Apollo 9

From Wikipedia, the free encyclopedia
Jump to: navigation, search
Apollo 9
Gumdrop Meets Spider - GPN-2000-001100.jpg
David Scott performs an EVA from Command Module Gumdrop, seen from docked Lunar Module Spider
Mission type Lunar Module test flight
Operator NASA[1]
COSPAR ID CSM: 1969-018A
LM: 1969-018C
SATCAT № CSM: 3769
LM: 3771
Mission duration 10 days, 1 hours, 54 seconds
Spacecraft properties
Spacecraft Apollo CSM-104
Apollo LM-3
Manufacturer CSM: North American Rockwell
LM: Grumman
Launch mass CSM: 26,801 kilograms (59,086 lb)
LM: 14,575 kilograms (32,132 lb)
Crew
Crew size 3
Members James A. McDivitt
David R. Scott
Russell L. Schweickart
Callsign CSM: Gumdrop
LM: Spider
EVAs 1
EVA duration 77 minutes
Start of mission
Launch date March 3, 1969, 16:00:00 (1969-03-03UTC16Z) UTC
Rocket Saturn V SA-504
Launch site Kennedy LC-39A
End of mission
Decay date October 23, 1981 (LM)
Landing date March 13, 1969, 17:00:54 (1969-03-13UTC17:00:55Z) UTC
Landing site North Atlantic Ocean
23°15′N 67°56′W / 23.250°N 67.933°W / 23.250; -67.933 (Apollo 9 splashdown)
Orbital parameters
Reference system Geocentric
Regime Low Earth orbit
Perigee 204 kilometers (127 mi)
Apogee 497 kilometers (309 mi)
Inclination 33.8 degrees
Period 91.55 minutes
Epoch March 5, 1969[2]
Docking with LM
Docking date March 3, 1969, 19:01:59 UTC
Undocking date March 7, 1969, 12:39:06 UTC
Docking with LM Ascent Stage
Docking date March 7, 1969, 19:02:26 UTC
Undocking date March 7, 1969, 21:22:45 UTC

Apollo-9-patch.png Apollo9 Prime Crew.jpg
Left to right: McDivitt, Scott, Schweickart


Apollo program
← Apollo 8 Apollo 10

Apollo 9 was the third manned mission in the United States Apollo space program and the first flight of the Command/Service Module (CSM) with the Lunar Module (LM). Its three-person crew, consisting of Commander James McDivitt, Command Module Pilot David Scott, and Lunar Module Pilot Rusty Schweickart, tested several aspects critical to landing on the Moon, including the LM engines, backpack life support systems, navigation systems, and docking maneuvers. The mission was the second manned launch of a Saturn V rocket.

After launching on March 3, 1969, the crewmen spent ten days in low Earth orbit. They performed the first manned flight of a LM, the first docking and extraction of a LM, two spacewalks (EVA), and the second docking of two manned spacecraft—two months after the Soviets performed a spacewalk crew transfer between Soyuz 4 and Soyuz 5. The mission proved the LM worthy of manned spaceflight. Further tests on the Apollo 10 mission would prepare the LM for its ultimate goal, landing on the Moon.

Crew[edit]

Position Astronaut
Commander James A. McDivitt
Second and last spaceflight
Command Module Pilot David R. Scott
Second spaceflight
Lunar Module Pilot Russell L. Schweickart
Only spaceflight
Like Apollo 8, the crew of Apollo 9 consisted of two Gemini
veterans and one rookie.

Backup crew[edit]

Position Astronaut
Commander Charles Conrad, Jr,
Command Module Pilot Richard F. Gordon, Jr.
Lunar Module Pilot Alan L. Bean
The backup crew became the prime crew on Apollo 12.

Clifton Williams was the original backup Lunar Module Pilot on Conrad's crew, but was killed in October 1967 when the T-38 he was flying crashed near Tallahassee.

