IH 45 North (from FM 1960 to Loop 366 South)

The scope of this study is an 18-mile length of IH 45 North from FM 1960 to Loop 336 South.

Current Conditions

The existing IH 45 (N) is a multi-lane divided facility typically consisting of 3-lane frontage roads, 8 mainlanes (four in each direction), 10 ft inside shoulders and 12 ft outside shoulders. 

Proposed Improvements

The proposed project would consist of the following:
  • Utilizing the existing concrete pavement in the center of the mainlanes for two HOV diamond lanes (one in each direction)
  • Minor widening of IH 45 (N) at four existing overpass locations
  • Restriping of the freeway

Partners

This study is a partnership between TxDOT and the Federal Highway Administration.
 

Public Involvement: