USDOT Federal Highway Administration USDOT Home | FHWA Home | Feedback
Skip to main content

Resources

Academic Resources

"Successful Delivery of Public-Private Partnerships for Infrastructure Development." P3Journal of Construction Engineering and Management, American Society of Civil Engineers, ASCE, 133(12), 918-931. Abdel Aziz, A. M (2007). [Login/password required]
Two common approaches have been used by governments for the implementation of public-private partnerships (P3s): a finance-based approach that aims to use private financing to satisfy infrastructure needs, and a service-based approach that aims to optimize the time and cost efficiencies in service delivery. The implementation of P3s, however, may suffer from legal, political, and cultural impediments. In the United States, the federal government enabled a number of acts to ease the impediments and promote P3s for infrastructure development. Based on a detailed analysis of P3s in the United Kingdom and British Columbia, Canada, this paper describes principles that would characterize the implementation of P3s at the program level (e.g., whether the implementation is successful). The principles pertain to the: availability of a P3 legal framework and implementation units; perception of the private finance objectives, risk allocation consequences, and value-for-money objectives; maintenance of P3s process transparency; standardization of procedures; and use of performance specifications. Guidelines for successful implementation are explained and discussed in the context of the United States P3s experience and impediments.

"A Survey of the Payment Mechanisms for Transportation DBFO (P3) Contracts in British Columbia" Project DeliveryP3
Construction Management and Economics, 25(5), 492-543 (London, UK). Abdel Aziz, A. M (2007). [Login/password required]
In traditional project delivery systems, payment mechanisms provide compensation for the work performed using construction capital payments. In the alternative public-private partnership (P3) systems, payment mechanisms follow the selected P3 system. For example, the build-operate-transfer system provides compensation based on project demand using real-tolls usage payments; the design-build-finance-operate (DBFO) system provides shadow-tolls usage payments; and the performance-based DBFO system provides compensation based on contractor's performance using service availability payments. Designing the payment structure is an important task where several factors have to be considered. This paper analyses the implementation of payment mechanisms in a number of DBFO transportation projects in BC, Canada, in terms of payment structure, payment types and characteristics, determination and funding. The analysis provides insights for the design of payment mechanisms. The analysis shows that more payment types are being used and that the mechanisms are designed to achieve specific government objectives. The analysis refers to a new ‘hybrid' payment mechanism with elements derived from the traditional and the P3 systems. The hybrid system may have potential to minimize the overall project cost; however, agencies have to be flexible in the delivery concepts as combinations of payments for inputs, usage and services might have to be used.

"A Structure for Government Requirements in Public-Private Partnerships " P3
Canadian Journal of Civil Engineering
, 28(6), 891-909. Abdel-Aziz, A. M. and Russell, A.D. (2001). [Login/password required]
A spectrum of requirements for the procurement of public infrastructure under various public-private partnership arrangements has been communicated by governments to the private sector participants. This paper suggests a structure for these requirements and demonstrates how they have been realized in public-private partnership projects. Government requirements are categorized and described under a structure of three dimensions: rights, obligations, and liabilities. Each dimension is further defined and explained through a number of attributes. The structure provides insights as to the basis for the different modes under public-private partnerships such as build-operate-transfer, build-own-operate-transfer, and build-transfer-operate. The structure is used to examine government requirements in a number of public-private partnership transportation projects. The results show that, for each dimension and its related attributes, comprehensive and clear articulation of government requirements is generally needed. This will reduce the amount of supplemental materials issued for the request for proposals, help consortiums in responding with proposals that can fit the requirements and reduce the amount of time spent in negotiations and (or) the need for contract amendments to reflect marketplace realities missed earlier.

"Public-Private Partnerships and the Development of Transport Infrastructure: Trends on Both Sides of the Atlantic"P3
First International Conference on Funding Transportation Infrastructure. Perez, Benjamin G. (PB Consult) and James W. March (FHWA). Institute of Public Economics at the University of Alberta. (August 2006).
This investigation focuses on how forces - such as the will of the government to extract resources to meet the public's needs and the extent to which the national economy can produce them - have shaped the use of P3s in developing transport infrastructure in Europe and the United States. It begins by describing the different ways the public and private sectors collaborate to develop transport infrastructure in the United States and then compares recent experience and emerging trends in P3 applications on both sides of the Atlantic.

FHWA P3 Resources

Value for Money State of the Practice (December 2011) P3
The 2011 Value for Money State-of-the Practice document was created to assist state practitioners in their P3 program efforts. Value for Money is a uniform process utilized on a case-by-case basis to compare the aggregate benefits and the aggregate costs of a P3 project against those of the traditional public alternative. In addition to the introductory chapter (Chapter 1), the report includes two separate sections: International Methodology and Practice and Methodology and Practice in the United States. The report is a state-of-the practice document. FHWA does not recommend any single approach to analyzing procurement options. FHWA does highly encourage that state practitioners consider some type of analysis when considering P3 procurement options.
PDF Version [pdf 713 kb]

Introduction to Public-Private Partnerships (P3s) P3
This presentation prepared by OIPD P3 specialists provides definitions of common P3 terminology, information of the benefits and challenges associated with P3 projects, examples of different types of P3 projects and a review of the financing tools that may be used with P3 project. The intent of the presentation is to:

  • Explain what P3s are and how they can play a part in project procurement
  • Identify instances where different P3 arrangements have been used for highway projects
  • Understand the benefits of P3s and challenges to their use
    • Identify key USDOT project finance tools that work in conjunction with P3s and be able to access resources to learn more

Presentation PDF Version [pdf 875 kb]
Read Transcript
Listen to Webinar

Advanced Public-Private Partnerships (P3s) Training P3
The Office of Innovative Program Delivery hosted an Advanced Public-Private Partnerships (201 level) webinar that focused on questions from the Colorado DOT with regards to specific issues related to public-private partnerships for High-Occupancy Toll (HOT) lanes. Experts from states that have successfully implemented public-private partnership agreements discussed their experiences and how they have addressed the issues. The webinar is intended for transportation professionals who already have a basic understanding of public-private partnerships.

