Page Options
Up Arrow
Project Studies: Abilene District

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Description
Abilene I-20 Frontage Road Conversion Improvements to 4.5 miles of I-20 from Pine Street to Loop 322
Abilene US 83/US 84 Possible improvements to six miles of US 83/US 84 from Iberis Road S. to the US 83/US 84 split