|
LITTLE ROCK, AR - The demolition of the concrete arch spans of the Broadway Bridge in Little Rock has been rescheduled to 8:00 a.m. on October 15. The main navigation channel is scheduled to be closed from 7:30 a.m. – 9:30 a.m. [Read More]
Published: Oct-14-16
LITTLE ROCK, Ark. - The concrete arch spans of the Broadway Bridge in Little Rock are scheduled to be demolished at 1:00 p.m. on October 14. [Read More]
Published: Oct-13-16
LITTLE ROCK, Ark. - The U.S. Coast Guard has lifted the closure of the navigation channel. [Read More]
Published: Oct-13-16
LITTLE ROCK, Ark. - The process of removing the steel arch from the main navigation channel is ongoing. [Read More]
Published: Oct-12-16
LITTLE ROCK, Ark. - The steel arch span of the Broadway Bridge in Little Rock is scheduled to be demolished this morning at 10:00am. [Read More]
Published: Oct-11-16
MKARNS - Mariners are advised that lockage times at Dardanelle Lock (No. 10) NM 205.5 have returned to normal. The failed valve has been returned to service. [Read More]
Published: Oct-04-16
Little Rock, Ark - To ensure the safety of life and property on the navigable waters during demolition of the Broadway Bridge, the U.S. Coast Guard is establishing a safety zone on the Arkansas River from mile marker 118.6 to mile marker 119.6. [Read More]
Published: Sep-27-16
MKARNS - David D. Terry Lock (No. 6) reopened to navigation traffic at 5 p.m. on Sept. 3. [Read More]
Published: Sep-07-16
MKARNS - Tow haulage equipment at David D. Terry Lock (No. 6) will be unavailable from 4 p.m. August 22 until 7 a.m. August 23. [Read More]
Published: Aug-22-16
MKARNS - Mariners are advised that lockages at Dardanelle Lock (No. 10) NM 205.5, will require an additional 15 minutes each time the lock level is lowered to the downstream water level. [Read More]
Published: Aug-17-16
|