Presentation PDF Version [pdf 1.7 MB]
Read Transcript
Listen to Webinar
Q&A Information

P3 Primer: An Update on the Burgeoning Private sector role in U.S. highway and Transit Infrastructure P3
This 2008 report describes the use of PPPs by state and local transportation authorities over the recent past and provides an update of USDOT's 2004 Report to Congress on PPPs (the "2004 Report"). The primary purposes of the P3 Primer are: (i) to explore the growing use of PPPs by state and local transportation authorities, and (ii) to identify the advantages and disadvantages of PPPs as an alternative to traditional approaches to transportation funding and procurement. The substance of this report is set forth in Sections III through VI. Section III defines PPPs and describes their benefits. While the 2004 Report provided a broad definition of PPPs, this report refines and focuses that definition to reflect the increasing utilization in the United States of long-term, concession-based PPPs, a subset of PPPs which have become significantly more prevalent since the 2004 Report was delivered. This section of the report then briefly describes the benefits of PPPs that have been used in the United States and abroad, which were described in greater detail in the 2004 Report. Section IV explores the use of long-term, concession-based PPPs in the United States while Section V describes the advantages of PPPs as an alternative to the failings of traditional approaches to project funding and delivery. Section VI identifies certain risks commonly attributed to PPPs and how they can be managed and evaluated.

Public Policy Considerations in Public-Private Partnership (PPP) Arrangements P3
This 2009 FHWA report is intended to help frame public policy considerations in public-private partnership (PPP) arrangements. State legislatures and public officials have taken these considerations into account in PPPs. Each state's approach, however, varies depending on a number of factors, including the public sector's policy objectives, the interests of the users, the characteristics of the project and specific risk factors. This report examines how different states have responded to the issues most frequently raised by examining provisions in state law and PPP agreements. The report identifies and addresses 14 public policy issues related to PPPs, based on a review of Congressional and state legislative hearings, publications, and discussions with key federal, state and local decision makers. Each issue is addressed in a separate section that includes (i) analyses of how state transportation departments and other public authorities have addressed the public policy considerations in those areas and (ii) charts detailing legislative and contract provisions that have been used. The findings of the report are based upon the review of PPP agreements for several recent and ongoing partnership projects.

P3 Workshops P3
During 2003 and 2004 the Federal Highway Administration (FHWA), in cooperation with the Office of the Secretary of Transportation, sponsored a series of workshops on the topic of public- private partnerships (P3s) and their applicability to the nation's highway development program. The P3 workshops were designed to educate transportation decision-makers in state and local legislatures and transportation agencies about P3s and their potential to help leverage scarce public resources to address urgent transportation facility needs. An initial mini-workshop was held in Washington, D.C. as part of the 15th anniversary celebration of the redevelopment of Union Station as one of the nation's premier public-private partnerships. This was following by six P3 workshops in Washington/Oregon, Minnesota, Texas, Florida, California, and North Carolina.

User Guidebook on Implementing Public-Private Partnerships for Transportation infrastructure Projects in the United States. [pdf 4.46 MB] P3
This Guidebook is intended to assist sponsors and providers of transportation projects take the necessary steps and precautions to promote the successful delivery of P3 project while protecting the public interest, especially the ultimate users of facilities so developed.

Case Studies of Transportation Public-Private Partnership in the United States [pdf 7.13 MB] P3
This report focuses on P3 applications to transportation projects in the United States. It promotes greater understanding of the role of institutional factors in the implementation of P3s.

Case Studies of Transportation Public-Private Partnership around the WorldP3
This report focuses on P3 applications to transportation projects in England, Australia, New Zealand, Hong Kong, India, Israel, Denmark, Sweden and Argentina, and provides an overview of variety of projects and approaches used to implement P3s around the world.

FHWA Manual for Using P3s on Highway Projects [pdf 335 kb]Project DeliveryProject FinanceP3
Issued in November 2005, this manual is intended to provide a one-stop resource for States interested in pursuing Public-Private Partnerships and curious as to how Federal requirements apply. Although a summary document itself, it identifies links and references that will provide access to more detailed guidance for anyone interested in exploring a Public-Private Partnership.

Synthesis of Public-Private Partnership Projects for Roads Bridges & Tunnels from Around the World - 1985-2004 P3
This August 2005 report presents a synthesis of a comprehensive database of highway infrastructure projects from around the world financed or delivered through some form of public-private partnership (P3). This synthesis provides insights into the nature and extent of highway infrastructure projects that have and are being advanced through various types of P3 contractual arrangements. They also reveal the predominant types and sizes of P3 contracts used in various regions and countries around the world for developing different types of highway infrastructure, including roads, bridges, and tunnels. The results of this synthesis are intended to inform those involved in the development, funding, or delivery of highway infrastructure regarding the worldwide use of P3s to delivery highway and other forms of public use infrastructure.

