December 1998 | ||
---|---|---|
12/30/1998 | III-98-61 | NRC to Hold Public Meeting on Proposal to Terminate License of Shelwell Services, Inc., Hebron, Ohio |
12/30/1998 | 98-234 | NRC Licensing Board Denies Petition to Intervene in Oconee License Renewal |
12/29/1998 | 98-233 | Note to Editors: ACRS Meeting Scheduled for January 27-29 |
12/29/1998 | 98-232 | Note to Editors: Meeting Date Changed |
12/29/1998 | 98-231 | NRC Streamlines Organizational Structure |
12/28/1998 | 98-230 | NRC Revises Regulations on Availability of Information for High-Level Radioactive Waste Repository Licensing Proceeding |
12/24/1998 | I-98-134 | NRC Issues Order Suspending License of Connecticut Gauge User |
12/24/1998 | I-98-133 | NRC Assigns New Resident Inspector at FitzPatrick |
12/23/1998 | 98-229 | NRC Prepares to Review Application for Tritium Production |
12/23/1998 | 98-228 | Commission Affirms Atomic Safety & Licensing Board Decision Denying Petition to Intervene in Calvert Cliffs License Renewal |
12/23/1998 | 98-227 | Note to Editors: ACRS Meeting on January 21 |
12/22/1998 | 98-226 | Note to Editors: Reports Received from ACRS |
12/22/1998 | IV-98-45 | NRC Proposes to Fine Arizona Public Service Company $55,000 for Violations at Palo Verde Nuclear Plant |
12/22/1998 | I-98-132 | NRC, New Jersey Medical School to Discuss Apparent Violations |
12/21/1998 | II-98-67 | NRC Staff Sets Enforcement Conference with FP&L to Discuss St. Lucie Fire Protection Compliance |
12/21/1998 | 98-225 | NRC Offers Opportunity for Hearing, Written Comments on Proposed Three Mile Island Unit 1 License Transfer |
12/21/1998 | 98-224 | NRC Increases Base Civil Penalties for Some Fuel Cycle Facilities, Amends Enforcement Policy for Gaseous Diffusion Plants |
12/18/1998 | 98-223 | NRC Issues Report on Waste Burial Charges |
12/17/1998 | 98-222 | NRC Advisory Committee on Reactor Safeguards Subcommittees to Hold Joint Meeting January 26 |
12/16/1998 | 98-221 | Note to Editors: ACRS Meeting Scheduled on January 20-21 |
12/15/1998 | I-98-131 | Note to Editors: Meeting on Vermont Yankee on December 17 |
12/15/1998 | I-98-130 | NRC Postpones Prehearing Conference on Yankee Rowe |
12/14/1998 | I-98-129 | NRC, Maine Yankee to Discuss Plans for Spent Fuel Storage |
12/14/1998 | IV-98-44 | NRC Chairman Jackson to Hold News Briefing in Moab Following Visit to Atlas Uranium Mill Site |
12/11/1998 | 98-220 | NRC Chairman Announces Acceptance of Post of President of Rensselaer Polytechnic Institute |
12/10/1998 | III-98-60 | NRC, Sinai Hospital to Discuss Apparent Violations |
12/09/1998 | III-98-59 | NRC Dispatches Augmented Inspection Team to Review Fire at Portsmouth Gaseous Diffusion Plant |
12/09/1998 | I-98-128 | NRC, Utility to Discuss Performance of Indian Point 2 Plant |
12/09/1998 | I-98-127 | NRC Staff, Utility to Discuss Four Apparent Violations Involving Decommissioning Procedures at Haddam Neck |
12/09/1998 | I-98-126 | Note to Editors: NRC Meeting with Public on December 14 at Millstone Station |
12/09/1998 | III-98-58 | NRC Chairman's Visit, News Briefing at Quad Cities Plant Canceled |
12/08/1998 | III-98-57 | Date and Time Change for NRC Chairman Shirley Ann Jackson News Briefing at Quad Cities Plant |
12/08/1998 | II-98-66 | Time Change for NRC Commissioner's Press Conference at Sequoyah Nuclear Plant |
12/08/1998 | 98-219 | NRC Makes Available Staff Draft Year 2000 Contingency Plan |
12/08/1998 | 98-218 | Commission Terminates Proceedings in Seabrook License Amendment Case |
12/08/1998 | 98-217 | NRC Offers Opportunity for Hearing on Request to Amend B&W License |
12/07/1998 | 98-216 | Commercial Nuclear Power Plants Have Lowest Number of Severe Accident Precursors Since 1970 |
12/04/1998 | III-98-56 | NRC Chairman Shirley Ann Jackson to Hold News Briefing Following Visit to Quad Cities Nuclear Power Station |
12/03/1998 | IV-98-43 | Frank Bush Assigned Senior Resident Inspector for NRC at Wolf Creek |
12/02/1998 | 98-215 | NRC Withdraws Proposed Change on Reporting Requirements for Risk-Significant Reactor Systems |
12/01/1998 | 98-214 | NRC Proposes Changes to Regulations for Devices Containing Radioactive Material |
12/01/1998 | 98-213 | Note to Editors: NRC Has Received Four Reports from its Advisory Committee on Reactor Safeguards |
12/01/1998 | II-98-64 | Photo/Video Availability and Revised Media Availability Time for NRC Chairman's Visit to DOE Savannah River Plant |
November 1998 |
||
11/30/1998 | II-98-63 | NRC Names New Senior Resident Inspector at Turkey Point Nuclear Power Plant |
11/30/1998 | II-98-62 | NRC Chairman to Visit DOE Savannah River Plant |
11/25/1998 | III-98-55 | Nuclear Regulatory Commission to Meet Nov. 30 in Maryland on Status of Cook Nuclear Plant Repairs and Improvements |
11/25/1998 | I-98-125 | Utility to Brief NRC on Millstone 1 Decommissioning Plans |
11/25/1998 | 98-212 | Note to Editors: Advisory Committee on Reactor Safeguards Meeting Scheduled for December 16-17 |
11/24/1998 | 98-211 | New NRC Rule Sets Up Streamlined Process for Hearings in License Transfer Cases |
11/20/1998 | I-98-123 | Note to Editors: Beaver Valley Meeting on November 16, 1998 |
11/19/1998 | 98-210 | Note to Editors: ACRS Meeting 12/02/98 |
11/19/1998 | I-98-124 | Note to Editors: Millstone Meetings |
11/18/1998 | IV-98-42 | NRC Issues Inspection Report on Spent Fuel Loading at Arkansas Nuclear One |
11/18/1998 | IV-98-41 | NRC, Entergy to Discuss Apparent Violations at River Bend Nuclear Plant |
11/18/1998 | 98-209 | NRC Reopens Public Comment Period on Proposed Changes to Medical Policy Statement, Regulations, Guidance |
11/17/1998 | 98-208 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
11/13/1998 | 98-207 | Note to Editors: ACRS Meetings Scheduled |
11/12/1998 | 98-206 | NRC Makes Available Staff Recom1mendations on Cleanup Criteria for West Valley Site in New York |
11/10/1998 | 98-205 | Status of NRC OSRE Program |
11/09/1998 | 98-204 | NRC Prehearing Conference Scheduled for Yankee Nuclear Power Station |
11/06/1998 | 98-203 | Note to Editors: The NRC Advisory Committee on Nuclear Waste Meeting Scheduled December 15-17 |
11/05/1998 | 98-202 | Note to Editors: NRC Received Seven Reports from its Advisory Committee on Reactor Safeguards |
11/04/1998 | I-98-122 | Maine Yankee to Brief NRC on Decommissioning Work on Nov. 9 |
11/04/1998 | 98-201 | NRC Chairman Announces Senior Management Reassignments and Retirements |
11/04/1998 | 98-200 | NRC Statement on Nuclear Plant Operational Safeguards Program |
11/03/1998 | 98-199 | Commission to Meet with Stakeholders November 13 |
11/03/1998 | III-98-54 | NRC Names New Resident Inspector at Fermi Nuclear Power Plant |
11/03/1998 | I-98-121 | NRC Names New Senior Resident Inspector at Nine Mile Point Nuclear Plant |
11/02/1998 | I-98-120 | NRC Staff Authorizes Postponement of Core Shroud Inspection at Nine Mile Point 1 Nuclear Power Plant |
11/02/1998 | 98-198 | NRC Approves Security Arrangements for Shipping Spent Fuel from Limerick Reactor to California Facility |
October 1998 |
||
