Environmental Assessments | Environmental Impact Statements | Federal Register Notices |
Findings of No Significant Impact | Records of Decision | Plans & Reports | Biological Assessments & Opinions
Findings of No Significant Impact | Records of Decision | Plans & Reports | Biological Assessments & Opinions
- Environmental Assessment - Albuquerque Bernalillo County Water Utility Authority Southwestern Willow Flycatcher Habitat Restoration Project (February 2012)
- Environmental Assessment - Hancock-State Road Salinity Reduction Project Uintah and Duchesne Counties, Utah
(February 2012) - Final Environmental Assessment - South Canal Hydropower Project (February 2012)
- Environmental Assessment - Non-Native Fish Control Downstream from Glen Canyon Dam (December 2011)
- Environmental Assessment - Development and Implementation of a Protocol for High-Flow Experimental Releases from Glen Canyon Dam, Arizona, 2011 through 2020 (December 2011)
- Environmental Assessment - Farson/Eden Salinity Control Project Eden Canal, E-5 & E-6 Laterals Sweetwater County, Wyoming (December 2011)
- Environmental Assessment - Ouray Park Canal Salinity Control Project (December 2011)
- Final Environmental Assessment - Ridgway Dam Hydropower Project (December 2011)
- Final Environmental Assessment - San Juan-Chama Project Repayment Contracts, Taos Pueblo Indian Water Rights Settlement Act (November 2011)
- Draft Environmental Assessment - Integrated Pest Management on San Juan-Chama Project; Colorado and New Mexico (October 201)
- Final Environmental Assessment - Jordanelle Reservoir Draft Resource Management Plan (September 2011)
- Final Environmental Assessment - Rifle Creek Fish Screen Project (July 2011)
- Final Environmental Assessment - Parallel Pipeline Project (March 2011)
- Final Environmental Assessment - Brantley and Avalon Reservoirs Resource Mgmt Plan Amendment (February 2011)
- Environmental Assessment - Eastern New Mexico Rural Water System (January 2011)
- Draft Environmental Assessment - Ciénega Wetland Rehabiliation at Phantom Lake Spring,Toyavale, TX (Jan. 2011)
- 2011 - 2016 Supplement to the Rio Grande Supplemental Water Programmatic Draft Environmental Assessment (December 2010)
- Enviornmental Assessment - Farson/Eden Salinity Control Project E-7, E-8, and Westside Laterals Sweetwater County, Wyoming (December 2010)
- Final Environmental Assessment - Fontenelle Community Renovation, Seedskadee Project Lincoln County, Wyoming
(July 15, 2010) - Final Environmental Assessment and Biological Assessment - Green River Pumping Plant Project (June 2010)
- Final Environmental Assessment - Cañon Drought Emergency Water Well (March 2010)
- Environmental Assessment - Water District No. 11 Bear River for Innovative Water Conservation Measures and American Recovery and Reinvestment Act of 2009 (March 2010)
- Draft Environmental Assessment - Eastern New Mexico Rural Water System (January 2010)
- Environmental Assessment - Huntington/Cleveland Salinity Control Project, Phase IV North Ditch Canal Enclosure (January 2010)
- Environmental Assessment - Carriage of Non-Project Water in the Provo Reservoir Canal (December 2009)
- Final Enviromental Assessment - Lone Pine Canal Salinity Control Project (December 2009)
- Environmental Assessment - Peoples Canal Salinity Control Project (December 2009)
- Environmental Assessment - Davis and Weber Counties Canal Company Improvement Project (December 2009)
- Draft Environmental Assessment - Albuquerque Bernalillo County Water Utility Authority Contract for Storage of San Juan-Chama Water in Elephant Butte Reservoir (December 2009)
- Environmental Assessment - Farson/Eden Salinity Control Project, Lateral E-13, Sweetwater County, WY
(December 2009) - Final Environmental Assessment - Regina Drought Emergency Water Well (December 2009)
- Final Environmental Assessment - Exchange of Real Property Between the United States Government and Provo City, Utah (November 2009)
- Final Environmental Assessment - Echo Dam, Weber River Project, Summit County, Utah, Proposed Safety of Dams Modification (September 2009)
- Final Environmental Assessment - Pueblo of Sandia Rio Grande Bosque Rehabilitation Project (September 2009)
- Final Environmental Assessment - East Canyon Reservoir Water Intake Structure (September 2009)
