Home > Site Help > Search Results
San Onofre Nuclear Generating Station, Unit 2 - Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation.
Accession Number: ML122850320
Date Released: Friday, October 12, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12285A263 - San Onofre Nuclear Generating Station, Unit 2 - Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation. (134 page(s), 10/3/2012)
- ML12285A264 - Attachment 3 - AREVA Document 51-9180143-001 - SONGS Unit 3 February 2012 Leaker Outage Steam Generator Condition Monitoring Report. (100 page(s), 10/1/2012)
- ML12285A265 - Attachment 4 - MHI Document L5-04GA564 - Tube Wear of Unit-3 RSG, Technical Evaluation Report. (142 page(s), 10/1/2012)
- ML12285A266 - Attachment 4: Appendix-2 Attachment-1, Tube-to-TSP wear depth diagram for Unit-2/3. (226 page(s), 10/1/2012)
- ML12285A267 - Attachment 4: SG Tube Wear Analysis for Unit-2/3. (239 page(s), 10/1/2012)
- ML12285A268 - Attachment 6 - Appendix B: SONGS U2C17 - Steam Generator Operational Assessment for Tube-to-Tube Wear. (105 page(s), 10/2/2012)
- ML12285A269 - Attachment 6: Appendix A: Estimates of FEI-Induced TTW Rates. (209 page(s), 10/2/2012)