The scope of this study is a 6.8 mile span of US 90A in Fort Bend County that runs from State Highway (SH) 6 to Loop 762.
Current Conditions
The current roadway has 4 lanes and has an average right-of-way width of 175 feet. Drainage is primarily open ditches with short section of curb-and-gutter between Cunningham Creek drive and SH 99.
Proposed Improvements
Proposed improvements between SH 6 and SH 99 include:
Proposed improvements between SH 99 and Loop 762 include:
No commercial or residential displacements are anticipated.
Partners
This study is a partnership between TxDOT and the Federal Highway Administration
Contact Us
Pat Henry, P.E.
TxDOT Houston District
PO Box 1386
Houston, TX 77k251-1386
Phone: (713) 802-5241
Email