Listing of Statistics for Run1-2013 (Created Mon Feb 25 00:05:21 CST 2013)
User periods in this interval
01/29/2013 08:00 To 02/05/2013 08:00 168.00 Hours, Delivered Beam: 165.12 Hours, 1 Fault(s),165.12 MTBF, 98.29% of Sched. Time 02/06/2013 08:00 To 02/12/2013 08:00 144.00 Hours, Delivered Beam: 141.69 Hours, 2 Fault(s), 70.84 MTBF, 98.39% of Sched. Time 02/13/2013 08:00 To 02/19/2013 08:00 144.00 Hours, Delivered Beam: 140.16 Hours, 1 Fault(s),140.16 MTBF, 97.33% of Sched. Time 02/20/2013 08:00 To 02/25/2013 00:01 112.02 Hours, Delivered Beam: 112.01 Hours, 0 Fault(s),112.01 MTBF, 99.99% of Sched. Time
Total Amount of User Time in this interval 568.00 Hours
Delivered Beam 558.98 Hours
Percentage of Scheduled Time (*) 98.41 %
Mean Time Between Faults (MTBF) 139.74 Hours
Downtime During Period 9.02 Hours
Total integrated Current During This Period 57.01 A-hr
Mean Fill Duration in Period 111.80 Hours
Faults per Day of Delivered Beam 0.17
Total Number of Faults 4
Valid fills Beginning in this Time Interval      
Fill # Start  End Duration
(min: 1.0)
Reason for Fill Termination Length of Downtime Downtime is associated with the end of a fill. The first fill of a period will have any downtime before the fill on the line above.

  0.00
# 1 01/29 08:00 To 02/01 12:18 76.30    SR VacValve closed[Ctl] 2.87 Investigation, replaced controller
# 2 02/01 15:10 To 02/05 07:59 88.83    Int Dump: End of Period 0.00

  0.00
# 3 02/06 08:00 To 02/09 11:24 75.41    IOCRF3HVPS reboot [?] 1.56 Dumped for bad Bunch Purity[?]0.5hr [AOP]1.06hr
# 5 02/09 12:58 To 02/11 17:56 52.98    23ID PSS trip [SI] 0.75 Investigation, reset systems, refilled
# 6 02/11 18:41 To 02/12 07:59 13.31    Int Dump: End of Period 0.00

  0.01
# 7 02/13 08:00 To 02/14 08:04 24.07    UPS bypass failed[SO] 3.83 Bypass failed UPS,searched,reset/condition systems
# 8 02/14 11:54 To 02/19 07:59 116.09    Int Dump: End of Period 0.00

  0.00
# 9 02/20 08:00 To 02/25 00:00 112.01    Fill Ongoing 0.00
Top-Up Mode Statistics
Target Current Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes Total
Current in Range during Scheduled Topup Time 97.49 %
Current in Range during Delivered Beam Time 99.08 %
Injector Availability 99.05 %
Period Beginning 01/29/2013 08:00
Current in Range 99.11 %
Injector Availability 98.98 %
Out of Range at: 01/29/2013 14:26:40 to 01/29/2013 14:37:12 : 10.53 minutes
Injector downtime:01/29/2013 14:21:44 to 01/29/2013 14:34:56 : 13.20 minutes
Out of Range at: 01/31/2013 14:54:08 to 01/31/2013 15:26:08 : 32.00 minutes
Injector downtime:01/31/2013 14:49:12 to 01/31/2013 15:26:04 : 36.87 minutes
Out of Range at: 02/04/2013 07:39:20 to 02/04/2013 08:25:12 : 45.87 minutes
Injector downtime:02/04/2013 07:34:24 to 02/04/2013 08:25:08 : 50.73 minutes
Period Beginning 02/06/2013 08:00
Current in Range 99.97 %
Injector Availability 99.91 %
Out of Range at: 02/09/2013 00:33:04 to 02/09/2013 00:35:44 : 2.67 minutes
Injector downtime:02/09/2013 00:25:04 to 02/09/2013 00:33:04 : ~ 8.00 minutes
Period Beginning 02/13/2013 08:00
Current in Range 99.07 %
Injector Availability 99.03 %
Out of Range at: 02/13/2013 09:53:36 to 02/13/2013 11:04:24 : 70.80 minutes
Injector downtime:02/13/2013 09:48:40 to 02/13/2013 11:02:08 : 73.47 minutes
Out of Range at: 02/17/2013 05:40:48 to 02/17/2013 05:48:08 : 7.33 minutes
Injector downtime:02/17/2013 05:32:48 to 02/17/2013 05:40:48 : ~ 8.00 minutes
Period Beginning 02/20/2013 08:00
Current in Range 97.91 %
Injector Availability 98.08 %
Out of Range at: 02/20/2013 14:03:12 to 02/20/2013 15:21:44 : 78.53 minutes
Injector downtime:02/20/2013 13:58:16 to 02/20/2013 15:19:28 : 81.20 minutes
Out of Range at: 02/23/2013 17:19:04 to 02/23/2013 18:20:40 : 61.60 minutes
Injector downtime:02/23/2013 17:14:36 to 02/23/2013 17:29:44 : 15.13 minutes
Injector downtime:02/23/2013 17:48:08 to 02/23/2013 18:20:36 : 32.47 minutes
The information on this page is automatically generated and may contain errors. An official operations statistics page will be posted at the end of each user period.