10/30/1998 | 98-197 | NRC Issues Certificate to General Atomics for Transportation Cask for Spent Nuclear Fuel |
10/30/1998 | 98-196 | NRC to Grant Two Exemptions to its Package Requirements to Facilitate Shipment of Trojan Reactor Vessel for Disposal |
10/30/1998 | 98-195 | Note to Editors: ACRS Meetings Scheduled |
10/29/1998 | 98-194 | Miraglia Named Finalist for Senior Executives Association Award |
10/28/1998 | I-98-119 | GPU to Brief NRC Staff on Oyster Creek Shutdown Planning |
10/27/1998 | I-98-118 | NRC Names New Senior Resident Inspector at FitzPatrick Nuclear Power Plant |
10/26/1998 | I-98-117 | Note to Editors: NRC Staff Meeting with Northeast Utilities |
10/26/1998 | 98-193 | NRC Plant Status Report to Change Format |
10/23/1998 | 98-192 | Commissioner Merrifield Takes Oath of Office; Dicus Swearing-In Set for Next Week |
10/22/1998 | 98-191 | NRC Status Report on Efforts to Head Off Computer Problems in Year 2000 |
10/22/1998 | 98-190 | Note to Editors: NRC Received Three Reports from its Advisory Committee on Reactor Safeguards |
10/21/1998 | 98-189 | NRC Schedules Meeting on Reporting Requirements for Nuclear Power Plants |
10/21/1998 | III-98-53 | James E. Dyer Named Regional Administrator for NRC Region III |
10/20/1998 | IV-98-39 | NRC Opts Not to Cite Envirocare over Special Nuclear Materials Issue |
10/20/1998 | I-98-116 | NRC to Discuss Apparent Violations with N.Y. Nuclear Gauge User |
10/19/1998 | 98-188 | Note to Editors: Meeting Date Changed |
10/15/1998 | III-98-52 | NRC Staff Proposes $500,000 Fine Against D.C. Cook Plant for Multiple Violations of NRC Safety Requirements |
10/15/1998 | II-98-61 | NRC Rates Turkey Point Nuclear Plant "Superior" in All Four Areas of Latest Assessment Report |
10/14/1998 | 98-187 | Note to Editors: NRC Has Received a Report from its Advisory Committee on Reactor Safeguards Following Meetings on September 2-4 and September 30-October 2 |
10/14/1998 | 98-186 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
10/14/1998 | I-98-115 | NRC Sends Inspectors to Permagrain to Look into Contamination Event |
10/13/1998 | II-98-60 | NRC Staff to Hold Informal Public Hearing on October 26 on Petition to Revoke Operating License for Browns Ferry Unit 1 |
10/13/1998 | 98-185 | NRC Order to STP Nuclear Operating Co. Confirms Fire Barrier Corrective Actions at South Texas Project, Units 1 and 2 |
10/13/1998 | 98-184 | Note to Editors: ACRS Meeting on October 29-30 |
10/09/1998 | 98-183 | NRC Approves Decommissioning Plan for B&W Facility in Parks Township, Pennsylvania |
10/09/1998 | IV-98-38 | Scott Schwind Assigned Resident Inspector for NRC at Comanche Peak |
10/08/1998 | 98-182 | Note to Editors: ACRS Meeting Scheduled for November 4 |
10/08/1998 | 98-181 | NRC Issues Notice of Violation But No Civil Penalty to Maine Yankee Atomic Power Company |
10/07/1998 | 98-180 | NRC Makes Available Staff Recommendations for Proposed Rule on Yucca Mountain Site |
10/06/1998 | I-98-114 | Note to Editors: NRC Postpones Meetings on Indian Point I Decommissioning |
10/06/1998 | 98-179 | NRC to Hold Public Meeting on Reporting Requirements for Nuclear Power Plants |
10/06/1998 | II-98-58 | NRC Seeks Input for Environmental Statement on Proposed Oconee Nuclear Power Plant License Renewal |
10/01/1998 | I-98-113 | NRC Regional Administrator to Hold Press Conference in Waterford |
10/01/1998 | 98-178 | NRC Advisory Committee on Nuclear Waste Reschedules October Meeting in Nevada |
10/01/1998 | 98-177 | NRC Proposes to Require Nuclear Power Plants to Assess Safety Impact Before Taking Equipment out of Service for Maintenance |
September 1998 |
||
09/30/1998 | I-98-112 | NRC Sets Public Meeting on Indian Point 1 Decommissioning |
09/29/1998 | III-98-51 | NRC Staff Denies License Renewal for Cleveland, Ohio, Firm |
09/29/1998 | I-98-111 | NRC, Companies to Discuss Decommissioning Work at Pa. Reactor |
09/29/1998 | II-98-57 | NRC Official to Hold News Conference in Atlanta on October 5 to Brief Area Reporters on Agency's Regulatory Functions |
09/29/1998 | 98-175 | NRC Recommends Extension, Modification of Price-Anderson Act to Continue Public Liability Coverage (Replaces One Issued on September 25, 1998) |
09/28/1998 | 98-176 | NRC Proposes Revisions to its Regulations for Making Changes to Licensed Facilities |
09/28/1998 | III-98-50 | NRC Inspection Team to Present Findings on Welding, Loading of Spent Fuel Cask at Point Beach Nuclear Plant |
09/27/1998 | IV-98-37 | NRC Monitors Preparation for Hurricane Georges |
09/25/1998 | I-98-110 | NRC, New Jersey Processing Company to Discuss Apparent Violations |
09/24/1998 | II-98-56 | NRC Names New Senior Resident Inspector at Browns Ferry Nuclear |
09/23/1998 | IV-98-36 | NRC California Field Office to Close September 30 |
09/22/1998 | 98-174 | Commission Grants Group More Time to File Contentions in Calvert Cliffs License Renewal Case |
09/22/1998 | 98-173 | Commission Orders Halt to Proceedings in Seabrook License Amendment Case |
09/21/1998 | 98-172 | NRC Auditing Nuclear Power Plant Year 2000 Readiness Programs |
09/18/1998 | 98-171 | Note to Editors: NRC Received Two Reports from ACRS Following September 2-4 Meeting |
09/18/1998 | 98-170 | Note to Editors: NRC Received Two Reports from ACNW Following Meetings on June 10-11 and July 20-22 |
09/17/1998 | I-98-107 | NRC Schedules Two Meetings Regarding Inspection of Core Shroud at Nine Mile Point 1 Nuclear Power Plant |
09/17/1998 | 98-169 | NRC Announces Retirement of Callan, Appointment of Travers as Executive Director for Operations |
09/16/1998 | 98-168 | NRC Suspends SALP Program Until Review of Performance Assessment Process Is Completed |
09/16/1998 | I-98-106 | Note to Editors: Upcoming Meetings on Millstone Station |
09/15/1998 | I-98-105 | NRC Rates Salem Nuclear Plant as "Superior" in Two Categories, "Good" in Two Others, in Latest Performance Review |
09/15/1998 | 98-167 | NRC Directs Expedited Action by Licensing Board Considering Hearing on Oconee License Renewal |
09/15/1998 | III-98-49 | NRC Staff Proposes $88,000 Fine for Inadequate Shutdown Procedures in Event of Fire at Quad Cities Nuclear Plant |
09/15/1998 | 98-166 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, September 30 - October 2 |
09/14/1998 | 98-165 | Nuclear Regulatory Commission Honors Employees |
09/14/1998 | 98-164 | NRC Proposes to Delete Reporting Requirement on Loading of Spent Nuclear Fuel Storage Installations |
09/11/1998 | 98-163 | Note to Editors: ACRS Meeting September 29, 1998 |
09/10/1998 | IV-98-34 | NRC to Meet with Palo Verde Officials to Discuss Apparent Violations at Nuclear Power Plant |
09/09/1998 | I-98-104 | Note to Editors: Vermont Yankee Meeting September 16, 1998 |
09/10/1998 | 98-162 | NRC Considers Changes to Regulations for Renewing or Amending USEC Certificates |
09/09/1998 | 98-161 | Note to Editors: ACRS Meeting on Reliability and Probabilistic Risk Assessment on September 24 |
09/08/1998 | 98-160 | NRC Proposes Rule for Streamlined Hearing Process in License Transfer Cases |
09/08/1998 | 98-159 | NRC Advisory Committee on Nuclear Waste to Meet October 20-22 in Amargosa Valley and Las Vegas, Nevada |