Support crew[edit]

Flight directors[edit]

Mission parameters[edit]

LM - CSM docking[edit]

  • Undocked: March 7, 1969 - 12:39:36 UTC
  • Re-docked:March 7, 1969 - 19:02:26 UTC

EVA[edit]

  • Schweickart - EVA - LM forward hatch
    • Start: March 6, 1969, 16:45:00 UTC
    • End: March 6, 1969, 17:52:00 UTC
    • Duration: 1 hour, 07 minutes
  • Scott - Standup EVA - CM side hatch
    • Start: March 6, 1969, 17:01:00 UTC
    • End: March 6, 1969, 18:02:00 UTC
    • Duration: 1 hour, 01 minute

Original mission profile[edit]

In April 1966, McDivitt, Scott, and Schweickart were selected as the backup crew to Gus Grissom, Ed White, and Roger Chaffee for the planned first manned Earth orbital test flight of the Command/Service Module, designated AS-204 expected to fly in late 1966. This was to be followed by a second similar flight, AS-205, to be crewed by Wally Schirra, Walter Cunningham, and Donn Eisele.

However, delays in the CSM development pushed AS-204 into 1967. By December 1966, the original AS-205 mission was cancelled, Schirra's crew was named as Grissom's backup, and McDivitt's crew was promoted to prime crew for a new second mission, to fly the complete Apollo spacecraft, launching the CSM and LM on two separate Saturn IB vehicles into a low Earth orbit. They immediately began training for this flight, designated AS-205/208, expected to occur in late 1967.[3]

On January 27, 1967, Grissom's crew were conducting a launch-pad test for their planned February 21 mission, which they named Apollo 1, when a fire broke out in the cabin, killing all three men and putting an 18-month hold on the manned program while the Command Module (CM) was redesigned for safety.

As it turned out, a 1967 launch of AS-205/208 would have been impossible even absent the Apollo 1 accident, as problems with the LM delayed its first unmanned test flight until January 1968. NASA was able to use the 18-month hiatus to catch up with development and unmanned testing of the LM and the Saturn V launch vehicle.

By October 1967, planning for manned flights resumed, with Apollo 7 being the first Earth orbit CSM flight (now known as the C mission) in October 1968 given to Schirra's crew, and McDivitt's mission (now known as the D Mission) following as Apollo 8 in December 1968, using a single Saturn V instead of the two Saturn IBs. This would be followed by a higher Earth orbit flight (E Mission), to be crewed by Frank Borman, Michael Collins, and William Anders in early 1969.

However, continued LM production problems meant that the D mission would not be able to fly until the spring of 1969, so NASA officials created another mission for Apollo 8 using the Saturn V to launch only the CSM on the first manned flight to orbit the Moon, and the E mission was cancelled as unnecessary. Since McDivitt's crew had trained for the first LM mission, and he expressed the personal desire to fly it, the Borman and McDivitt crews were swapped, and the D mission became Apollo 9.

The crew swap also affected who would be the first crew to land on the Moon; when the crews for Apollo 8 and 9 were swapped, their backup crews were also swapped. Since the rule of thumb was for backup crews to fly as prime crew three missions later, this put Neil Armstrong's crew (Borman's backup) in position for the first landing mission Apollo 11 instead of Pete Conrad's crew, who made the second landing on Apollo 12.

Mission highlights[edit]

Apollo 9 launches from Kennedy Space Center, March 3, 1969

Apollo 9 was the first space test of the complete Apollo spacecraft, including the third critical piece of Apollo hardware besides the Command/Service Module and the Saturn V launch vehicle—the Lunar Module. It was also the first space docking of two vehicles with an internal crew transfer between them. For ten days, the astronauts put both Apollo spacecraft through their paces in Earth orbit, including an undocking and redocking of the lunar lander with the command vehicle, just as the landing mission crew would perform in lunar orbit. Apollo 9 gave proof that the Apollo spacecraft were up to this critical task, on which the lives of lunar landing crews would depend.

