure |
PN 14-07 | 9/3/14 | Lock 27 | Lock 27 Aux Chamber High Water Closure |
PN 14-06 | 8/8/14 | Lock 27 | Lock 27 Aux Chamber Width Restriction |
PN 14-05 | 4/29/14 | Lock 27 | High Water Closure |
PN 14-04 | 4/4/14 | Lock 27 | Lock 27 Closure |
PN 14-03 | 2/5/14 | Lock 27 | Width Restriction |
PN 14-02 Rev A | 1/13/14 | Lock 27 | Width Restriction |
PN 14-02 | 1/8/14 | Lock 27 | Width Restriction |
PN 14-01 | 12/17/13 | Lock 27 | Walkway Bridge |
PN 13-11 | 9/26/13 | 0-195.0 | Weir Degradation |
PN 13-10 A (Revised) | 9/25/13 | Mel Price | Auxiliary Lock Dredging |
PN 13-10 | 9/20/13 | Mel Price | Mel Price Lock and Dam Auxiliary Lock Dredging |
PN 13-09 | 9/20/13 | 184 | Upper Mississippi River Mile 184 |
PN 13-05 A (Revised) | 8/5/2013 | Lock 27 | Lock 27 Auxiliary Closure |
PN 13-08 | 8/5/2013 | Mel Price | Mel Price Lock and Dam |
PN 13-07 | 8/1/2013 | 222.4 | Dike 222.4 (R) |
PN 13-06 A (Revised) | 6/24/13 | Lock 27 | LOCKS 27 Assist Vessel Requirement Suspended |
PN 13-04 | 6/14/13 | Kaskaskia | Kaskaskia River Lock and Dam, IL- Now Re-opened after flooding |
PN 13-06 | 6/14/13 | 185.0 | Lock 27 Assist Vessel |
PN 13-05 | 4/11/13 | 185.0 | Lock 27 |
PN 13-04 | 4/04/13 | 300.0 | Lock 25 Approach (PDF Document Here) |
PN 13-03 Rev A | 3/11/13 | 185.5 | Lock 27 Drilling Operations |
PN 13-03 | 3/6/13 | 185.5 | Lock 27 Drilling |
PN 13-02 | 3/1/13 | 185.5 | Lock 27 MainOpen |
PN 13-01 Rev | 01/04/13 | 185.0 | Lock 27 Dredging |
PN 13-01 | 01/04/13 | 185.0 | Lock 27 Dredging |
PN 12-19 | 12/18/12 | 241.4 | Locks 25 |
PN 12-18 | 12/18/12 | 179.6 - 2.0 | Stream Gaging Stations |
PN 12-17 | 11/26/12 | 164.0 | REMNANT DIKE AND WEIR MAINTENANCE |
PN 12-16 | 10/23/12 | 185.5 | Lock 27 |
PN 12-15 | 10/03/12 | 185.5 | Locks 27 |
IW 12-50 | 12/05/12 | IL | TJ O’Brien Lock & Dam, RM 326.5 |
PN 12-17 | 11/27/12 | 164.0 - 5.7 | Remant Dike and Weir Maintenance |
PN 12-10 REV | 10/02/12 | 241.4 | Lock 25 |
PN 12-10 REV | 9/28/12 | 241.4 | Lock 25 |
PN 12-10 REV | 9/21/12 | 241.4 | Lock 25 |
PN 12-14 | 9/15/12 | 185.5 | Lock 27 |
PN 12-13 | 9/14/12 | 241.4 | Locks 25 |
PN 12-12 | 9/4/12 | 184 | Dredging, Upper Mississippi River |
PN 12-11A | 9/4/12 | 46-38 | Rock Pinnacles |
PN 12-01 | 8/28/2012 | Kaskaskia | Kaskaskia Lock and Dam |
PN 12-11 | 8/11/2012 | 43 | Rock Pinnacles at UMR Miles 43 – 42 (5 Thebes Gage) |
PN 12-10 | 8/9/2012 | 241.4 | Locks 25, Upper Mississippi River Mile 241.4 |
PN 12-09 | 8/8/2012 | 200.5 | Mel Price Locks and Dam |
PN 12-08 | 6/14/2012 | 241 | UMR MILES 241 Lock and Dam 25 |
PN 12-07 Rev A | 8/3/2012 | 185.5 | Locks 27 |
PN-12-07 | 6/13/2012 | 185.5 | Locks 27, Upper Mississippi River Mile 185.5 |
PN 12-07 | 6/5/2012 | 241.0 | UMR MILES 241 Lock and Dam 25 |
PN 12-06 | 6/5/2012 | 200.8 | Safety Notice to Mariners |
PN 12-05 | 5/1/2012 | 300 to 98.6 | Construction or Maintenance of River Structures and Revetments |
PN 12-04 | 5/1/2012 | 98.6 TO 0 | Construction or Maintenance of River Structures and Revetments |
Closure | 2/8/12 | Mel Price | Emergency closure at Mel Price L&D due to maintenance.
Barring any further problems, they should be operational by 1500 tomorrow 2/9/12S. Presently vessels are using self help procedures for locking through the auxiliary chamber. |
PN 12-03 | 01/12/12 | 241.4 | Locks 25 |
PN 12-02 | 01/12/12 | 45 and 97 | Rock Removal & Weir Construction |
PN 12-01 | 10/26/11 | 185.5 | Locks 27 |