09/04/1998 | 98-158 | NRC Issues Final Design Approval for Westinghouse AP600 Standard Nuclear Reactor |
09/03/1998 | I-98-103 | NRC Proposes $55,000 Civil Penalty Against BGE Company for Radiological Controls Violations at Calvert Cliffs Plant |
09/03/1998 | I-98-102 | NRC Terminates License of Schott Glass Technologies |
09/03/1998 | 98-157 | NRC Schedules Meeting September 17 in Blanding, Utah |
09/03/1998 | 98-156 | NRC Schedules Meeting in Moab, Utah |
09/02/1998 | 98-155 | NRC Amends Decommissioning Funding Rule for Nuclear Power Plants |
09/01/1998 | 98-154 | 26th Annual Water Reactor Safety Information Meeting to Be Held October 26-28 in Bethesda, Md. |
August 1998 |
||
08/31/1998 | I-98-101 | NRC Assesses Performance of Vermont Yankee Nuclear Power Plant; Overall Rating "Good," with Decline Noted in Plant Support |
08/28/1998 | II-98-55 | NRC Rates Summer Nuclear Plant "Superior" in All Four Areas of Latest Assessment Report |
08/28/1998 | III-98-48 | NRC Staff Rates Monticello Plant "Superior" in Three Areas, "Good" in Fourth Area for Latest Performance Evaluation |
08/28/1998 | I-98-100 | NRC, Utility to Discuss Shipment of Haddam Neck Reactor Vessel |
08/28/1998 | 98-153 | NRC to Hold Public Meeting on Possible Changes to Enforcement Policy |
08/27/1998 | 98-152 | NRC Terminates Licenses at Request of Cintichem in Tuxedo, New York |
08/27/1998 | 98-151 | NRC Offers Opportunity for Public to Make Oral Statements on New Mexico Project |
08/26/1998 | IV-98-33 | Cooper Nuclear Station Rated "Superior" in One Area, "Good" in Two, "Acceptable" in the Fourth in NRC Assessment Report |
08/21/1998 | 98-150 | NRC to Hold Workshop on Improving Assessment of Nuclear Power Plant Performance |
08/20/1998 | I-98-98 | NRC Proposes $55,000 Fine Against Indian Point 3 Plant Operator for Violations Involving Emergency System Design Change |
08/20/1998 | 98-149 | NRC Closes Special Projects Office Overseeing Millstone Reactors |
08/19/1998 | 98-148 | NRC Directs Expedited Action by Licensing Board Considering Hearing on Calvert Cliffs License Renewal |
08/19/1998 | 98-147 | NRC Opens Public Document Room in New Mexico for Crownpoint Uranium Solution Mining Project |
08/18/1998 | I-98-97 | NRC Assigns New Resident Inspector to Calvert Cliffs |
08/18/1998 | I-98-96 | NRC Staff Names New Resident Inspector at Beaver Valley |
08/18/1998 | 98-146 | NRC Issues License to U.S. Air Force for Research Reactor at McClellan Air Force Base |
08/17/1998 | 98-145 | NRC Seeks Nominations for Advisory Committee on the Medical Uses of Isotopes |
08/14/1998 | I-98-95 | NRC, Utility to Discuss Millstone Units at Two Meetings |
08/14/1998 | II-98-54 | NRC Staff Issues Report Assessing Performance at St. Lucie Nuclear Power Plant in Florida |
08/14/1998 | 98-144 | NRC Lifts Restrictions on Loading of Spent Fuel Casks at Point Beach Nuclear Power Plant in Wisconsin |
08/13/1998 | I-98-94 | NRC Chairman Jackson to Tour Three Mile Island Nuclear Plant, Conduct Press Conference at Facility on Tuesday, August 18 |
08/12/1998 | 98-143 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, September 2-4 |
08/12/1998 | 98-142 | NRC Seeks Public Comment on Ways to Develop New Nuclear Power Plant Assessment Process |
08/10/1998 | 98-141 | Commission Adopts Policy Statement to Improve Conduct of Hearings |
08/07/1998 | 98-140 | NRC Announces Opportunity for Evidentiary Hearing on Oconee License Renewal |
08/07/1998 | 98-139 | NRC Proposes Extensive Revisions to Regulations on Medical Uses of Radioactive Material |
08/07/1998 | 98-138 | NRC Proposes to Reissue Policy Statement on Medical Uses of Radioactive Materials |
08/04/1998 | I-98-93 | Note to Editors: NRC Staff to Meet with Consolidated Edison Company on Friday, August 7 |
08/03/1998 | II-98-53 | NRC Officials to Hold Operational Readiness Meeting with Officials of New Irradiator Facility at Forest, Virginia |
08/03/1998 | II-98-52 | NRC Names New Senior Resident Inspector at St. Lucie Nuclear Power Plant |
08/03/1998 | II-98-51 | NRC Names New Senior Resident Inspector at Farley Nuclear Power Plant |
08/03/1998 | I-98-92 | NRC Assigns New Resident Inspector at Indian Point 2 |
08/03/1998 | I-98-91 | NRC Staff Assigns New Resident Inspector to Susquehanna |
08/03/1998 | I-98-90 | NRC Staff Appoints New Resident Inspector at TMI |
08/03/1998 | 98-137 | NRC Issues Draft Guidance on Compliance with Radiological Criteria for License Termination |
08/03/1998 | 98-136 | NRC Schedules Meetings on Uranium, Thorium in Texas, New Mexico, Wyoming, Colorado |
July 1998 |
||
07/31/1998 | 98-135 | Note to Editors: Seven LetterReports |
07/31/1998 | 98-134 | Note to Editors: ACNW Technical Meeting on August 27-28 |
07/31/1998 | 98-133 | Note to Editors: ACRS Meeting on Planning and Procedures on September 1 |
07/30/1998 | 98-132 | Note to Editors: ACRS Meeting on Thermal-Hydraulic Phenomena on Aug. 27 |
07/30/1998 | I-98-89 | Note to Editors: Discussion on Recent Event at Haddam Neck |
07/29/1998 | 98-131 | NRC to Hold Public Meeting on Reporting Requirements for Nuclear Power Plants |
07/29/1998 | 98-130 | Note to Editors: Meeting on Risk Assessment on August 26 |
07/29/1998 | 98-129 | NRC Identifies Nuclear Power Plants Warranting Increased Regulatory Attention |
07/28/1998 | 98-128 | Chairman and Vice-Chairman of NRC's Advisory Committee on Nuclear Waste Re-Elected |
07/28/1998 | 98-127 | NRC Order to TU Electric Confirms Fire Barrier Corrective Actions at Comanche Peak Unit 1 |
07/24/1998 | III-98-46 | NRC Staff Finds Sufficient Improvements for Restart of Unit 1 of the LaSalle Nuclear Power Station |
07/24/1998 | 98-126 | NRC Requests Comments on Draft Document Assessing Use of Potassium Iodide During a Severe Reactor Accident |
07/23/1998 | 98-125 | NRC to Hold Meetings on Proposed Revisions to Medical Policy Statement, Regulations |
07/23/1998 | 98-124 | NRC to Hold Informal Public Hearing on Petition to Revoke, Modify or Suspend Operating License for D.C. Cook Plant |
07/22/1998 | I-98-88 | Note to Editors: Enforcement Conference Between NRC and Windham Community Memorial Hospital Rescheduled for July 28 |
07/22/1998 | I-98-87 | NRC Schedules Meeting on Indian Point 3 Apparent Violations |
07/22/1998 | IV-98-32 | NRC Holds Public Meeting to Discuss Plans for Shipping Trojan Reactor Vessel to Hanford |
07/22/1998 | IV-98-31 | Neil O'Keefe Assigned Senior Resident Inspector for NRC at South Texas Project |
07/21/1998 | I-98-86 | NRC Assesses Performance of Oyster Creek Nuclear Power Plant, with 'Superior' Rating for Maintenance, 'Good' for Other Areas |
07/20/1998 | 98-123 | NRC Considers Changes to Regulations for Spent Fuel Storage Cask Designers |
07/17/1998 | III-98-45 | NRC Staff to Meet with Commonwealth Edison Company to Discuss Startup of Unit 1 at LaSalle Nuclear Station |
07/16/1998 | 98-122 | NRC Increases Insurance Assessment for Nuclear Power Plants Based on Inflation |
07/16/1998 | III-98-44 | NRC Staff Proposes $55,000 Fine Against U.S. Enrichment Corporation for Violation at Portsmouth Plant |