FHWA Report to Congress on P3s Project FinanceP3
This report, issued in December 2004 by U.S. DOT, answers the questions posed by Congress and attempts to provide a resource document for States interested in using public-private partnerships as a method of procurement. The report is divided into five major sections: history and initiatives, value of public-private partnerships, impediments to their formation, stakeholder comments, and recommendations for removing those impediments. The value section is designed to help States considering public-private partnerships better understand the benefits of such an approach and some of the downsides. This report, however, is not designed to be a manual on how to use public-private partnerships as part of a State program. We have not addressed the myriad issues concerning when public-private partnerships should be used and how they should be negotiated. The report focuses on the questions posed by the House Report language and provides the background necessary to provide context for the answers to those questions.

FHWA Office of International Programs: Contract Administration: Technology and Practice in Europe Project FinanceP3
In June 2001, a team comprised of Federal, State, contracting, legal, and academic representatives traveled to Portugal, the Netherlands, France, and England. Their mission was to investigate and document alternative contract administration procedures for possible implementation in the United States.

The scan team discovered that European highway agencies appear to be better at exploiting the efficiencies and resources that the private sector offers, through the use of innovative financing, alternative contracting techniques, design-build, concessions, performance contracting, and active asset management. European agencies have created contracts that focus on the users, while seeking to allocate risk appropriately and establish an atmosphere of trust in the implementation of procedures. The United States can directly and immediately employ many European procedures to help cope with its most urgent transportation needs. The report discusses these European techniques in terms of procurement, contract types, and payment mechanisms.

The report addresses the following subjects: best-value selection, performance specifications, design-build, shadow tolls, public-private partnerships, concessions, and design-build-operate-maintain.

Public-Private Partnerships for Highway Infrastructure: Capitalizing on International Experience P3
FHWA, AASHTO, and NCHRP sponsored a scanning study to collect information about P3 programs for highway infrastructure in Australia, Portugal, Spain, and the United Kingdom, where P3 experience is more extensive. In this publication, the scan team reports that P3s are an effective strategy for delivering highway projects, and they are service arrangements as much as financial ones. The team observed that potential P3 projects must be analyzed and structured thoughtfully to preserve public interests and that managing the partnership over the life of the contract is critical to providing the services expected. Team recommendations for U.S. implementation include convening workshops, developing training guidelines, establishing an expert task group, developing a research strategy, and publishing principles and guideline documents on P3 topics.

FHWA Innovative Finance Quarterly Project FinanceP3TIFIA
This quarterly newsletter, published by FHWA, provides information on the latest developments in Federally-sponsored innovative finance programs, such as TIFIA, GARVEE Bonds, and SIB transactions. It also features descriptions of innovative projects and programs of interest launched by state DOTs around the country. The newsletter also tracks legislative changes. Copies of all issues of the Quarterly dating back to 1997 are available on the FHWA Innovative Finance website, together with copies of FHWA's earlier Innovative Finance Newsletter.

Current Toll Road Activity in the U.S.A. Survey and Analysis [pdf 373 kb]P3Tolling and Pricing
This white paper summarizes current toll road activity in the U.S. through 2008 including an analysis of existing toll facilities constructed since ISTEA, as well as those currently being planned, designed, or constructed.

FHWA Financing Freight Infrastructure GuidebookProject FinanceP3
This guidebook developed by FHWA's Office of Freight Management and Operations and Office of Planning provides information on funding financing tools available for freight improvements and case studies of freight financing. Private sector options for financing freight needs are presented and noted among the case studies were relevant.

FTA P3 Resources

FTA Public-Private Partnership Pilot Program (Penta-P) P3
The Public-Private Partnership Pilot Program, known as Penta-P, was authorized SAFTEA-LU for certain new "fixed guideway capital projects," meaning public transit systems that use rail or a dedicated road, such as a bus rapid transit system. The pilot program will allow USDOT to study whether public-private partnership projects speed completion, allow more reliable projections of project costs and benefits, and improve project performance. The pilot will study projects that, among other things, use methods of procurement that integrate risk-sharing and streamline project development, engineering, construction, operation, and maintenance. The amount and terms of private investment in such projects is a significant factor in selecting projects to participate in the program.

Federal P3 Resources

Report to Congress on the Costs, Benefits, and Efficiencies of Public-Private Partnerships for Fixed Guideway Capital Projects [pdf 4 MB] P3
This report responds to a SAFETEA-LU requirement and is intended to identify and examine the costs, benefits, and efficiencies of applying P3 delivery approaches to transit projects.

Foundation P3 Resources

Protecting the Public Interest: The Role of Long-Term concession Agreements for Providing Transportation Infrastructure P3
USC Keston Institute for Public Finance and Infrastructure Policy
Written by Jeffrey Buxbaum and Iris Ortiz of Cambridge Systematics, Inc. this paper explores the confusion and controversy surrounding long-term concession agreements has come about because they have been promoted as silver bullets, as essentially free money provided by the private sector that will not require new taxes or fees. But users of the facilities will have to pay, and how users pay will be very different from how they have paid in the past. These new models may in fact prove to be more equitable and efficient than the old methods, but the negative reaction in some quarters to the initial agreements highlights the need for careful analysis and transparency going forward. The report explores the recent long term lease transactions of the Chicago Skyway, Indiana Toll Road and other potential transactions in those two states as well as Texas, Virginia and other domestic locations. The report identifies a number of potential strategies to address public concerns regarding public sector decision making including, conflicts of interest between the public and private sectors, and how contract terms can affect price levels and pubic control.

