Top 10 FAQs

Is my project eligible for a DOE loan guarantee?

The Department considers project applications that have been submitted in compliance with an open solicitation.  To decide if a project is eligible for a DOE loan guarantee, please review the Loan Guarantee Program's guiding documents, including Title XVII of the 2005 Energy Policy Act and the Final Rule. Further eligibility requirements can be found in each specific solicitation, as well as any additional guidance posted on the Loan Programs Office website from time to time.

How do I apply for a loan guarantee?

All open technology-specific solicitations may be found here: Solicitations. Please review the requirements, deadlines and closing dates for each solicitation before applying. While all applicants for loan guarantees are encouraged to apply using the online application portal, applicants to any previously issued open solicitations can still apply for loan guarantees via Fed Connect or Express Mail. Applicants who have already submitted Part I applications and are invited to submit Part II applications should continue to do so by sending their application via Fed Connect or Express Mail.

 




Are there any items that require a long lead time to prepare? If so, what are they?

There are several detailed reports that must be submitted with Part II of each application. The applicant should prepare an environmental report for the project’s site and obtain an independent engineering report for the proposed project. These activities may take up to 12 weeks.

What is credit subsidy cost?

Credit subsidy cost is a reserve established by the U.S. government to cover the risk of estimated shortfalls in loan repayments. It was established by the Federal Credit Reform Act of 1990 (“FCRA”) and represents the net present value of the estimated long-term cost to the U.S. government of the loan guarantee. Credit subsidy cost is primarily influenced by two key variables:

  • Probability of default; and
  • The “recovery” after default.

These variables are used to “risk adjust” the borrower’s principal and interest payments to the government, and provide an estimate of payment shortfalls.

Section 1702(b) of Title XVII provides that DOE must receive either an appropriation for the credit subsidy cost of a loan guarantee or, in lieu of an appropriation, a cash payment of such cost directly from the applicant.

Prior to the submission of an application (or any part of an application) under Title XVII of the Energy Policy Act of 2005 and the Final Rule, are there any restrictions on communications between Loan Programs Office personnel and potential applicants and their advisors?

Loan Programs Office personnel may have discussions and meetings with potential applicants and their representatives and advisors, but there are restrictions on the content of the discussions. Loan Programs Office personnel can provide guidance that is publicly available to all other potential applicants and their representatives and advisors. However, except as noted below, personnel cannot discuss specific projects prior to the submission of an application. Any discussion of a potential application must be limited to logistical guidance and publicly available application requirements. The NEPA team of the Loan Programs Office can discuss specific projects only with respect to NEPA issues.

Is there an application form that must be used to apply for an ATVMLP loan?

No, applicants are required to submit the information as set forth in §611.101 of the Interim Final Rule.

How will the ATVMLP evaluation process work?

The evaluation process will include four steps. In the first step, an application will be reviewed to see if it is substantially complete. If it is not DOE will notify the applicant what additional information it needs to provide DOE. Once an application is substantially complete, in the second step, the applicant and the project will be evaluated to determine if they are eligible for the ATVMIP. If they are not eligible, the application review process will end. If both the applicant and the proposed project are eligible, in the third step, the proposed project will be evaluated, potential terms and conditions of a loan will be developed and a decision will be made whether to make a loan. The fourth and final step is the negotiation and, if the negotiation is successful, the closing of the loan. The entire process will involve dialogue and exchange of information between the applicant and DOE in each step.

To what extent can qualifying components and engineering integration be used in vehicles that are manufactured outside the United States?

The project for which funding is sought must be performed in the United States. Moreover, the advanced technology vehicle to which that project is related must be sold in the United States.

Will borrowers that receive a loan guarantee under Title XVII be required to comply with the Davis-Bacon Act?

 

Yes, all projects involving construction work financed in whole or in part by a loan guaranteed under Title XVII are required to comply with the Davis Bacon Act. Specifically, Section 1702 of Title XVII was amended by Section 310 of the Energy and Water Development and Related Agencies Appropriations Act, 2010, P.L. No. 111-85, to add at the end the following new subsection (k):”WAGE RATE REQUIREMENTS.-All laborers and mechanics employed by contractors and subcontractors in the performance of construction work financed in whole or in part by a loan guaranteed under this title shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code. With respect to the labor standards in this subsection, the Secretary of Labor shall have the authority and functions set forth in Reorganization Plan Numbered 14 of 1950 (64 Stat. 1257; 5 U.S.C. app.) and section 3145 of title 40, United States Code.”

 

If my proposed project requires less than a $25 million loan, will it be cost-effective to participate in DOE’s Loan Guarantee Program given the amount of the fees?

The Department of Energy has offered conditional commitments for loan guarantees on projects less than $25 million. However, these kinds of projects are time and capital-intensive.  Currently there are no special provisions for small business participation in the loan programs.