07/15/1998 | 98-121 | NRC Issues Proposed Revisions to Regulations on Respiratory Protection |
07/15/1998 | 98-120 | NRC Order to Florida Power & Light Confirms Fire Barrier Corrective Actions at St. Lucie Unit 1 |
07/14/1998 | III-98-43 | NRC Rates Byron Nuclear Plant "Superior" in 2 Areas, "Good" in Two Others in Latest Performance Review |
07/14/1998 | I-98-85 | Note to Editors: Enforcement Conference Windham Community Memorial Hospital |
07/14/1998 | I-98-84 | Note to Editors: NRC Staff Member to Answer Questions Regarding Maine Yankee |
07/13/1998 | I-98-83 | NRC, Duquesne Light to Discuss Restart of Beaver Valley Units |
07/13/1998 | IV-98-30 | NRC Proposes to Fine Arizona Public Service Company $50,000 for violations at Palo Verde Nuclear Plant |
07/13/1998 | I-98-82 | NRC Cites Breitling USA, Inc., for Willful Violations of Agency Requirements, Proposes $26,400 Fine |
07/13/1998 | I-98-81 | NRC, Connecticut Hospital to Discuss Apparent Violations |
07/10/1998 | 98-119 | NRC Announces Opportunity for Evidentiary Hearing on Calvert Cliffs License Renewal |
07/10/1998 | 98-118 | NRC Order to the Virginia Power Confirms Fire Barrier Corrective Actions at Surry Units 1 and 2 |
07/10/1998 | 98-117 | Note to Editors: ACRS Meeting July 17 |
07/09/1998 | IV-98-29 | NRC to Meet with Washington Public Power Supply System to Discuss Apparent Violation at WNP-2 |
07/09/1998 | 98-116 | Chairman to Be Inducted into National Women's Hall of Fame |
07/09/1998 | 98-115 | Commission to Meet with Stakeholders July 17 |
07/08/1998 | 98-114 | NRC Advisory Committee on Reactor Safeguards to Meet in Atlanta July 29 |
07/08/1998 | 98-113 | Note to Editors: ACRS Subcommittee Scheduled for July 17 |
07/08/1998 | 98-112 | NRC Order to Pennsylvania Power & Light Confirms Fire Barrier Corrective Actions at Susquehanna Units |
07/08/1998 | I-98-80 | NRC Issues $55,000 Civil Penalty Against PECO Energy Company for Violations Involving Ineffective Valve Repairs at Limerick |
07/07/1998 | I-98-79 | NRC Proposes $110,000 Civil Penalty Against Consolidated Edison for Testing, Repair Violations at Indian Point 2 Nuclear Plant |
07/07/1998 | III-98-42 | NRC Staff to Meet with Public to Discuss Future Dresden Unit 1 Decommissioning Activities |
07/06/1998 | II-98-50 | NRC Names New Senior Resident Inspector at Hatch Nuclear Power Plant |
07/06/1998 | I-98-78 | Duke Engineering & Services to Brief NRC Staff on Region I Work |
07/02/1998 | III-98-41 | NRC Staff to Hold Predecisional Enforcement Conference on Possible Operator Examination Violation at Dresden Plant |
07/02/1998 | IV-98-28 | NRC Inspection Team to Meet with WNP-2 |
07/02/1998 | I-98-77 | Note to Editors: Press Availability on July 9 |
07/02/1998 | II-98-49 | NRC Rates Farley Nuclear Plant "Superior" in Three Areas, "Good" in One Area of Latest Assessment Report |
07/02/1998 | 98-111 | Note to Editors: Error in Announcement 98-108 |
07/02/1998 | 98-110 | NRC Issues License for Spent Fuel Storage Installation at North Anna Nuclear Power Plant |
07/01/1998 | 98-109 | NRC Grants Petition to Require Consideration of Use of Potassium Iodide in Emergency Response |
07/01/1998 | I-98-76 | NRC, Latrobe (Pa.) Testing Firm to Discuss Apparent Violations |
June 1998 |
||
06/30/1998 | IV-98-27 | Peter Alter Assigned Resident Inspector for NRC at Grand Gulf Nuclear Station |
06/30/1998 | 98-107 | NRC Order to Illinois Power Co. Confirms Fire Barrier Corrective Actions at Clinton Power Station |
06/29/1998 | I-98-75 | Note to Editors: Special Projects Meeting Postponed |
06/29/1998 | 98-106 | NRC Requires Information from Uranium Processors About "Year 2000" Computer Readiness |
06/29/1998 | 98-105 | NRC Staff Authorizes Northeast Utilities to Begin Restart of Millstone Unit 3 |
06/26/1998 | 98-104 | Note to Editors: ACRS Meeting Changed |
06/26/1998 | 98-103 | NRC to Hold Public Meeting in Chicago Area on Nuclear Industry Role in Regulation |
06/25/1998 | 98-102 | NRC Seeks Public Input for Environmental Statement on Proposed Calvert Cliffs License Renewal |
06/25/1998 | 98-101 | NRC Staff to Hold Workshop on Status of Efforts to Improve the Regulatory Process |
06/25/1998 | 98-100 | NRC Advisory Committee on Nuclear Waste to Meet July 20-22 in Rockville, MD |
06/25/1998 | III-98-40a | NRC Inspection Team Monitoring Davis-Besse Plant Response to Tornado Damage and Loss of Offsite Power |
06/25/1998 | III-98-40 | NRC Team Dispatched to Davis-Besse Plant |
06/24/1998 | I-98-74 | Note to Editors: NRC Reschedules Public Meeting on Millstone |
06/24/1998 | 98-99 | NRC Order to Southern Nuclear Operating Co. Confirms Fire Barrier Corrective Actions at Hatch 1 and 2 Nuclear Plants |
06/24/1998 | 98-98 | Note to Editors: Two Subcommittees of ACRS Have Scheduled Meetings in July |
06/24/1998 | III-98-39 | NRC, Dairyland Power Cooperative Officials to Discuss Apparent Violations at La Crosse Plant |
06/23/1998 | IV-98-26 | NRC Rates Diablo Canyon "Superior" in Two Areas "Good" in Two Others in Latest Report |
06/23/1998 | I-98-73 | NRC to Meet with Public on Peach Bottom 1 Decommissioning |
06/22/1998 | 98-97 | NRC Order to the Toledo Edison Confirms Agreement to Complete Fire Barrier Corrective Actions at Davis-Besse Nuclear Plant |
06/22/1998 | 98-96 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, July 8-10 |
06/19/1998 | 98-95 | NRC Staff to Meet with the American Nuclear Society for Two-Day Workshop on Licensing Issues |
06/18/1998 | IV-98-25 | NRC Sends Inspection Team to WNP-2 |
06/18/1998 | IV-98-23 | NRC Proposes to Fine Entergy $110,000 for Violations at Waterford 3 Nuclear Power Plant |
06/18/1998 | I-98-72 | Note to Editors: Special Projects Office Public Meetings Concerning Millstone |
06/18/1998 | 98-94 | NRC Order to the Tennessee Valley Authority Confirms Agreement to Complete Fire Barrier Corrective Actions at Sequoyah 1 and 2 |
06/17/1998 | IV-98-24 | NRC Monitors Unusual Event at WNP-2 |
06/17/1998 | I-98-71 | NRC Proposes $55,000 Fine Against GPU Nuclear Corporation for Violations Involving Emergency System at Oyster Creek Plant |
06/17/1998 | 98-93 | Note to Editors: NRC Received Eight Reports from ACRS Following the June 3-5 Meeting |
06/17/1998 | 98-92 | NRC Order to the Virginia Electric Confirms Fire Barrier Corrective Actions at North Anna 1 |
06/16/1998 | 98-91 | Dr. Dana A. Powers Reappointed to NRC's Advisory Committee on Reactor Safeguards |
06/15/1998 | 98-90 | Commission Authorizes Restart of Millstone Unit 3 when Permitted by NRC Staff |
06/15/1998 | 98-89 | Note to Editors: ACRS Meetings Scheduled |
06/15/1998 | I-98-70 | NRC Schedules Meeting with Operator of Calvert Cliffs Plant to Discuss Apparent Violations Involving Radiological Controls |
06/12/1998 | I-98-69 | NRC Proposes $55,000 Fine for PECO Energy for Two Violations Involving Problems That Affected Emergency Cooling Pump |
06/12/1998 | II-98-47 | NRC to Meet with Duke Energy on July 8 to Discuss Nuclear Power Plant Ice Condensers |
06/11/1998 | 98-88 | NRC Amends Regulations Governing Timepieces Containing Tritium |