Driven by Dollars: What States Should Know When Considering Public-Private Partnerships to Fund Transportation P3
Pew Center on the States
This report analyzes Pennsylvania's unsuccessful effort in 2008 to lease the Pennsylvania Turnpike to private investors. The report provides valuable lessons for other cash-strapped states seeking to fund their highways and bridges. It identifies the information states need and the issues they should deliberate when exploring P3s to fund infrastructure improvements.

According to the report, states considering public-private partnerships should have clear, data-driven answers to questions in the following four categories: (1) Examining the Options - the Decision-Making Process; (2) Let's Make a Deal - the Deal-Making Process; (3) Show Me the Money - Financial Analysis; and (4) Who Will Mind the Store? Oversight and Service Provision.

How States and Territories Fund Transportation: An Overview of Traditional and Nontraditional Strategies Project FinanceP3Tolling and Pricing
National Governors Association Center for Best Practices
This report is designed to provide states with an overview of traditional funding mechanisms, profiles of new and innovative programs at work in the United States and overseas, and a summary of each state's surface transportation funding approaches. The report covers state-driven mechanisms only and is meant to help states identify strategies to consider in addressing their revenue needs alongside federal and local approaches. P3s are discussed among the nontraditional and innovative financing mechanisms, and the report highlights which states are authorizes and have used P3s or surface transportation projects.

Innovative State Transportation Funding and Financing: Policy Options for States Project FinanceP3Tolling and Pricing
National Governors Association Center for Best Practices
This paper presents the basic state policy options for funding transportation and outlines recent innovations by: (1) providing case studies of state and international experience with a full range of policy options; (2) addressing new options that have emerged; (3) summarizing new developments in P3s; and (4) detailing financing options, such as congestion pricing, which establish a price signal to users that can both raise revenue and encourage more efficient use of the transportation infrastructure. Each chapter provides a description of a different type of innovative financing or funding approach or ways to address demand; best practices from the United States and abroad; and additional considerations for states that are considering these options. Chapter 6 deals with the recent interest in P3s by discussing innovative procurement, design-build strategies, concession agreements, and other ideas.

Reason Foundation Annual Privatization Report 2009Project DeliveryProject FinanceP3Tolling and Pricing
Reason Foundation
Reason Foundation's 23rd Annual Privatization Report details the latest trends and examples of how public officials are reducing costs and improving service delivery through public-private partnerships, outsourcing, and performance-based government. The surface transportation component of the report contains information on new P3 toll roads, the leasing of existing toll roads, HOT/managed lane projects underway, overseas concession projects, and a look at China's growing effect on private capital.

GAO and CBO P3 Resources

Highway Public-Private Partnerships: More Rigorous Up-front Analysis Could Better Secure Potential Benefits and Protect the Public InterestP3
In producing this report, GAO was asked to review: (1) the benefits, costs, and trade-offs of public-private partnerships; (2) how public officials have identified and acted to protect the public interest in these arrangements; and (3) the federal role in public-private partnerships and potential changes in this role. As input into the study, GAO reviewed federal legislation, interviewed federal, state, and other officials, and reviewed the experience of Australia, Canada, and Spain. GAO's work focused on highway-related P3s and did not review all forms of public-private partnerships. GAO recommends that Congress consider directing the Secretary of Transportation, in consultation with Congress and other stakeholders, to develop objective criteria for identifying potential national public interests in highway P3s.

Using Public-Private Partnerships to Carry Out Highway ProjectsP3
This Congressional Budget Office study was prepared at the request of the Chairman of the Senate Budget Committee and focuses on the following questions: (1) What are public-private partnerships and how often are they used? (2) Does private financing increase the resources available to build, operate, and maintain roads? (3) Do public-private partnerships build roads more quickly or at a lower cost? The report finds that private financing will increase the availability of funds for highway construction only in cases in which states or localities have chosen to restrict their spending by imposing legal constraints or budgetary limits on themselves. The reason is that revenues from the users of roads and from taxpayers are the ultimate source of money for highways, regardless of the financing mechanism chosen. On the basis of evidence from a small number of studies, such partnerships have built highways slightly less expensively and slightly more quickly, compared with the traditional public-sector approach.

Industry Journals and Periodicals

Public Works FinancingProject DeliveryProject FinanceP3TIFIATolling and Pricing
Public Works Financing newsletter's specific focus since 1988 has been on public-private partnerships in infrastructure finance. Its experienced editorial staff provides projects leads, detailed project case studies, news analysis, business and political trends, plus a directory of 36 of the industry's most experienced consultants. In addition to monthly issues, PWF publishes a database each October of over 2,200 P3 projects that are planned, being built or operating around the world.

Infrastructure Journal Project DeliveryProject FinanceP3Tolling and Pricing
Infrastructure Journal is a British publication and website dedicated to P3s across all sectors. Infrastructure Journal also prepares P3 case studies and organizes conferences. It is an international forum with 29% of its reader distribution in Europe, 17% in Asia, 31% in North America, 18% in Latin America, and 5% in the Middle East and Africa. Its readership includes public officials, lawyers, consultants, contractors, commercial lenders, multilateral and bilateral lenders, development agencies, and project sponsors and developers.

