Early Site Permit Application - PSEG Site
PSEG Power, LLC, and PSEG Nuclear, LLC (PSEG) submitted an application for an early site permit (ESP) for PSEG Site on May 25, 2010. This application uses the Plant Parameter Envelope (PPE) approach which means no reactor design has been selected. The application includes a complete and integrated emergency plan, and does not include a Limited Work Authorization (LWA). For details (including the application, related review schedule, and associated staff documentation), see the following topics on this page:
- Application Information
- Review Schedule
- Applicant Documents
- NRC Documents
- Requests for Additional Information
- Contacts
Application Information
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
The following table provides access to the ESP Application that PSEG Power, LLC, and PSEG Nuclear, LLC (PSEG) submitted for PSEG Site.
Part | Description | Revision |
---|---|---|
1 | Administrative Information |
Rev. 1 Rev. 0 |
2 | Site Safety Analysis Report (SSAR) |
Rev. 1 Rev. 0 |
Quality Assurance Program Document (Relates to SSAR, Chapter 17) |
Rev. 1 Rev. 0 |
|
3 | Environmental Report |
Rev. 1 Rev. 0 |
4 | Site Redress Plan | Rev. 0 |
5 | Emergency Plan |
Rev. 1 Rev. 0 |
6 | Sensitive Information [This part contains information that is withheld from the public per 10 CFR 2.390] |
Review Schedule
Key Milestones | Completion Date Actual - A Target - T |
---|---|
Application Tendered | 05/25/10 - A |
Acceptance Review | |
Acceptance Review Start |
06/03/10 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
08/04/10 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
11/29/10 - A |
Safety Review | |
Phase A - Requests for Additional Information (RAIs) and Supplemental RAIs issued |
In Evaluation |
Phase B - Advanced Safety Evaluation (SE) with no Open Items developed |
11/2013 - T |
Phase C - ACRS meeting on Advanced SE |
03/2014 - T |
Phase D - Final Safety Evaluation Report (SER) issued |
07/2014 - T |
Environmental Review | |
Phase 1 - Scoping Period Ends |
12/2010 - A |
Phase 2 - Draft Environmental Impact Statement (EIS) issued to EPA |
06/2013 - T |
Phase 3 - Public comment period for Draft EIS ends |
10/2013 - T |
Phase 4 - Final EIS issued to EPA |
06/2014 - T |
Hearing | |
Commission or ASLB hold mandatory hearing |
|
License | |
Commission decision on issuance of Early Site Permit |
Applicant Documents
The following table provides access to the documents that PSEG Power, LLC, and PSEG Nuclear, LLC (PSEG) submitted for PSEG Site.
Date | Description |
---|---|
06/11/12 | Cover Letter - Re-Submittal of Revision 1 of the Early Site Permit Application for the PSEG Site |
05/21/12 | Cover Letter - Submittal of Revision 1 of the Early Site Permit Application for the PSEG Site |
09/10/10 | Letter to NRC - Early Site Permit Application Online Reference Portal (Response to NRC Letter on the Subject, Dated 08/23/10) |
09/08/10 | Letter to NRC - Federal Consistency Determination by State of New Jersey Department of Environmental Protection |
08/18/10 | Letter to NRC - Service of Notice of Availability of an Application for an Early Site Permit |
07/29/10 | Cover letter - Offsite Radiological Emergency Response Plans for the Early Site Permit Application for the PSEG Site - Revised State of Maryland Offsite Radiological Emergency Response Plans, Rev. June 2010 |
07/29/10 | Supplement: Submittal of Revision to Site Safety Analysis Report Section 13.6 in Support of Early Site Permit Application for PSEG Site |
07/07/10 | Supplement: Submittal of Initial Radionuclide Concentrations Used in Radioactive Transport Analysis in Support of Early Site Permit Application for the PSEG Site |
07/06/10 | Supplement: Cover letter - Submittal of Meteorological Data in Support of Early Site Permit Application for the PSEG Site (Data in ASCII Text Data File format) |
06/22/10 | Supplement: Submittal of Meteorological Data in Support of Early Site Permit Application for the PSEG Site (Data in EXCEL Spreadsheet format) |
06/09/10 | Documents in support of Early Site Permit Application for the PSEG Site - Cultural and Historic Resource Reports |
06/04/10 | Document in Support of Early Site Permit Application for the PSEG Site - Alternative Site Evaluation Study |
05/25/10 | Cover letter - PSEG Power, LLC, Application for Early Site Permit for the PSEG Site |
05/25/10 | Cover letter - PSEG Power, LLC, Offsite Radiological Emergency Response Plans for the Early Site Permit Application for the PSEG Site |
05/25/10 | Cover letter - PSEG Power, LLC, Quality Assurance Program Document for the Early Site Permit Application for the PSEG Site |
02/11/10 | Letter to NRC - Early Site Permit Application Expected Submission Date |
NRC Documents
This section lists documents in which the staff of the U.S. Nuclear Regulatory Commission (NRC) sent documents to PSEG Power, LLC, and PSEG Nuclear, LLC (PSEG) in conjunction with PSEG Power, LLC, and PSEG Nuclear, LLC (PSEG) application to obtain an early site permit (ESP) for the PSEG site.
Date | Description |
---|---|
05/31/12 | Change in Schedule of PSEG Site Early Site Permit Application Review |
12/23/11 | Change in Schedule of PSEG Site Early Site Permit Application Review |
11/01/11 | Scoping Summary Report - Environmental Impact Statement Scoping Process |
11/29/10 | Summary of the Public Scoping Meetings Conducted for the Environmental Review Process for the PSEG Site Early Site Permit Application |
11/29/10 | Letter to PSEG - PSEG Site Early Site Permit Application Review Schedule |
11/08/10 | Notice Of Hearing, Opportunity to Petition for Leave to Intervene, and Associated Order: Letter to PSEG, and Federal Register Notice (Published in the Federal Register on 11/08/10) |
10/08/10 | Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping: Letter to PSEG, and Federal Register Notice (Published in the Federal Register on 10/15/10) |
08/23/10 | Letter to PSEG - PSEG Early Site Permit Application Online Reference Portal |
08/04/10 | Acceptance Review for an Early Site Permit Application for PSEG Site, and Federal Register Notice of Acceptance for Docketing (Published in the Federal Register on 8/13/10) |
06/14/10 | Acknowledgment of Receipt of the Early Site Permit Application for PSEG Site and Associated Federal Register Notice (Published in the Federal Register on 6/18/10) |
Requests for Additional Information
For all safety-related RAIs and the applicant's related responses eRAI Safety Report. Note that some RAIs and related responses may not be publicly available because they contain sensitive information.
Contacts
Contacts for the PSEG Site ESP Application | |
---|---|
Safety Project Manager | Prosanta Chowdhury |
Environmental Project Manager | Allen Fetter |
Contact a Public Affairs Officer |