06/10/1998 | III-98-38 | NRC Staff Reschedules Predecisional Enforcement Conference on Possible Fire Protection Violations at Quad Cities Plant (new date for meeting previously scheduled for June 8) |
06/10/1998 | I-98-68 | NRC Sends Special Team to Vermont Yankee to Check Circumstances of Shutdown |
06/10/1998 | I-98-67 | NRC Rates Hope Creek as "Superior" in Area of Plant Support, "Good" in Three Areas, in Latest Periodic Evaluation |
06/10/1998 | II-98-46 | Meeting Scheduled to Address Pilot Program for NRC Oversight at DOE Savannah River Plant |
06/10/1998 | II-98-45 | NRC Official to Hold News Conference to Discuss Regulatory Issues and Status of Crystal River |
06/10/1998 | II-98-44 | NRC Staff Issues Report on Performance at Crystal River Nuclear Power Plant |
06/09/1998 | 98-87 | NRC Staff Issues Confirmatory Order to South Texas Project Requiring Improvements to Employee Concerns Program |
06/09/1998 | I-98-66 | Note to Editors: NRC's Special Projects Office Meetings Scheduled |
06/08/1998 | II-98-43 | NRC Sets Enforcement Conference with Duke Energy Corporation to Discuss Regulatory Concerns at Oconee |
06/08/1998 | I-98-65 | NRC, PECO to Discuss Apparent Violations at Limerick Plant |
06/05/1998 | IV-98-22 | NRC Gives Siemens Good Safety Rating in Latest Performance Review |
06/05/1998 | III-98-37 | Note to Editors: Quad Cities Enforcement Conference Postponed |
06/04/1998 | I-98-64 | NRC Proposes $5,500 Fine Against Alaron Corporation; Issues Demand for Information |
06/03/1998 | 98-86 | Statement by the Chairman of the Nuclear Regulatory Commission |
06/03/1998 | 98-85 | NRC Amends Licensing, Inspection and Annual Fees |
06/03/1998 | IV-98-21 | Wolf Creek Rated 'Good' in All Areas in Latest NRC Assessment Report |
06/01/1998 | II-98-42 | NRC Schedules Meeting with Florida Power & Light to Discuss Recent Performance of St. Lucie Plant |
06/01/1998 | II-98-41 | NRC to Meet with TVA in Atlanta on June 16 to Discuss Nuclear Power Plant Ice Condensers |
May 1998 |
||
05/29/1998 | III-98-36 | NRC, United States Enrichment Corp. Officials to Discuss Apparent Violations at Portsmouth Plant |
05/28/1998 | III-98-35 | NRC Staff to Hold Predecisional Enforcement Conference on Possible Fire Protection Violations at Quad Cities Plant |
05/28/1998 | I-98-63 | NRC Staff Issues Report on Performance at Calvert Cliffs; Performance Is "Superior" in One Area, Declines in Two Others |
05/28/1998 | 98-84 | NRC Order to GPU Nuclear, Inc. Confirms Agreement to Complete Fire Barrier Corrective Actions at Oyster Creek and Three Mile Island |
05/27/1998 | II-98-40 | NRC Staff Issues Report on Performance at Browns Ferry Nuclear Power Plant |
05/27/1998 | I-98-62 | NRC, GPU to Discuss Oyster Creek Apparent Violations on May 29 |
05/27/1998 | 98-83 | NRC Order to Florida Power Corp. Confirms Agreement to Complete Fire Barrier Corrective Actions |
05/26/1998 | 98-82 | NRC to Allow More Licensees to Use Self-Guarantee for Decommissioning Funding |
05/26/1998 | II-98-39 | NRC Staff Proposes $4,400 Civil Penalty Against Physician for Violations of NRC Requirements in Puerto Rico |
05/22/1998 | I-98-61 | Note to Editors: Meeting Scheduled to Discuss Indian Point 2 |
05/22/1998 | III-98-34 | NRC Staff Finds Improvements to Fire Protection System and Procedures Sufficient for Restart of Quad Cities Plant |
05/22/1998 | 98-81 | NRC Changes Regulations for Transportation of High-Level Waste Containing Plutonium |
05/22/1998 | 98-80 | NRC Order to Peach Bottom Atomic Power Station Confirms Agreement to Complete Fire Barrier Corrective Actions |
05/21/1998 | I-98-60 | NRC to Discuss "Maintenance Rule" Concerns at Calvert Cliffs |
05/21/1998 | 98-79 | Commission Concurs with Staff on Three Millstone Restart Issues |
05/20/1998 | I-98-59 | Indian Point 2 Safety Assessment to Be Discussed on May 27 |
05/20/1998 | III-98-33 | NRC Staff to Meet with Public to Discuss Future Zion Nuclear Plant Decommissioning Activities |
05/20/1998 | I-98-58 | NRC Staff Proposes $55,000 Fine Against Boston Edison for Security Violations at Pilgrim Nuclear Plant |
05/20/1998 | 98-78 | NRC Order to PECO Energy Company Confirms Agreement to Complete Fire Barrier Corrective Actions |
05/20/1998 | 98-77 | Note to Editors: ACRS Meetings Scheduled in June |
05/20/1998 | 98-76 | NRC Staff Reaches Significant Milestone in Review of Westinghouse AP600 Advanced Reactor Design |
05/19/1998 | IV-98-20 | NRC Proposes $2,750 Fine Against the Terracon Companies for Lax Security Measures |
05/18/1998 | III-98-32 | NRC Staff Withdraws Notice of Violation and Proposed $25,000 Fine Against Michigan Utility in 1993 Employment Discrimination Case |
05/18/1998 | 98-75 | Note to Editors: NRC Received Four Reports from ACRS |
05/15/1998 | 98-74 | NRC Licensees Temporarily Authorized to Possess Molybdenum-99 in Quantities That Exceed License Limits |
05/15/1998 | I-98-57 | NRC, PECO to Discuss Apparent Violations at Peach Bottom Plant |
05/15/1998 | I-98-56 | NRC Proposes Fine for Pa. Hospital for Nuclear Medicine Violation |
05/15/1998 | II-98-38 | NRC Staff Proposes $10,500 Civil Penalty Against Baxter Health Care Corporation of Puerto Rico |
05/15/1998 | 98-73 | Note to Editors: ACRS Meeting Scheduled June 11-12 |
05/14/1998 | 98-72 | NRC Seeks Public Input for Environmental Impact Statement on Proposed Spent Fuel Storage Facility in Utah |
05/13/1998 | II-98-37 | NRC Inspection Team at Catawba to Brief Duke Energy Officials on Friday |
05/13/1998 | I-98-55 | Note to Editors: Millstone Commission Meeting Rescheduled |
05/13/1998 | I-98-54 | NRC to Discuss Apparent Packaging Violation with Pa. Company |
05/13/1998 | 98-71 | NRC Amends Regulations on Physical Protection for Storage of Spent Fuel |
05/13/1998 | 98-70 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, June 3-5 |
05/12/1998 | II-98-36 | NRC Staff Schedules Management Meetings at Oconee |
05/12/1998 | II-98-35 | NRC Officials Send Inspection Team to Catawba |
05/12/1998 | 98-69 | NRC to Hold Public Meeting in Pennsylvania on Decommissioning of B&W Shallow Land Disposal Area |
05/12/1998 | 98-68 | NRC Requires Information from Nuclear Power Plant Licensees About 'Year 2000' Readiness of Computer Systems |
05/08/1998 | 98-67 | NRC Publishes Revision of Enforcement Policy |
05/08/1998 | III-98-31 | NRC, American Electric Power Co. Officials to Discuss Apparent Violations at D.C. Cook Plant |
05/08/1998 | 98-66 | NRC Employees Receive Presidential Rank Awards |
05/08/1998 | 98-65 | NRC Issues Comments to Fish and Wildlife Service on its Revised Draft Opinion on Utah Site Cleanup Plan |
05/07/1998 | I-98-53 | NRC to Discuss Security Violations at Nine Mile Point Station |
05/07/1998 | 98-64 | Note to Editors: ACRS Meetings Scheduled for Next Month |
05/07/1998 | IV-98-19 | Thomas Farnholtz Assigned Senior Resident Inspector for NRC at Waterford 3 |
05/06/1998 | I-98-52 | NRC Rates Beaver Valley "Good" in Latest Assessment |
05/05/1998 | III-98-30 | NRC Staff Rates Prairie Island "Superior" in Maintenance and Plant Support and "Good" in Operations and Engineering |