For this and all subsequent Apollo flights, the crews were allowed to name their own spacecraft (the last spacecraft to have been named was Gemini 3). The gangly LM was named Spider, and the CSM was labeled Gumdrop because of the Command Module's shape, and also the blue wrapping in which the craft arrived at Kennedy Space Center. These names were required as radio call signs when the vehicles flew independently.

Schweickart and Scott performed an EVA—Schweickart checked out the new Apollo spacesuit, the first to have its own life support system rather than being dependent on an umbilical connection to the spacecraft, while Scott filmed him from the Command Module hatch. Schweickart was due to carry out a more extensive set of activities to test the suit, and demonstrate that it was possible for astronauts to perform an EVA from the Lunar Module to the Command Module in an emergency, but as he had been suffering from space sickness the extra tests were scratched.

Apollo 9 approaches splashdown in the Atlantic Ocean, March 13, 1969

McDivitt and Schweickart later test-flew the LM, and practiced separation and docking maneuvers in Earth orbit. They flew the LM up to 111 miles (179 km) from Gumdrop, using the engine on the descent stage to propel them originally, before jettisoning it and using the ascent stage to return. This test flight represented the first flight of a manned spacecraft that was not equipped to reenter the Earth's atmosphere.

The splashdown point was 23 deg 15 min N, 67 deg 56 min W, 180 miles (290 km) east of the Bahamas and within sight of the recovery ship USS Guadalcanal. Apollo 9 was the last spacecraft to splash down in the Atlantic Ocean.

The Command Module was displayed at the Michigan Space and Science Center, Jackson, Michigan, until April 2004 when the center closed.[citation needed] In May 2004, it was moved to the San Diego Aerospace Museum (now named the San Diego Air & Space Museum). The LM ascent stage orbit decayed on October 23, 1981, the LM descent stage (1969-018D) orbit decayed March 22, 1969. The S-IVB stage J-2 engine was restarted after Lunar Module extraction and propelled the stage into solar orbit by burning to depletion.

The Saturn IVB third stage became a derelict object where it would continue to orbit the Sun for many years. As of November 2014, it remains in orbit.[4]

Mission insignia[edit]

The circular patch shows a drawing of a Saturn V rocket with the letters USA on it. To its right, an Apollo CSM is shown next to an LM, with the CSM's nose pointed at the "front door" of the LM rather than at its top docking port. The CSM is trailing rocket fire in a circle. The crew's names are along the top edge of the circle, with APOLLO IX at the bottom. The "D" in McDivitt's name is filled with red to mark that this was the "D mission" in the alphabetic sequence of Apollo missions. The patch was designed by Allen Stevens of Rockwell International.[5]

Summary of maneuvers[edit]

