Thu, 14 Feb 2013 11:57:55 -0600 (CST)
Shutter Permit Enabled @ 11:54
Thu, 14 Feb 2013 08:40:14 -0600 (CST) Beam loss
Stored beam was lost due to a backup UPS power supply failure. We have scheduled the next fill for 12:00 Wed, 13 Feb 2013 10:15:00 -0600 (CST) Top-Up re-enabled
SR orbit controllaw issues have been resolved. Top-Up resumed at 10:12. Wed, 13 Feb 2013 09:43:41 -0600 (CST) Top-Up aborted
Top-Up was aborted at 09:42. To faciltate repairs to SR orbit control. Wed, 13 Feb 2013 09:39:06 -0600 (CST) Storage Orbit Controllaw Issues
Due to an IOC issue, Storage Orbit Controllaw is suspended. Invesigation is underway. Mon, 11 Feb 2013 18:52:03 -0600 (CST) Stored beam lost at 17:56 In-Reply-To:
Due to a PSS trip at 23-ID, stored beam was lost at 17:56. Shutter permit was enabled at 18:41. Top-up is ongoing. Sat, 9 Feb 2013 15:27:18 -0600 (CST) 02/09/13 Stored beam, poor bunch purity, and intentional beam dump In-Reply-To:
On Saturday 02/09/13 at 11:24 stored beam was lost. At 12:04 shutter permit was enabled. Operations discovered poor bunch purity. At 12:35 stored beam was intentionally dumped. At 12:58 shutter permit was enabled. Bunch Purity is good. Thank You, Steven LaBuda Sat, 9 Feb 2013 00:38:20 -0600 (CST) Top-up Aborted In-Reply-To:
Due to an injector problem, Top-up was aborted from 00:24-00:31, 09 FEB 13. SR current decayed to approximately 100mA and the first top-up injection came at 00:33. All systems are running normally at this time. MCR Operations ASD-AOP Mon, 4 Feb 2013 08:00:12 -0600 (CST) Top-Up resumed
Top-Up was re-enabled at 07:59. Mon, 4 Feb 2013 07:35:27 -0600 (CST) Top-Up aborted
Top-Up was aborted at 07:33hrs due to a Booster RF issue. Fri, 1 Feb 2013 14:31:15 -0600 (CST) Estimated time for next fill is 15:30.
The repair and reconfiguration of the gate valve controller is expected to take ~60 minutes. The estimated time for the next fill is 15:30. Fri, 1 Feb 2013 12:37:58 -0600 (CST) Stored Beam Lost at 12:18
Stored beam was lost at 12:18. Operations is investigating. Fri, 1 Feb 2013 10:45:39 -0600 (CST) top up aborted and restarted
Top-Up was aborted on 2/1/13 at 10:38. IOCSRTUNE was booted by Operations. Top-Up was restarted on 2/1/13 at 10:42. Thank You, Steven LaBuda
Thu, 14 Feb 2013 08:40:14 -0600 (CST) Beam loss
Stored beam was lost due to a backup UPS power supply failure. We have scheduled the next fill for 12:00 Wed, 13 Feb 2013 10:15:00 -0600 (CST) Top-Up re-enabled
SR orbit controllaw issues have been resolved. Top-Up resumed at 10:12. Wed, 13 Feb 2013 09:43:41 -0600 (CST) Top-Up aborted
Top-Up was aborted at 09:42. To faciltate repairs to SR orbit control. Wed, 13 Feb 2013 09:39:06 -0600 (CST) Storage Orbit Controllaw Issues
Due to an IOC issue, Storage Orbit Controllaw is suspended. Invesigation is underway. Mon, 11 Feb 2013 18:52:03 -0600 (CST) Stored beam lost at 17:56 In-Reply-To:
Due to a PSS trip at 23-ID, stored beam was lost at 17:56. Shutter permit was enabled at 18:41. Top-up is ongoing. Sat, 9 Feb 2013 15:27:18 -0600 (CST) 02/09/13 Stored beam, poor bunch purity, and intentional beam dump In-Reply-To:
On Saturday 02/09/13 at 11:24 stored beam was lost. At 12:04 shutter permit was enabled. Operations discovered poor bunch purity. At 12:35 stored beam was intentionally dumped. At 12:58 shutter permit was enabled. Bunch Purity is good. Thank You, Steven LaBuda Sat, 9 Feb 2013 00:38:20 -0600 (CST) Top-up Aborted In-Reply-To:
Due to an injector problem, Top-up was aborted from 00:24-00:31, 09 FEB 13. SR current decayed to approximately 100mA and the first top-up injection came at 00:33. All systems are running normally at this time. MCR Operations ASD-AOP Mon, 4 Feb 2013 08:00:12 -0600 (CST) Top-Up resumed
Top-Up was re-enabled at 07:59. Mon, 4 Feb 2013 07:35:27 -0600 (CST) Top-Up aborted
Top-Up was aborted at 07:33hrs due to a Booster RF issue. Fri, 1 Feb 2013 14:31:15 -0600 (CST) Estimated time for next fill is 15:30.
The repair and reconfiguration of the gate valve controller is expected to take ~60 minutes. The estimated time for the next fill is 15:30. Fri, 1 Feb 2013 12:37:58 -0600 (CST) Stored Beam Lost at 12:18
Stored beam was lost at 12:18. Operations is investigating. Fri, 1 Feb 2013 10:45:39 -0600 (CST) top up aborted and restarted
Top-Up was aborted on 2/1/13 at 10:38. IOCSRTUNE was booted by Operations. Top-Up was restarted on 2/1/13 at 10:42. Thank You, Steven LaBuda