Environmental Reviews
TVA conducts environmental reviews in accordance with the National Environmental Policy Act (NEPA), which requires federal agencies to consider the effects of their proposals on the human environment before decisions are made. Active projects are listed below. Information related to past projects that have been completed, deferred, or canceled may be found in the TVA NEPA document archive.
For TVA NEPA project inquiries that are not addressed at this site, please call 800-882-5263 between 8:00 a.m. and 6:00 p.m. Eastern time Monday-Friday or e-mail questions to TVA's Environmental Information Center.
Open for Public Comment
TVA 2012 Climate Change Adaptation Plan
Economic Development
Land Use and Permitting
- City of Lakesite Recreation Easement and Water Use Facilities
- The Cliffs at High Carolina
- Huntsville Sewer Line
- Kentucky Lock Addition - Modifications to Previously Approved Disposal Sites
- Kingston Fossil Plant Ash Recovery – Proposed Recreation Areas
- Mallard Fox Creek Industrial Park Land Disposal (Tract No. XWR-633)
- Meadowview Aquatic Center
- Muscle Shoals Reservation Redevelopment
- Natural Resource Plan
- Occidental Chemical Corporation, Barge Terminal Modification and Outfall
- Permanent Moorage of the Delta Queen Steamboat in Chattanooga
- Pointe Marina Proposed Commercial Marina Development
- Proposed Stream Modifications for Retail Development
- Tennessee National Marina
- TVA-City of Knoxville Downtown Parking Garage
- Watts Bar Marina and Resort Deconstruction
- Wilson Dam Bascule Bridge Replacement
Power Generation
- Ashley Wind Energy Project
- Competitive Power Ventures (CPV) Cimarron Energy Project
- Gallatin Fossil Plant – Installation of Air Pollution Control Equipment and Associated Facilities
- Installation of Landfill Gas Generators at West Camden Sanitary Landfill
- Integrated Resource Plan
- Kingston Fossil Plant Structure Razing
- Mechanical Dewatering Facility at Bull Run Fossil Plant
- Potential Use of Mixed Oxide Fuel in TVA Reactors Supplemental Environmental Impact Statement
- Power Purchase Agreement for Chattanooga Airport Solar Array
- Power Purchase Agreement for Renewable Energy from Biogas - Installation of Generating Capacity at Memphis Wastewater Treatment Plant
- Power Purchase Agreement for West Tennessee Solar Farm
- Purchase of Power Generated at Prairie Bluff Sanitary Landfill
- Sequoyah Nuclear Plant Units 1 and 2 License Renewals
- Single Nuclear Unit at the Bellefonte Plant Site
River System Operations
- Blue Ridge Dam Rehabilitation Project
- Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams
Transmission
- Burlison 161-Kilovolt Transmission Line
- Burkesville, KY 161-Kilovolt Transmission Line
- Helicon, Alabama Power Supply Improvement Project
- Hillsboro 161-KV Transmission Line
- Putnam-Cumberland, Tennessee Improve Power Supply Project
- Starkville and Columbus, Mississippi - Power Supply Improvement
- Supplement to the Wacker Chemie Poly 11 Request for TVA Land Use and Section 26a Approval Environmental Assessment
- Volunteer-East Knox Bulk Transmission Project