T + Time Event Burn Time Delta-Velocity Orbit
T + 00:00:00 Lift-off
T + 00:02:14.34 S-IC center engine cut-off 141 s
T + 00:02:42.76 S-IC engine cut-off 169 s
T + 00:02:45.16 S-II ignition
T + 00:03:13.5 S-II skirt separation
T + 00:03:18.3 LES jettison
T + 00:08:56.22 S-II cut-off
T + 00:08:57 S-II cutoff + separation, S-IVB ignition
T + 00:11:04.66 S-IVB cutoff + orbital insertion 127.4 s 191.3 × 189.5 km
T + 02:41:16 CSM/S-IVB separation
T + 03:01:59.3 CSM/LM docking
T + 04:08:09 Spacecraft/S-IVB separation
T + 05:59:01.07 First Service Propulsion System (SPS) test 5.1 s +10.4 m/s 234.1 × 200.7 km
T + 22:13:04.07 Second SPS test 110 s +259.2 m/s 351.5 × 199.5 km
T + 25:17:39.27 Third SPS test 281.6 s +782.6 m/s 503.4 × 202.6 km
T + 28:24:41.37 Fourth SPS test 28.2 s -91.45 m/s 502.8 × 202.4 km
T + 49:41:34.46 Docked DPS test 369.7 s -530.1 m/s 499.3 × 202.2 km
T + 54:26:12.27 Fifth SPS test 43.3 s -175.6 m/s 239.3 × 229.3 km
T + 92:39:36 CSM/LM undocking
T + 93:02:54 CSM separation maneuver 10.9 s -1.5 m/s
T + 93:47:35.4 LM Descent Propulsion System (DPS) phasing maneuver 18.6 s +27.6 m/s 253.5 × 207 km
T + 95:39:08.6 LM DPS insertion maneuver 22.2 s +13.1 m/s 257.2 × 248.2 km
T + 96:16:06.54 LM concentric sequence initiation maneuver/Descent stage jettison 30.3 s -12.2 m/s 255.2 × 208.9 km
T + 96:58:15 LM Ascent Propulsion System (APS) constant delta height maneuver 2.9 s -12.6 m/s 215.6 × 207.2 km
T + 97:57:59 LM terminal phase finalization maneuver 34.7 s +6.8 m/s 232.8 × 208.5 km
T + 99:02:26 CSM/LM docking
T + 101:22:45 LM ascent stage jettison
T + 101:32:44 Post-jettison CSM separation maneuver 7.2 s +0.9 m/s 235.7 × 224.6 km
T + 101:53:15.4 LM APS burn to depletion 350 s +1,643.2 m/s 6,934.4 × 230.6 km
T + 123:25:06.97 Sixth SPS test 1.29 s -11.5 m/s 222.6 × 195.2 km
T + 169:39:00.36 Seventh SPS test 25 s +199.6 m/s 463.4 × 181.1 km
T + 240:31:14.84 Deorbit burn (SPS) 11.6 s -99.1 m/s 442.2 × -7.8 km
T + 240:36:03.8 SM jettison
T + 241:00:54 Splashdown


Pictures[edit]

Spacecraft location[edit]

The Apollo 9 Command Module Gumdrop (1969-018A) is on display at the San Diego Air & Space Museum, San Diego, California. Its Service Module (SM) was jettisoned shortly after the deorbit burn and decayed during reentry of the Command Module.

The ascent stage of LM-3 Spider (1969-018C) decayed on October 23, 1981.[6]

The descent stage of LM-3 Spider (1969-018D) decayed March 22, 1969.[6]

The upper stage of the Apollo 9 Saturn V, S-IVB-504N, (1969-018B) remains in heliocentric (solar) orbit as of 2014.[4]

See also[edit]

Notes[edit]

References[edit]

 This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

  1. ^ Orloff, Richard W. (September 2004) [First published 2000]. "Table of Contents". Apollo by the Numbers: A Statistical Reference. NASA History Division, Office of Policy and Plans. NASA History Series (Washington, D.C.: NASA). ISBN 0-16-050631-X. LCCN 00061677. NASA SP-2000-4029. Retrieved June 27, 2013. 
  2. ^ McDowell, Jonathan. "SATCAT". Jonathan's Space Pages. Retrieved March 23, 2014. 
  3. ^ "Apollo Image Gallery: Early Apollo". Project Apollo Archive. Kipp Teague. Retrieved August 3, 2010. 
  4. ^ a b "Saturn S-IVB-504N - Satellite Information". Satellite database. Heavens-Above. Retrieved September 23, 2013. 
  5. ^ Hengeveld, Ed (May 20, 2008). "The man behind the Moon mission patches". collectSPACE. Retrieved July 18, 2009.  "A version of this article was published concurrently in the British Interplanetary Society's Spaceflight magazine."
  6. ^ a b "Apollo 9". National Space Science Data Center. NASA. Retrieved April 7, 2014. 

Bibliography[edit]

  • Baker, David (1982). The History of Manned Space Flight (1st ed.). New York: Crown Publishers. ISBN 0-517-54377-X. 

External links[edit]

NASA reports

Multimedia