05/05/1998 | I-98-51 | NRC Lifts Restrictions on Radiological Work at Haddam Neck |
05/01/1998 | I-98-50 | NRC, Utility to Discuss Apparent Violations at Indian Point 2 |
05/01/1998 | 98-63 | NRC to Meet with Public in Las Vegas on Pre-Licensing Program for Possible Waste Repository |
April 1998 |
||
04/30/1998 | II-98-34 | NRC Rates Surry Nuclear Plant "Superior" in Three Areas, "Good" in One Area of Latest Assessment Report |
04/30/1998 | I-98-49 | NRC Confirms BG&E's Commitments to Address Radiological Control Program Weaknesses at Calvert Cliffs |
04/30/1998 | 98-62 | NRC Senior Management Assignments Announced |
04/30/1998 | 98-61 | NRC Advisory Committee on Nuclear Waste to Hold Working Group Meeting June 10-11 on Yucca Mountain Issues |
04/29/1998 | I-98-48 | NRC to Hold Predecisional Enforcement Conference with PP&L |
04/29/1998 | III-98-29 | NRC Staff to Meet with Public to Discuss Future La Crosse Decommissioning Activities |
04/29/1998 | I-98-47 | NRC Staff proposes Fine Against Washington, D.C. Hospital |
04/28/1998 | II-98-33 | NRC Staff Proposes $5,000 Fine Against Physician in Puerto Rico |
04/28/1998 | IV-98-18 | NRC Proposes to Fine Wood River Medical Center $2,750 for Violations in its Nuclear Medicine Program |
04/28/1998 | IV-98-17 | Waterford Plant Rated 'Good' in All Areas in NRC Assessment Report |
04/28/1998 | I-98-46 | NRC Proposes $165,000 Civil Penalty for Boston Edison Company for Variety of Violations at Pilgrim Nuclear Power Plant |
04/28/1998 | I-98-45 | NRC Assigns New Resident Inspector to Limerick Generating Station |
04/27/1998 | I-98-44 | Note to Editors: Millstone Meetings Scheduled |
04/24/1998 | I-98-43 | NRC to Discuss Apparent Violations at Altoona (Pa.) Hospital |
04/24/1998 | 98-59 | Note to Editors: Envirocare Inspection Report |
04/24/1998 | 98-60 | Atomic Safety and Licensing Board to Hold Hearing on Order Barring Individual's Involvement in NRC Licensed Activities |
04/24/1998 | 98-58 | NRC Staff Report Recommends Ways to Improve Agency's Communications with Public |
04/23/1998 | 98-57 | NRC Issues Confirmatory Order for USEC Plant in Kentucky |
04/22/1998 | IV-98-16 | NRC Inspection Finds Apparent Violation of Federal Regulation; Agency Requires Further Information |
04/22/1998 | IV-98-15 | NRC to Discuss Humboldt Bay Decommissioning Plans with Public |
04/22/1998 | II-98-32 | NRC Staff Issues Confirmatory Order Modifying Radioactive Material License of a Physician in Puerto Rico |
04/20/1998 | 98-56 | Note to Editors: ACRS Meeting Scheduled May 13-15 |
04/20/1998 | 98-55 | Note to Editors: ACRS Meeting Scheduled May 11 and 12 |
04/20/1998 | 98-54 | Note to Editors: NRC Received Five Reports from its ACRS |
04/17/1998 | III-98-27 | NRC Staff Proposes $2,500 Fine Against Overhoff Technology Corporation for Distribution Violations |
04/17/1998 | I-98-42 | NRC Staff to Meet with Radiography Firm to Discuss Apparent Violations |
04/17/1998 | III-98-28 | NRC Staff to Meet with AlliedSignal for Enforcement Conference on Recent Inspection Findings at Metropolis Plant |
04/17/1998 | II-98-31 | NRC Staff Withdraws Violation and Proposed $80,000 Fine Against TVA for Alleged Discrimination at Sequoyah and Watts Bar |
04/15/1998 | 98-53 | NRC Takes Steps to Improve Management of Devices Containing Radioactive Material |
04/15/1998 | IV-98-14 | Jim Spets Assigned Resident Inspector for NRC at WNP-2 |
04/15/1998 | I-98-41 | NRC Staff Proposes to Fine Vermont Yankee $55,000 for Violations of NRC Requirements |
04/14/1998 | I-98-40 | NRC Prohibits Pennsylvania Company from Using Nuclear Gauges |
04/14/1998 | IV-98-13 | NRC Rates Palo Verde Nuclear Plant Superior' in Three Areas and Good' in One Other in Assessment Report |
04/14/1998 | II-98-30 | NRC Names New Resident Inspector at Summer Nuclear Power Plant |
04/14/1998 | III-98-25 | NRC Staff Notes "Steady Improvement" in Performance at Perry Nuclear Plant in Latest Assessment |
04/13/1998 | III-98-26 | Change in Date for ABB Combustion Engineering Meeting |
04/13/1998 | I-98-39 | NRC Rates Ginna Plant Performance as "Good" in Latest Assessment; Area of Plant Support Declines from "Superior" During Period |
04/13/1998 | 98-52 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, April 30 - May 2 |
04/10/1998 | II-98-29 | NRC Staff Plans Performance Review Meeting at Westinghouse Commercial Nuclear Fuel Division in Columbus, SC |
04/10/1998 | 98-51 | Note to Editors: ACRS Meeting on April 29 |
04/09/1998 | I-98-38 | NRC Staff, Washington Hospital Center Officials to Discuss Apparent Violations |
04/07/1998 | 98-50 | Note to Editors: ACRS Meeting Scheduled for April 23-24 |
04/07/1998 | 98-49 | Note to Editors: April 17 ACRS Meeting Postponed |
04/03/1998 | IV-98-12 | NRC to Meet with WNP-2 to Discuss March 11 Automatic Shutdown |
04/03/1998 | II-98-28 | NRC Staff Issues Assessment of Sequoyah Performance |
04/03/1998 | III-98-24 | NRC Staff Proposes $55,000 Fine Against Consumers Power Co. for October Incident at Palisades Nuclear Plant |
04/03/1998 | III-98-23 | NRC Plans Performance Review Meeting at ABB Combustion Engineering Fuel Plant in Hematite, Missouri |
04/03/1998 | III-98-22 | NRC Staff to Meet with Public to Discuss Future Fermi Decommissioning Activities |
04/03/1998 | 98-48 | NRC Reverses Licensing Board Requirement for Staff Inquiry into Alleged Racial Discrimination in Siting of Proposed LES Facility |
04/02/1998 | I-98-37 | Note to Editors: Meetings on Millstone |
04/01/1998 | I-98-36 | NRC Region 1 Administrator Approves Restart of Salem Unit 1 |
04/02/1998 | 98-47 | NRC Advisory Committee on Nuclear Waste to Meet April 21-23 in Rockville, MD |
04/02/1998 | 98-46 | NRC and University of Michigan to Discuss Apparent Violations at the Ford Nuclear Reactor |
04/01/1998 | 98-45 | NRC Proposes to Amend Licensing, Inspection and Annual Fees |
March 1998 |
||
03/31/1998 | 98-44 | NRC Issues Letter to INC Confirming Suspension of Fabrication of Packages for Transportation of Radioactive Material |
03/31/1998 | II-98-27 | NRC Names New Resident Inspector at Surry Nuclear Power Station |
03/27/1998 | II-98-26 | NRC Staff Issues Order Suspending License of Radiography Company in Puerto Rico |
03/27/1998 | II-98-25 | NRC Staff Proposes to Fine CP&L $55,000 for a Violation at the Harris Nuclear Power Plant |
03/27/1998 | I-98-35 | NRC Staff Issues Confirmatory Action Letter to Consolidated Edison |
03/26/1998 | I-98-34 | NRC Commissioner Diaz to Visit Millstone Nuclear Plant on April 6 |
03/26/1998 | 98-43 | NRC Order to Washington Public Power Supply System Confirms Agreement to Complete Fire Barrier Corrective Actions |
03/26/1998 | I-98-33 | Note to Editors: NRC Staff Scheduled Meetings to Discuss Millstone |
03/26/1998 | II-98-24 | NRC Staff Proposes $5,500 Fine Against Kentucky Engineering and Testing Firm |
03/25/1998 | II-98-23 | NRC Staff Proposes to Fine FPL $88,000 for Violations at the St. Lucie Nuclear Power Plant |
03/25/1998 | III-98-21 | NRC Schedules Two Meetings at Quad Cities Nuclear Plant |
03/25/1998 | 98-42 | Note to Editors: ACRS Meeting Scheduled for April 17 |
