183.2KW Sedimentation Basin demolition
Inside bay 1 of the 183.2KW sedimentation basin
183KW chlorine vault slab demolition
183.2KW Sedimentation Basin debris removal
183KW chemical storage silo demolition
183KW Sedimentation Basin Complex before demolition
Entering the 183.2KW Sedimentation Basin
Size reducing tools used in the K West Basin
183.1KW Headhouse demolition begins (Feb 2010)
183.1KW Headhouse after demolition (March 2010)
183.3KW Filter Basin demolition (April 2010)
183.6KW Lime Feeder Building during demoliion (April 2010)
183.3KW Filter Basin demolition (June 2010)
183.7KW Pipe Tunnel demolition
Remediation in the 100K Area (June 2010)
183KW Sedimentation Basin Demolition (April 2010)
Removing 183.1KW Headhouse substructures
Demolition of the 183KW Sedimentation Basin(December 2009)
Aerial of 183KW Sedimentation Basin (January 2010)
Close-up of 183KW Sedimentation Basin demolition (January 2010)
Demolition of the 183K West Filter Basin (April 2010)
Demoliton of the 183K West Sedimentation Basin (May 2010)
Remediation beneath the 183K West Headhouse (June 2010)
Demolition of the 183K West Sand Filter (June 2010)
Demolition of the 183K West Filter Basin (July 2010)
Demolition of the 183K West Sedimentation Basin (August 2010)
Aerial of 183K West Sedimentation Basin (September 2010)
Completing demolition of the 183KW Sedimentation Basin (October 2010)
Water truck at D&D of 183KW Sedimentation Basin (October 2010)
Last of the 183KW Sedimentation Basin D&D (October 2010)
Debris from the 183K West Sedimentation Basin (October 2010)
183KW Sedimentation Basin Complex after demolition (October 2010)
183.7KW Pipe Tunnel during demolition
Removing soil beneath 183KW Headhouse
Clearwell demolition begins
Demolition of the K West Clearwell
KW River Pumphouse Demolition
110-KW Gas Recirculation Building demolition
KW River Pumphouse demo continues
Crating owls from river pumphouse
181-KW River Pumphouse demolition
181KW after demolition
181KW River Pump House demolition
Workers process knockout pot sludge
Workers begin processing knockout pot sludge
Knockout pot processing area
Underwater sludge processing
Knockout pot sludge processing
Team celebrates sludge shipment
MCO shipment paperwork
A random sampling of photo tags throughout the site.