LGP (1703 and 1705) FAQ

Search the FAQs

Use the form below to search the FAQs

Search for

Back to Top

ATVM FAQ

Search the FAQs

Use the form below to search the FAQs

Search for

Back to Top

NEPA FAQ

Search the FAQs

Use the form below to search the FAQs

Search for

What is NEPA?

NEPA is the National Environmental Policy Act, which requires Federal agencies to assess the environmental impact of all major Federal actions significantly affecting the quality of the human environment. The White House Council on Environmental Quality (CEQ) has promulgated NEPA implementing regulations1 that are applicable to all agencies. DOE’s NEPA order2 and regulations3 and DOE’s NEPA Compliance Program[K1] contain implementing procedures that specifically address their programs. The NEPA Flow Chart nicely displays the steps in the NEPA process.

There are three types of review under NEPA: categorical exclusions (CX), environmental assessments (EA), and environmental impact statements (EIS). DOE’s NEPA implementing regulations specify actions that normally require an EIS or an EA, and actions that can be categorically excluded. DOE’s categories of actions identifying CXs, EAs, and EISs are listed in Appendices A, B, C, and D to Subpart D ofDOE’s NEPA rule. An EIS is a detailed analysis of actions presumed to have significant environmental impacts, and is followed by a Record of Decision (ROD). An EA is a concise public document that briefly provides sufficient evidence and analysis for determining whether to make a Finding of No Significant Impact (FONSI) or prepare an EIS. CX refers to a category of actions which do not individually or cumulatively have a significant effect on the human environment and do not require an EA or EIS. Examples of EAs and EISs can be found on the DOE Office of NEPA Policy and Compliance website athttp://www.gc.energy.gov/NEPA/DOE_NEPA_documents.htm.

1 40 CFR Parts 1500-1508 [http://ceq.hss.doe.gov/Nepa/regs/ceq/toc_ceq.htm]

2 DOE Order 451.1B

3 10 CFR Part 1021

How does NEPA apply to DOE loan guarantees?

DOE’s loan guarantees are considered major Federal actions and are subject to NEPA review. NEPA compliance is integrated into DOE’s Loan Guarantee Program Office (LGPO) decision-making procedures to ensure that environmental impacts are considered throughout the loan guarantee process. The NEPA review must be completed before a loan guarantee can be issued.

What is the Applicant role in the NEPA review process?

The Applicant is required to complete an Environmental Report as part of the loan application. This should be a comprehensive description and environmental effects analysis of their proposed project, the preparation of which may require the assistance of an environmental contractor, particularly for EIS-level projects. The information submitted should be based on guidance and requirements identified by the LGPO. Once a project sponsor has decided to submit an application, they are encouraged to contact the NEPA Division of the Loan Guarantee Program for preliminary guidance on what to include in their application. An example of such guidance is Attachment B to the 2008 solicitations for loan guarantee applications.

Upon commencement of due diligence and negotiations, the NEPA division of the LGPO will work with the applicant and contractor in an iterative process to ensure smooth and timely completion of the NEPA process. DOE in many cases, particularly for EISs, plans to develop the NEPA document using a contractor that will be paid by the Applicant under a “third party” arrangement as provided in CEQ regulations at 40 CFR 1506.5(c).

What does the NEPA review entail and how long does it take?

NEPA review begins once a project has been approved to begin due diligence, DOE has completed its formal technical and financial review and the applicant is invited to negotiate with the government. LGPO makes a determination of the level of NEPA review required then begins a thorough review of all resource areas and their potential environmental impacts, coordinates public involvement and ensures legal and regulatory requirements are met as they develop the NEPA document. LGPO will also work in an ongoing process with the Applicant or their contractor to obtain any additional environmental information needed for the project.

The average timeline for an environmental assessment is generally six to nine months, and for an environmental impact statement around 18-24 months. Since the EIS process involves significant environmental impacts it requires a far more rigorous and expanded review and public involvement process than for an EA. This includes the solicitation of public review and comment on the draft EIS, and holding related public meetings and hearings.

What other laws affect the NEPA review process?

During the NEPA review process a number of other environmental laws require coordination and compliance. These include Section 107 of the Endangered Species Act, Section 404 of the Clean Water Act, Section 106 of the National Historic Preservation Act, in addition to various provisions of the Clean Air Act, several executive orders and other statutes. Issues such as environmental justice and socioeconomics, farmland protection, and Tribal concerns must also be taken into account. For many of these concerns it is imperative that collaboration take place as early as possible, for instance when notifying Tribes, State Historic Preservation Officers, or Fish and Wildlife Service of the proposed project. Since there are so many issues and requirements to consider during the NEPA review process, Applicants are encouraged to engage the LGPO’s NEPA team early on to discuss the project and related requirements so that a smooth process takes place.