03/24/1998 | 98-41 | Note to Editors: ACRS Meeting Scheduled for April 16 |
03/24/1998 | II-98-22 | NRC Staff Sets Enforcement Conference with FPC to Discuss Regulatory Concerns at Crystal River |
03/23/1998 | I-98-32 | NRC Proposes $55,000 Civil Penalty Against PSE&G for Violation Stemming from Reactor Operators' Failure to Follow Procedures |
03/23/1998 | IV-98-11 | NRC to Meet with Entergy to Discuss Apparent Violations at Waterford 3 Nuclear Power Plant |
03/23/1998 | III-98-20 | D.C. Cook Nuclear Plant Rated "Good" in Operations, Maintenance, and Plant Support, "Acceptable" in Engineering in Latest NRC Review |
03/20/1998 | III-98-19 | NRC Staff Proposes $55,000 Fine Against U.S. Enrichment Corporation for Violations of NRC Safety Requirements at Portsmouth, OH, Plant |
03/19/1998 | 98-40 | NRC Issues Letter to Siemens Nuclear Division Confirming Actions on Transportation Packages |
03/19/1998 | II-98-21 | NRC Staff to Hold March 31 Enforcement Conference with FP&L to Discuss Security Concerns at St. Lucie Nuclear Power Plant |
03/18/1998 | I-98-31 | NRC Staff to Review Apparent Violation at Seabrook Nuclear Plant |
03/17/1998 | I-98-30 | NRC, GPU Nuclear to Discuss Apparent Violations at Oyster Creek |
03/17/1998 | I-98-29 | NRC Staff to Meet with Public to Discuss Schott Glass Technologies License Termination Request |
03/17/1998 | 98-39 | Note to Editors: NRC Received Four Reports from ACRS |
03/17/1998 | 98-38 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, April 2-4 |
03/17/1998 | 98-37 | Note to Editors: NRC's ACRS Meeting Scheduled on April 1 |
03/17/1998 | 98-36 | Note to Editors: NRC Received Two Reports from ACRS |
03/16/1998 | II-98-20 | Meeting Scheduled to Address Pilot Program for NRC Oversight at DOE's Oak Ridge National Laboratory |
03/16/1998 | I-98-28 | NRC Proposes $4,400 Civil Penalty Against Delaware Firm for Violation Involving Transportation of Radioactive Material |
03/13/1998 | IV-98-10 | NRC Special Inspection Team Sent to WNP-2 |
03/13/1998 | III-98-18 | NRC Staff Proposes $330,000 Fine Against Commonwealth Edison Co. for Testing Violations at Quad Cities Nuclear Power Station |
03/12/1998 | 98-35 | ACRS Meeting Scheduled March 31 and April 1 |
03/12/1998 | 98-34 | ACNW 95th Technical Meeting on March 23-25 |
03/12/1998 | I-98-27 | NRC, Utility to Discuss Indian Point 2 Improvement Plans |
03/11/1998 | III-98-17 | NRC, Commonwealth Officials to Discuss Apparent Violations at Dresden Station |
03/09/1998 | II-98-19 | NRC Names New Senior Resident Inspector at Vogtle Nuclear Power Plant |
03/09/1998 | II-98-18 | NRC Official to Hold News Conference near St. Lucie Nuclear Plant |
03/09/1998 | I-98-26 | NRC Proposes $55,000 Fine Against Northeast Utilities for Violation Involving Safety System Problem Identification |
03/06/1998 | II-98-17 | NRC Names New Resident Inspector at Harris Nuclear Power Plant |
03/04/1998 | I-98-25 | NRC, Haddam Neck Managers to Discuss Plant Decommissioning Work |
03/04/1998 | III-98-16 | NRC Staff Proposes $55,000 Fine for Maintenance Rule Violations at Quad Cities Station |
03/02/1998 | I-98-24 | Washington Hospital Center Agrees to Improve Handling of Radioactive Waste |
03/02/1998 | I-98-23 | NRC Staff Rates TMI "Superior" in Operations and Maintenance, "Good" in Plant Support and "Adequate" in Engineering |
February 1998 |
||
02/26/1998 | I-98-22 | NRC Sends Radiation Specialist to Oyster Creek |
02/26/1998 | I-98-21 | NRC, Vermont Yankee to Discuss Apparent Violations Found by Special Inspection of Plant's Design, Configuration |
02/25/1998 | I-98-20 | Note to Editors: NRC Meetings Scheduled with Millstone Station |
02/25/1998 | 98-33 | NRC Names Dr. Graham B. Wallis to Advisory Committee on Reactor Safeguards |
02/25/1998 | 98-32 | NRC Media Workshop Scheduled |
02/24/1998 | III-98-15 | NRC Staff to Discuss Quad Cities Plant Performance March 3; Regional Administrator to Brief News Media Following Meeting |
02/24/1998 | II-98-16 | NRC Staff Issues Assessment of Performance at Shearon Harris Nuclear Power Plant |
02/24/1998 | II-98-15 | NRC Staff to Discuss Apparent Violations with Physician and Hospital in Puerto Rico on March 2 |
02/24/1998 | II-98-14 | NRC Staff Issues Order to Former Farley Nuclear Plant Employee Prohibiting Involvement in NRC-Licensed Activities |
02/24/1998 | 98-31 | Note to Editors: NRC Received Four Reports from ACRS |
02/23/1998 | 98-30 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, March 2-4 |
02/20/1998 | IV-98-09 | Arkansas Plants Rated "Superior" in Three Areas "Good" in One in Latest NRC Assessment |
02/20/1998 | II-98-13 | NRC Staff to Meet February 27 with FPC Management to Discuss Restart of Crystal River Nuclear Plant |
02/20/1998 | II-98-12 | NRC Commissioner Diaz to Visit Catawba Nuclear Power Plant |
02/20/1998 | I-98-19 | NRC Staff to Review Findings of Salem Unit 1 Restart Inspection; Regional Administrator to Meet with Press Following Meeting |
02/19/1998 | I-98-18 | Note to Editors: Meetings on Millstone Station |
02/18/1998 | I-98-17 | NRC to Discuss Apparent Shipping Violation with Delaware Firm |
02/18/1998 | II-98-11 | NRC Staff Sets Enforcement Conference with CP&L to Discuss Regulatory Concerns at Harris |
02/18/1998 | IV-98-08 | NRC, Entergy Meet to Discuss Apparent Violations at Arkansas Nuclear One |
02/18/1998 | 98-07 | Commissioner Dicus, on February 10-13, Winter Meeting on Radiation Health Effects |
02/18/1998 | 98-29 | NRC Withdraws Proposal on Inadvertent Criticality Requirements for Nuclear Power Plants |
02/17/1998 | 98-28 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, March 5-6 |
02/13/1998 | II-98-10 | NRC Staff to Discuss Apparent Violation with Kentucky Engineering and Testing Company on February 18 |
02/13/1998 | 98-27 | Note to Editors ACRS Meeting March 2nd |
02/13/1998 | I-98-16 | NRC, Operator of FitzPatrick Plant to Discuss Apparent Violations |
02/13/1998 | II-98-09 | NRC Staff Sets Enforcement Conference with CP&L to Discuss Regulatory Concerns at Robinson |
02/12/1998 | 98-26 | NRC Schedules Meeting of Licensing Support System Advisory Review Panel |
02/12/1998 | 98-25 | NRC Notifies B&W of Actions Needed for Pennsylvania Burial Site Before Work Resumes on Environmental Statement |
02/12/1998 | III-98-14 | NRC, U.S. Enrichment Corp. Officials to Discuss Apparent Violations at Portsmouth Plant |
02/11/1998 | II-98-08 | NRC Names New Managers in Atlanta Regional Office |
02/11/1998 | III-98-13 | NRC to Hold Public Meeting in Cleveland on Recent Inspection at Advanced Medical Systems |
02/10/1998 | I-98-15 | Note to Editors: NRC Letter to Northeast Utilities Service Company |
02/10/1998 | II-98-07 | NRC Staff Withdraws Proposed Civil Penalty Against TVA at Sequoyah Nuclear Power Plant |
02/09/1998 | II-98-06 | NRC Staff Sets Enforcement Conference with FP&L to Discuss Regulatory Concerns at St. Lucie |
02/06/1998 | I-98-14 | NRC to Review Findings of Indian Point 2 Special Inspection |
02/06/1998 | IV-98-07 | NRC Commissioner Diaz to Meet with News Media Following Visit to Diablo Canyon Nuclear Plant |