Innovation Briefs Project DeliveryProject FinanceP3TIFIATolling and Pricing
Over the past twenty years INNOVATION BRIEFS have become "must reading" for thousands of legislators, public officials, business leaders, newspaper editors and transportation professionals. The Briefs' critical commentaries and incisive analysis of current events keep readers in touch with trends and ideas in the transportation world without subjecting them to an information overload. Its editorial policy is to maintain an independence of views, while striving to remain balanced and objective in its coverage. Innovation Briefs are published by C. Kenneth Orski, a public policy consultant and former principal of the Urban Mobility Corporation.

The Bond BuyerProject DeliveryProject FinanceP3TIFIATolling and Pricing
The Bond Buyer is the definitive source of up-to-date information on bond offerings in the United States . It is available by subscription only, in both on-line and paper format. The paper is updated daily.

Project Finance MagazineProject DeliveryProject FinanceP3Tolling and Pricing
Project Finance provides strategic information, news, and forecasts and trend analysis on the project finance markets. It contains features on countries, infrastructure surveys by region and sector, and agency and development bank news. It offers periodic industry- and region-specific special issues and maintains a team of 22 journalists who track current developments around the world.

TOLLROADSnewsProject FinanceP3Tolling and Pricing
TOLLROADSnews, a publication specializing in tolling, describes this emerging service business and documents the debates and controversies. It provides descriptions of new toll projects around the world, analysis of political, legal, and economic problems of toll projects, information on toll technologies, and reports on ongoing operations of toll agencies and projects.

Wall Street Journal
Published by Dow Jones & Company, Inc., the Wall Street Journal is one of the most respected daily financial newspapers in the world. It carries information on all aspects of finance and is used as a reference by nearly all financiers.

Engineering News Record (ENR)
ENR, the weekly engineering industry magazine, has online access. Recent articles are listed by topic, such as transportation or finance. The site also provides up to date construction pricing information, indicating recent cost trends for key construction materials.

AASHTO JournalProject DeliveryProject FinanceP3TIFIATolling and Pricing
American Association of State Highway Transportation Officials (AASHTO) Journal is a weekly publication that covers legislative and regulatory news on transportation. The AASHTO site search engine references previous volumes of the journal but without specific article references.

International P3 Resources

Australia P3 Resources

NSW Parliamentary Inquiry into Public-Private Partnerships (2006)P3
The purpose of this inquiry was to assess whether P3s are being managed efficiently and effectively, not whether or not they should be used. It compared Australian institutional arrangements with national and international best practice. The inquiry found that Government guidelines for P3s were open to interpretation and were not being applied consistently, that conditions which led to P3 arrangements were seen as less than transparent, and that there needs to be more of a focus on the ongoing evaluation and monitoring of projects over their whole life. The inquiry examined ways in which knowledge sharing about the development and operation of P3s can be improved, to increase the level of P3 management expertise across the public sector and thus increase value for money.

Partnerships VictoriaP3
The Partnerships Victoria policy, introduced in 2000, provides the framework for a whole-of-government approach to the provision of public infrastructure and related ancillary services through public-private partnerships. There are 19 Partnerships Victoria projects in existence worth around $9.5 billion in capital investment.

Canada P3 Resources

Infrastructure Canada (Building Canada)P3
Infrastructure Canada was established as a department in August 2002. Since then, the department, among other things, has worked to provide a focal point for the Government of Canada on infrastructure issues and programs through the Building Canada plan, a historic $33 billion infrastructure plan. Under Building Canada, the nation's most important economic and environmental priorities are being addressed through targeted and based-funding programs. One of these programs is the $1.25 billion P3 Fund. This fund will support innovative projects that provide an alternative to traditional government infrastructure procurement. A new federal P3 office will also be established.

Partnerships British ColumbiaP3
Partnerships British Columbia is a company responsible for bringing together ministries, agencies and the private sector to develop projects through public-private partnerships. As a company registered under the Business Corporations Act, Partnerships BC is wholly owned by the Province of British Columbia and reports to its shareholder the Minister of Finance.

P3 Council of CanadaP3
The Canadian Council for Public-Private Partnerships was established in 1993 as a member-sponsored organization with representatives from both the public and the private sectors. As proponents of the concept of P3s, the Council conducts research, publishes findings, facilitates forums for discussion and sponsors an Annual Conference on topics related to P3s, both domestic and international.

Conference Board of Canada Steering a Tricky Course: Effective Public-Private Partnerships for the Provision of Transportation Infrastructure and ServicesP3
This study asks the question: what are the factors that make for successful P3s? To help answer it, the study offers three case studies, two in Canada and one in the U.K. The Confederation Bridge P3 (linking Prince Edward Island to New Brunswick) shows that project risks can be successfully transferred to the private sector and underscores the importance of having the procurement authority adapt its role to the requirements of a P3. The London Underground P3s demonstrate the use of innovative output-based performance measures, but they also show that significant uncertainty about major costs (such as upgrades to legacy assets) can impair the effectiveness of risk transfer to the private sector. As well, these P3s suggest that governments should be cautious about imposing P3 delivery methods on lower levels of government. Finally, the Montreal metro project, which was not a P3, provides insights on the importance of thorough project planning and the value of extensive due diligence.