- Final Environmental Assessment - Pecos River Supplemental Water Project (August 2009)
- Final Environmental Assessment - Central Utah Project Completion Action Section 207 and Contributed Funds Act Funding for Provo Reservoir Canal Enclosure and Increased Capacity (July 2009)
- Final Environmental Assessment - Newton Reservoir Mineral Extraction (May 2009)
- Final Environmental Assessment - Water Service Contract between the United States and the Navajo Nation/Navajo Tribal Utility Authority (May 2009)
- Final Environmental Assessment - El Paso County Water Improvement District Number One, Canal, Structure, and Improvement Projects (May 2009)
- Final Environmental Assessment - Pecos River Channel Restoration at the Bitter Lake National Wildlife Refuge, Chaves County, New Mexico (January 2009)
- Draft Environmental Assessment - Brazos Drought Emergency Water Well Rio Arriba County, NM (December 2008)
- Draft Environmental Assessment - Integrated Pest Management, San Luis Valley Project, Alamosa Field Division, Colorado (November 2008)
- Draft Environmental Assessment - Middle Rio Grande Isleta Reach Riverine Restoration Project (November 2008)
- Draft Environmental Assessment - Drain Unit 7 Extension River Maintenance Priority Site (November 2008)
- Environmental Assessment - Escondida Drain Rehabilitation (October 2008)
- Environmental Assessment - Land Use Plan Westwater-Blanding Water Supply and Waste Disposal Facilities Water and Sewer Extension San Juan County, Utah (September 2008)
- Final Environmental Assessment - La Plata West Water Authority Intake Structure and Water Treatment Plant at Lake Nighthorse (September 2008)
- Environmental Assessment and FONSI - Red Bridge Water Reuse Project (July 2008)
- Final Enviromental Assessment Navajo Reservoir Area Resource Management Plan (June 2008)
- Environmental Assessment - Carriage of Non-Project Water in Emery County Project Facilities (June 2008)
- Draft Environmental Assessment - Drought Emergency Well for Eunice, New Mexico (June 2008)
- Draft Environmental Assessment - Drought Emergency Water Well for Hagerman, New Mexico (June 2008)
- Draft Environmental Assessment - Drought Emergency Water Well for Carlsbad, New Mexico (April 2008)
- Draft Environmental Assessment for El Paso County Riverside Canal and Structure Improvement Project (March 2008)
- Environmental Assessment - Santo Domingo Tribe - Endangered Species Habitat Improvement Project - Phase III (March 2008)
- Final Environmental Assessment - Experimental Releases from Glen Canyon Dam, Arizona, 2008 through 2012
(February 29, 2008) - Draft Environmental Assessment of River Mile 111 Priority Site Project (February 2008)
- Final Environmental Assessment - A.V. Watkins Dam Safety of Dams Modification (December 2007)
- Final Environmental Assessment - Steinaker Reservoir Normal Water Surface Elevation Increase (September 2007)
- Environmental Assessment - Pueblo of San Felipe Bosque Restoration Project (September 2007)
- Environmental Assessment - Perennial Rio Grande Silvery Minnow Refugia at Drain Outfalls (July 2007)
- Final Environmental Assessment - Long-Term Lease of Groundwater Rights, Pecos River near Ft. Sumner, New Mexico (July 2007)
- Environmental Assessment - Federal Rio Grande Project New Mexico-Texas Operating Procedures, Dona Ana, Sierra, and Socorro Counties, New Mexico and El Paso County, Texas (June 2007)
- Final Environmental Assessment - Santo Domingo Tribe - Endangered Species Habitat Improvement Project Phase II (April 2007)
- Environmental Assessment - Seven Rivers Pipeline, Pecos River, New Mexico (April 2007)
- Final Environmental Assessment - Rockport Reservoir (February 2006)
- Final Environmental Assessment - City of Albuquerque Habitat Restoration Project (February 2007)
- Final Environmental Assessment - Contract between the United States and the Pine River Irrigation District for the Use of Project Water for Miscellaneous Purposes (February 2007)
- Final Environmental Assessment - Huntington North Dam Outlet Works Modification and Carriage of Non-Project Water through Emery County Project Facilities (January 2007)
- Draft Environmental Assessment - Perennial Rio Grande Silvery Minnow Refugia at Drain Outfalls (November 2006)
- Draft Environmental Assessment - Middle Rio Grande Riverine Restoration Project Phase II (November 2006)