02/06/1998 | I-98-13 | Note to Editors: Meetings on Millstone Scheduled |
02/06/1998 | 98-05 | Commissioner Diaz at Infocast's Conference on Nuclear Power in the Competitive Era on January 29, 1998 |
02/05/1998 | 98-24 | NRC Withdraws Proposal on Strategies for Assessing Licensees' Safety-Conscious Work Environment |
02/04/1998 | 98-23 | NRC Invites Public to Submit Nominations for Advisory Committee on Reactor Safeguards |
02/02/1998 | 98-04 | Chairman Jackson at the Public Meeting in Waterford, CT February 2 |
02/02/1998 | 98-003 | Chairman Jackson Press Conference at Waterford, CT February 2 |
02/03/1998 | I-98-12 | NRC Accepting Comments, Hearing Requests on Yankee Rowe Plan |
02/03/1998 | III-98-12 | NRC Special Inspection Team to Present Preliminary Findings on Small Uranium Hexafluoride Release at Allied-Signal Plant |
02/03/1998 | III-98-11 | NRC Staff Rates Quad Cities "Good" in Operations and Plant Support and "Acceptable" in Maintenance and Engineering |
02/02/1998 | 98-22 | NRC Advisory Committee to Discuss Proposed Rules on Medical Uses of Radioactive Material |
02/02/1998 | 98-21 | NRC Advisory Committee on Nuclear Waste to Meet February 24-26 in Rockville, MD |
January 1998 |
||
01/30/1998 | II-98-05 | NRC Regional Administrator Authorizes Restart of Crystal River Nuclear Power Plant |
01/30/1998 | 98-20 | Note to Editors: NRC's ACRS Meeting on February 19-20 |
01/30/1998 | 98-19 | Note to Editors: NRC's ACRS Meeting on February 18 |
01/28/1998 | 98-18 | Note to Editors: NRC Has Scheduled its FY 1999 Budget Review |
01/28/1998 | 98-17 | NRC Schedules Fourth Workshop on Demonstrating Compliance with Cleanup Criteria |
01/28/1998 | 98-16 | NRC Seeks Information on 'Year 2000' Readiness of Nuclear Power Plant Computer Systems; Asks Public Comment on Proposed Letter to Licensees |
01/28/1998 | 98-15 | NRC Staff Schedules Two-Day Conference to Discuss Regulatory Issues with Nuclear Industry |
01/28/1998 | I-98-11 | NRC Issues Notice of Violation but No Civil Penalty to TMI |
01/27/1998 | III-98-10 | NRC Staff Dispatches Augmented Inspection Team to Review Small Uranium Hexafluoride Release at Metropolis Plant |
01/27/1998 | I-98-10 | NRC Chairman Jackson to Tour Millstone Units on February 2; Will Hold Press Conference, Public Meeting |
01/27/1998 | I-98-09 | NRC Staff Rates Seabrook "Good" in Operations, Maintenance and Engineering and "Superior" in Plant Support |
01/23/1998 | I-98-8 | NRC Proposes $55,000 for Violations at Nine Mile Point |
01/22/1998 | III-98-09 | NRC, Indiana Company to Discuss Apparent Violations |
01/21/1998 | I-98-7 | NRC, Pa. Firm to Discuss Apparent Violation Involving Device |
01/21/1998 | IV-98-06 | NRC Proposes $5,500 Fine Against CTI Alaska, Inc. for Violation of Radiation Safety Requirements |
01/21/1998 | 98-14 | NRC Staff Identifies Nuclear Power Plants Warranting Increased Regulatory Attention |
01/20/1998 | III-98-08 | NRC, Ohio Company to Discuss Apparent Violations |
01/20/1998 | 98-13 | Note to Editors: ACRS Meeting Scheduled for January 30-31 |
01/16/1998 | 98-12 | NRC Seeks Comment on Petition for Rulemaking Concerning Use of Thyroid-Protecting Drug in Emergency Response |
01/16/1998 | 98-11 | NRC Cites Five Star Products and Construction Products Research for Alleged Discrimination Against Employee |
01/16/1998 | IV-98-05 | NRC, Entergy to Discuss Apparent Violations at Waterford 3 Nuclear Plant |
01/16/1998 | I-98-6 | NRC Sets Two Meetings on Maine Yankee Post-Shutdown Plans |
01/16/1998 | II-98-4 | NRC Staff Issues Assessment of Performance at Watts Bar Nuclear Power Plant |
01/16/1998 | III-98-07 | NRC Staff Proposes $110,000 Fine for Fitness-for-Duty Violations at Zion Nuclear Power Station |
01/16/1998 | III-98-06 | NRC Special Inspection to Present Findings at Mallinckrodt Medical, Inc. |
01/15/1998 | III-98-05 | Latest NRC Assessment Rates Point Beach "Good" in Operations, Maintenance, and Plant Support and "Acceptable" in Engineering |
01/15/1998 | 98-10 | NRC Schedules Third Workshop on Demonstrating Compliance with Cleanup Criteria |
01/15/1998 | 98-09 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, February 5-7 |
01/12/1998 | I-98-4 | NRC Proposes $55,000 Fine for Violation at Susquehanna Plant; Agency Cites Lack of Controls Over Emergency Diesel Generator |
01/13/1998 | I-98-05 | NRC Schedules Two Meetings on Hope Creek Apparent Violations |
01/13/1998 | 98-08 | NRC to End Environmental Monitoring Program with States |
01/13/1998 | 98-07 | Note to Editors: ACRS Has Scheduled a Meeting on February 3-4 |
01/12/1998 | 98-06 | Note to Editors: NRC's ACRS Meeting Scheduled on February 4 |
01/12/1998 | 98-05 | Note to Editors: NRC's ACRS Meeting Scheduled on February 3 |
01/09/1998 | IV-98-04 | International Nuclear Regulators Continue Conference with Visits to Livermore Laboratory, Yucca Mountain |
01/09/1998 | 98-02 | Commissioner Nils J. Diaz Before Sociedad Nuclear Mexicana, VIII Congreso, Guanajuato, Mexico |
01/09/1998 | 98-01 | Commissioner Nils J. Diaz Before the American Nuclear Society 1997 Winter Meeting, Albuquerque, New Mexico |
01/09/1998 | 98-04 | NRC Broadens the Scope of its Deliberate Misconduct Rule |
01/09/1998 | 98-003 | NRC Licensing Board to Hold Prehearing Conference on Proposed Spent Nuclear Fuel Storage Facility in Utah |
01/09/1998 | I-98-3 | NRC, Northeast Utilities to Discuss Apparent Violations; Six Other Meetings Also Scheduled Regarding Millstone |
01/09/1998 | III-98-04 | NRC Staff Rates FERMI "Superior" in Plant Support and "Good" in Operations, Maintenance, and Engineering |
01/08/1998 | III-98-03 | NRC Staff Prohibits Individual from Involvement in NRC-Licensed Activities |
01/08/1998 | IV-98-02 | NRC Chairman Jackson and International Nuclear Regulators Schedule News Conference in Las Vegas |
01/08/1998 | II-98-3 | NRC Staff to Discuss Apparent Violations with St. Luke's Hospital in Ponce, Puerto Rico |
01/08/1998 | II-98-2 | NRC Schedules Conference in Puerto Rico on Radiation Safety at Hospital Metropolitano |
01/08/1998 | IV-98-03 | South Texas Project Rated 'Superior' in Three Areas, 'Good' in Another, in Latest NRC Systematic Assessment Report |
01/07/1998 | I-98-2 | NRC Proposes to Fine Duquesne Light Company $55,000 for Violation at Beaver Valley Involving Emergency Cooling System |
01/07/1998 | 98-02 | NRC Proposes $13,750 Fine Against Westinghouse |
01/06/1998 | IV-98-01 | NRC Chairman Jackson and International Nuclear Regulators Schedule News Conference in Walnut Creek |
01/06/1998 | 98-01 | NRC Issues License to Hydro Resources for Uranium Mining Project in New Mexico |
01/06/1998 | III-98-02 | Latest NRC Assessment Rates Dresden "Acceptable" in Engineering and "Good" in Operations, Maintenance, and Plant Support |
01/06/1998 | II-98-1 | NRC Conference Scheduled with TVA on Radiation Exposure at Watts Bar |
01/02/1998 | I-98-11 | NRC Staff Finds Decline in Two Areas of Performance in Latest Evaluation of Nine Mile Point Nuclear Power Plants |
01/02/1998 | III-98-01 | NRC Predecisional Enforcement Conference on Apparent Violations of NRC Requirements at Quad Cities Station |