European Union P3 Resources

Guidelines for Successful Public-Private PartnershipsP3
This document was designed as a practical tool for P3 practitioners in the public sector faced with the opportunity of structuring a P3 and of integrating or "blending" European Communities grant financing in P3s. The report is to focus on a number of critical issues influencing the successful integration of public grants, private funds, IFI loans (such as the EIB or EBRD) and European Commission financing. Reference is made to a number of analytical techniques which are well known and documented. These are not presented with the objective of promoting a standard methodology but rather in an attempt to highlight areas in which particular care and analysis needs to be observed. The Guidelines are not designed to provide an exhaustive list of P3 structures nor present any structures as having the endorsement of the Commission. The Guidelines present five thematic parts dealing in turn with:

  • P3 structures, suitability and success factors

  • Legal and regulatory structures

  • Financial and economic Implications of P3s

  • Integrating grant financing and P3 objectives

  • Conception, planning and implementation of P3s

Resource Book on P3 Case StudiesP3
The growing interest in the development of P3's was confirmed by the request, put forward by representatives of Candidate Countries, to complement the Guidelines with examples of actual projects in order to better understand the practical implementation issues. Following this request, the Commission has developed this Resource Book, consisting of a set of case studies of P3s in both Western and Central Europe and in various sectors including: Water and Wastewater Management, Solid Waste Management and Transport. These sectors are representative of those in which the Commission has provided grant financing. While they are not the only sectors in which P3 principles are being applied, they do provide a balance between sectors with a considerable history of P3 application such as transport and those in which it is relatively new and encountering specific issues.

Private finance of transport infrastructure projects Value and risk analysis of a Finnish shadow toll road project P3Tolling and Pricing
Pekka Leviakangas
This dissertation investigates the characteristics of a feasible framework for private finance of road infrastructure projects using one case project as an aid, which is analyzed in depth. The research makes an effort to find out whether private finance of road infrastructure projects is able to bring additional benefits for the state and the project investors and whether private finance is applicable from their viewpoints.

Private Finance Initiative: strengthening long-term partnerships P3
United Kingdom Treasury
This publication builds on measures introduced since 2003 that explain the UK's approach to its Private Finance Initiative (PFI) program, setting out further improvements to PFI to support its ongoing important role in delivering better public services. The Government sees PFI continuing to play a small but important role in the overall objective of delivering modernized public services. It will continue to be used only where it can demonstrate value for money and is likely to continue to comprise around 10-15 percent of total investment in public services.

Ireland, Central Public-Private Partnership Unit of the Department of FinanceP3
The Central Public-Private Partnerships Policy Unit in the Department of Finance was established to provide optimum support for the development of the P3 process. The key function of this unit is to develop the legislative framework, technical and policy guidance to support the P3 process and to disseminate best practice in P3s.

Partnerships UKP3
Partnerships UK is a joint venture that acts as a public-private partnership developer, working in partnership with public bodies.

Scotland Futures Trust P3
The Scottish Futures Trust is a Government-owned company set up to improve public infrastructure investment. Established in September 2008, SFT pursues value for money by operating across the whole public sector and by delivering benefits and savings wherever possible at each point in the infrastructure investment cycle. From needs identification, options investigation and investment appraisal; through financing, procurement, design and construction; to life cycle management, maintenance and disposal, the SFT offers value and professional expertise.

Organization for Economic Co-Operation and Development (OECD)

Transport Infrastructure Investment: Options for EfficiencyP3
Summary PDF Version [pdf 156 kb]
Full Report PDF Version [pdf 1.37 MB]

This OECD report examines principles for determining the most appropriate models for investment in surface transport infrastructure. Public-private partnerships (P3s) have attracted much attention in recent years. Appropriately designed, P3s have the potential to allow for important efficiency gains by transferring the responsibility for long-term cost management to private organizations that are intrinsically motivated to reduce overall costs in pursuit of profits, including by way of innovation. But P3s are complex arrangements, with many pitfalls. Much surface transport infrastructure does not lend itself to P3s, so the true role for these instruments in the overall system has to be carefully defined. Governments are faced with a complicated set of options for investing in infrastructure. In all likelihood, different elements of the surface transport system will employ different models, including various degrees of user charging. One of the greatest challenges is in ensuring consistency across the system.

This report begins in Part I with a discussion of the overall challenge of providing surface transport infrastructure, including a description of the available models. It also provides an overview of the current situation observed around the world. Part II discusses the fundamental question of how borrowing for the creation of surface transport infrastructure should be treated in public accounts. Part III considers the potential benefits of using different models for the provision of infrastructure. Part IV looks at key questions related to the design of P3s, particularly their legal and regulatory frameworks and procurement processes. The report is based on research by a working group of experts from 19 countries, chaired by Dr. Urban Karlström, Director General of the Swedish National Road and Transport Research Institute.

United Nations P3 Resources

2007 Guidebook on Promoting Good Governance in Public-Private PartnershipsP3
Prepared by the Public-Private Partnership (P3) Alliance of the United Nations Economic Commission for Europe (UNECE), this Guidebook promotes good governance in the use of P3s and is designed to support P3 capacity-building programs especially in the transition economies. The P3 Alliance was established in 2001 to improve the awareness, capacity and skills of the public sector in developing successful P3s in Europe. To this end, the Alliance prepares guidelines on best practices in P3s, as well as preparing other P3-related educational and training materials, and sponsoring P3 conferences and workshops. The Guidelines were reviewed at an International Conference organized by UNECE and the Government of Israel with the participation of experts from different countries to provide their experience and best practice in creating good governance conditions for P3s. A network of experts has also been established, incorporating the experts from the former Alliance group, to implement a work program on P3s.