What happens if another Federal agency has prepared, or is in the process of preparing a NEPA document for an Applicant’s project?

If another Federal agency is already preparing an EA or EIS, and if the schedule permits, DOE may seek to become a cooperating agency on the EIS or EA. Under this arrangement DOE works with the other Federal agency in preparing the NEPA document, resulting in a more efficient and timely review. Similarly, when DOE initiates a NEPA review for a proposed loan DOE will check to see if another Federal agency also has jurisdiction by law or special expertise concerning the project or it effects, and will consider inviting the agency to be a cooperating agency in the preparation of the NEPA document.

How are state environmental reviews considered in DOE’s NEPA process for loan projects?

A number of states also require environmental reviews similar to NEPA. In some cases, the state review will precede the DOE NEPA process, and DOE will be able to use the results of the state process to develop information for the EA or EIS. In other cases, DOE will work with the applicant and the state to prepare a single document that meets both state and Federal requirements. However, NEPA regulations do not allow DOE to adopt a non-Federal environmental review document.

What public review is required for EAs and EISs?

DOE’s regulations require that EAs be reviewed by host states and Tribes for a minimum of 14 days. In some cases DOE may also want to provide for public review and comment for EAs, and, in all cases, will make EAs available to anyone who requests. Draft EAs will also be posted on the DOE Loan Guarantee Program Office website. For EISs, DOE will always have a scoping meeting prior to the draft EIS (DEIS) and at least one public hearing after the DEIS is issued. DEISs must have a public comment period for a minimum of 45 days. DEIS are also reviewed by the U.S. Environmental Protection Agency (EPA) and other Federal agencies, and host state and Tribal governments. EPA also reviews final EISs (FEISs).

When is an EIS required?

An EIS is required for Federal actions significantly affecting the quality of the human environment. In reaching a decision on the need for an EIS DOE first determines if the project is a type that is included in DOE’s classes of actions that normally require EISs as set out at Appendix D to Subpart D of 10 CFR Part 1021. If not, DOE may then prepare an EA to determine if a Finding of No Significant Impact can be made for the proposed action or if an EIS is required. Or DOE may decide that an EIS is needed without going through the EA process. In deciding on the need for an EIS, DOE considers the context and intensity of any potential impacts, including whether there are likely to be any significant environmental impacts that cannot be mitigated. Factors DOE may consider include the following:

  • The project would significantly affect public health or safety;
  • There are unique characteristics in the geographic area of the project, such as park lands, historic or cultural resources, prime farmlands, wetlands, wild and scenic rivers, or ecologically critical areas that would be affected by the project;
  • There is any controversy over the degree of environmental effects of the project;
  • The project presents unique or unknown environmental risks;
  • The project sets a precedent for future actions that are likely to have significant environmental impacts;
  • The action is related to other actions which, taken together, could have significant cumulative impacts;
  • The project adversely affects any sites, structures, etc., listed in or eligible for listing in the National Register of Historic Places;
  • The project adversely affects an endangered or threatened species or its habitat that have been determined to be critical under the Endangered Species Act;
  • The project threatens a violation of Federal, state, or local laws or requirements imposed for the protection of the environment;
  • The project would have a disproportionate and adverse impact on minority or low-income populations.

Are there companies and consultants that can prepare Environmental Reports, EAs and EISs?

There are a number of companies and consultants that specialize in NEPA work. Information about companies and consultants can often be obtained from professional organizations, architectural and engineering firms, and law firms. Information about companies and consultants that have prepared environmental documents for Federal agencies is generally listed in Federal EISs or EAs, many of which are available on the Internet. Although DOE cannot recommend consultants or companies for NEPA work, in early 2009 DOE pre-qualified several contracto teams for NEPA support services to DOE Program and Field Offices. The names of these contractor teams are available on DOE’s Office of NEPA Policy and Compliance website at http://energy.gov/sites/prod/files/nepapub/nepa_documents/RedDont/NEPA-ContractorContacts-2011.pdf.

How will a project be affected if an applicant begins work on the project site prior to the completion of NEPA review?

The National Environmental Policy Act (NEPA) requires Federal agencies to consider the potential environmental impacts of their proposed actions. NEPA review must be completed before a loan guarantee can be issued.The NEPA review process begins after the project has been accepted into the due diligence phase. The applicant should consult with DOE before doing any work on the project site (beyond preliminary design activities) so that the NEPA review and issuance of the loan guarantee is not put at risk. This is because such work might cause an adverse environmental impact or limit the choice of reasonable alternatives, which can put at risk the NEPA review and thus the issuance of the loan guarantee. While DOE cannot control what an applicant does with its own funds, the fact that an applicant has started work does not create any obligation on the part of DOE to issue a loan guarantee.