United Nations Economic and Social Commission for Asia and the Pacific P3
The United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) is the regional development arm of the United Nations for the Asia-Pacific region. With a membership of 62 Governments, 58 of which are in the region, and a geographical scope that stretches from Turkey in the west to the Pacific island nation of Kiribati in the east, and from the Russian Federation in the north to New Zealand in the south, ESCAP is the most comprehensive of the United Nations five regional commissions. Its Transport Division works with member countries, including the public and private sector stakeholders to help them to optimize and manage the opportunities brought by the deepening of globalization. The division comprises three sections: Transport Infrastructure Section, Transport Facilitation Section, and the Transport Policy and Development Section. The Transport Policy and Development Section is, among other things, responsible for the division's work on financing infrastructure and public-private partnerships for infrastructure development.

P3 Books

Achieving Public-Private Partnership in the Transport SectorP3
This is the first volume in a series sponsored by the Diebold Institute for Public Policy Studies. The book reviews the history of transport partnerships around the world and provides detailed case studies of three recent partnership projects:

  • The M1/M15 Motorway in Western Hungary, a 56.3-kilometer, US $330 million facility;

  • The Vasco da Gama Bridge, a 12.3-kilometer, US $1.0 billion bridge in Lisbon, Portugal

  • The Bangkok Mass Transit System, a 23.7-kilometer, US $1.5 billion elevated rail mass transit system in the Thai capital

Research for the book has been assembled through interviews with financial advisers, bankers, construction companies, investors, government officials, development banks, academicians, and journalists, together with the review of primary project documents and other written materials.

Representing a case of failure, a case of success, and one whose fate has not yet been determined, the cases offer rich comparisons. They have been shaped by differing cultural expectations and economic conditions. They have also benefited from the commitment of creative supporters and been subjected to changing political winds.

International Project FinancingProject FinanceP3
This book deals with the legal issues encountered when negotiating and drafting agreements relating to project finance, and is designed for general use throughout the world rather than any particular country. The book is printed in loose-leaf form and is updated annually. It provides a chapter-by-chapter analysis and discussion of the different issues involved in project finance, together with contract forms that represent a collection of documents used around the world.

Going Private: The International Experience with Transport PrivatizationP3
Going Private examines the diverse privatization experiences of transportation services and facilities. Cases are drawn from the United States, Asia, Europe, and Latin America. Since almost every country has experimented to some degree with highway and bus privatization, the authors focus particularly on these services, although they also discuss urban rail transit and airports. Highways and buses, they explain, encompass all three of the most common and basic forms of privatization: The sale of an existing state-owned enterprise; use of private, rather than public, financing and management for new infrastructure development; and contracting out to private vendors public services previously provided by government employees.

P3 Links

Rating Agency P3 Resources

Public-Private Partnerships: the Next Generation of Infrastructure FinanceP3
Fitch Ratings
Prepared by FITCH, this technical paper investigates infrastructure requirements in developed and developing nations and finds that they are beginning to exceed available financing resources. This funding gap has lead to widespread acceptance that the private sector, in partnership with the public sector, might have to play a larger role in infrastructure financing. This role could be active - in the form of project sponsorship - or passive - in the form of an institutional bond investor. This paper sees more promise in the latter role. A 'new generation' of public-private partnerships (P3s) is described, wherein project credit risk is pooled through infrastructure banks and layers of credit enhancement are added to engage domestic debt markets. The role of the private sector in such arrangements is to act as the financial engineers, creating enhanced investment vehicles and stimulating the efficient use of capital. For such partnerships to truly succeed, host countries will need to promote a relatively stable macroeconomic environment, develop a legal and regulatory framework for infrastructure projects, and foster the development of a domestic debt market. Until such conditions have been achieved, multilateral and development banks will still have a significant role to play in project financing.

Global Toll Road Rating GuidelinesTolling and Pricing
Fitch Ratings
These guidelines are intended to cover the broad spectrum of permutations in toll road types and management structures. The report describes Fitch's view in more detail and guides readers through the analytical framework used in assessing the credit quality of various types of toll roads and financing structures.

State DOT P3 Resources

Current Practices in Public-Private Partnerships for Highway Projects Project DeliveryP3Tolling and Pricing
States throughout the country face serious gaps between the level of highway services demanded by citizens and businesses and the funding available to finance, construct, operate and maintain the highway system. The needed improvements would provide substantial economic benefits to the traveling public - both to citizens of the sponsoring states and to the residents and businesses traveling through these states to other destination.

The State of Maryland is exploring the potential to expand the use of public-private partnerships (P3) to deliver highway projects. Maryland has enjoyed success using the "design-build" model of P3 in several highway projects. That model would be expanded to larger projects and could encompass a broader range of project activities including the financing, planning, design, construction, operation and maintenance of highways.

Issued in July 2005, this report reviews transportation P3 initiatives throughout the US in order to gain a broad understanding of the challenges and obstacles associated with such programs. The information used in the review came from two concurrent research efforts conducted by staff from the Maryland Transportation Authority, Maryland DOT State Highway Administration, FHWA, and KCI Technologies (the Maryland P3 Team) in 2004.

TRB P3 Resources

NCHRP Synthesis 391: Public Sector Decision Making for Public-Private Partnerships P3
This synthesis examines the information available in the United States and internationally that is needed to properly evaluate the benefits and risks associated with allowing the private sector to have a greater role in the financing and development of highway infrastructure, and how that information can be used in the decision-making process. The synthesis also includes the results of two surveys. The first survey examined state DOTs, the District of Columbia, Puerto Rico, and 13 Canadian provinces. A second survey of interested parties was taken by 24 individuals who were identified by the authors and the topic panel, and had been publicized at the 2008 Annual Meeting of TRB.

The numerous topics of interest related to P3 decision-making were divided into three major categories: (1) project selection and delivery; (2) transparency; and (3) terms of P3 agreements.

Three major themes emerged from the research and surveys:

  1. How might governments decide whether or not to pursue a P3? Issues to consider include: the valuation of alternative approaches; appropriate risk transfer; transparency and public participation; and the unavoidable complexity of transactions.

  2. How might the public interest be protected? It is important to ensure that the private sector has the proper motivations to protect the public interest, while allowing investors to meet a return on the investment that is in line with the risk they take. Considerations include appropriate use of revenues, maintaining environmental standards, maintaining fair labor practices, and ensuring that the private sector meets safety, maintenance, and other standards specified by contract.

  3. Misperceptions about P3s can be a distraction from the real issues. Three identified misperceptions that require public education include: non-compete clauses are always part of P3s with a long-term lease component; a P3 is a synonym for tolls and with that toll increases are inevitable, resulting in windfall profits; and the public sector loses total control of the facility.

World Bank P3 Resources

World Bank Private Participation in Infrastructure (PPI) Database P3
The Private Participation in Infrastructure (PPI) Project Database has data on more than 4,100 projects in 141 low- and middle-income countries. The database is the leading source of PPI trends in the developing world, covering projects in the energy, telecommunications, transport, and water and sewerage sectors.

World Bank Policy Research Working Paper 3356: Where Do We Stand on Transport Infrastructure Deregulation and Public-Private Partnership?P3
The evolution of transport public-private partnerships (P3s) in developing and developed countries since the early 1990s seems to be following a similar path: private initiatives work for a while but after a shock to the sector takes place the public sector returns as regulator, owner or financier; after a while the public sector runs into problems and eventually finds a hybrid solution to ensure the survival of the sector. This paper reviews the effectiveness of transport infrastructure deregulation from three angles: efficiency, fiscal and users' viewpoint. The paper emphasizes the difficulties and strong political commitments required to make the reforms sustainable and argues that governments willing to make corrections to the reform path are faced with the need to address recurrent and emerging issues in transport systems: tariff structure, quality (timetable, safety, environment), access rules for captive shippers, the trend toward rebundling and decrease in intrasectoral competition, multimodalism and the stimulus through yardstick competition.

World Bank Technical Paper No. 399, Concessions for Infrastructure: A Guide to Their Design and AwardP3
Concession arrangements entail a myriad of legal and economic issues, including the organization of government entities responsible for concession programs and the adequacy of the broader legal and regulatory environment. The design and implementation of concession contracts that allocate risks and responsibilities and the mechanisms for evaluating and awarding projects are also of paramount importance. The government's role as regulator and as a provider of support for infrastructure concessions must also be assessed. While some countries have established extensive concession programs, others are just beginning to develop these programs. This report provides a guide to the complex range of issues and options involved in the implementation of concession arrangements, drawing on the experience of both industrial and developing countries.

Seminar Proceedings for Asian Toll Road Development in an Era of Financial Crisis P3
This seminar was held from 9-11 March 1999 at the Tokyo International Forum in Tokyo, Japan. It brought together a wide range of leaders, decision-makers, academics, and other influential people related to toll road development, totaling 340 persons from 17 countries. The Seminar featured 18 individual speeches and presentations, as well as a comprehensive panel discussion on the last day. Seminar speakers and panelists included MOCJ and World Bank officials, foreign government representatives, academic experts from Japan and abroad, public and private sector toll road developers and operators, and specialists in the areas of toll road finance, regulation, and legal issues.

The Seminar Proceedings comprise three volumes. Volume I contains an introductory Section and eight others, one for each of the Seminar Sessions. Volume II contains background information on the seminar and its participants. Volume III contains Appendix G, a report entitled "Review of Recent Toll Road Experience in Selected Countries," which served as the Seminar Resource Report and was given to all Seminar attendees.

Public Policy for the Private Sector 258: Unsolicited Proposals: John Hodges Competitive Solutions for Private InfrastructureP3
This Paper looks at systems used by some governments transform unsolicited proposals for private infrastructure projects into competitively tendered projects. It focuses on the policies that Chile, the Republic of Korea, the Philippines, and South Africa have adopted for managing such proposals. A companion discussion explores the problems associated with unsolicited proposals, especially the risks they raise for competition and transparency.

Granting and Renegotiating Infrastructure Concessions in Latin America: Doing it Right
J. Luis Guasch, World Bank Institute
P3
This title is the fifth in an occasional series by the World Bank Institute intended to help meet the knowledge and information needs of infrastructure reformers and regulators. The book breaks new ground in relation to the design and implementation of concession contracts by culling the lessons of experience from some 1,000 examples and assessing what these lessons mean for future practice.