- Final Environmental Assessment - Tropic Ditch Replacement Project (October 2006)
- Draft Environmental Assessment - City of Albuquerque Habitat Restoration Project (October 2006)
- Final Environmental Assessment - Middle Rio Grande Project Sandia Priority Site (July 2006)
- Final Environmental Assessment - Middle Rio Grande Project Bernalillo Priority Site (July 2006)
- Environmental Assessment - San Juan–Chama Water Contract Amendments with City of Santa Fe, County of Santa Fe, County of Los Alamos, Town of Taos, Village of Taos Ski Valley, Village of Los Lunas, and City of Española (May 2006)
- Supplement to the Rio Grande Supplemental Water Programmatic Environmental Assessment (May 2006)
- Contract between the United States and the Pine River Irrigation District for the Use of Project Water for Miscellaneous Purposes (March 2006)
- Environmental Assessment - Santo Domingo Tribe - Habitat Restoration for the Endangered Rio Grande Silvery Minnow and Salt Cedar Removal Project (March 2006)
- Final Environmental Assessment - Middle Rio Grande Riverine Restoration Project (December 2005)
- Final Environmental Assessment - Proposed Safety of Dams Modifications and Bridge Reconstruction - Scofield Dam, Scofield Project (December 2005)
- Final Environmental Assessment - Rio Grande Silvery Minnow Sanctuary (November 2005)
- Draft Environmental Assessment - Espanola Dikes Cross-Drainage [Borregos Arroyo Project] (Nov. 2005)
- Final Environmental Assessment - Jicarilla Apache Nation Water Subcontract to the city of Santa Fe (October 2005)
- Environmental Assessment - Drought Relief Well at Taos Pueblo (August 2005)
- Final Environmental Assessment - Price Stubb Fish Passage (January 2005)
- RESPONSE TO PUBLIC COMMENTS - on Draft Supplemental Environmental Assessment - Proposed Experimental Actions For Water Years 2005-2006, Colorado River, Arizona, In Glen Canyon National Recreation Area And Grand Canyon National Park (November 2004)
- Draft Supplemental Environmental Assessment - Proposed Experimental Actions For Water Years 2005-2006 Colorado River, Arizona, In Glen Canyon National Recreation Area And Grand Canyon National Park (November 2004)
- Final Environmental Assessment - Title Transfer of Provo Reservoir Canal, Salt Lake Aqueduct, and Pleasant Grove Property - Provo River Project (October 2004)
- Draft Environmental Assessment - Vallecito Dam Road Relocation (October 2004)
- Draft Environmental Assessment - Title Transfer of Provo Reservoir Canal, Salt Lake Aqueduct, and Pleasant Grove Property (May 2004)
- Final Environmental Assessment - Victory Ranch River Restoration Project, Wasatch and Summit Counties, Utah (April 2004)
- Final Environmental Assessment - For Providing Fish Screening In The Redlands Power Canal (April 2004)
- Final Environmental Assessment - Floodplain Habitat Restoration At Thunder Ranch, Utah (April 2004)
- Final Environmental Assessment - Adoption Of An Interim 602(a) Storage Guideline (March 2004)
- Draft Environmental Assessment - Restoration Of The Provo River Through The Victory Ranch (November 2003)
- Final Environmental Assessment - Floodplain Habitat Restoration At The Walter Walker And Butch Craig Bottomland Sites (March 2003)
- Final Environmental Assessment - For Endangered Fish Passage Project At Grand Valley Project Diversion Dam And Fish Screen In The Government Highline Canal (March 2003)
- Environmental Assessment - Proposed Experimental Releases from Glen Canyon Dam and Removal of Non-Native Fish (September 2002)
- Draft Environmental Assessment - Morrow Point Trash Rack Cleaning Project (June 2002)
- Final Environmental Assessment - Animas-La Plata Project, Ridges Basin Dam and Reservoir Pre-Construction Facilities Relocations (June 2002)
- Final Environmental Assessment - Mancos Project Carriage Contracts (April 2002)
- Final Environmental Assessment - For The Jicarilla Apache Nation Water Subcontract (September 2001)
- Glen Canyon Dam Modification To Control Downstream Temperatures Plan And Draft Environmental Assessment
Environmental Impact Statements
- Aspinall Unit Operations Final Environmental Impact Statement (January 2012)
- Narrows Project Supplemental Draft Environmental Impact Statement (March 2010)
- Navajo-Gallup Water Supply Project Planning Report and Final Environmental Impact Statement (July 2009)
- Final Environmental Impact Statement - Long-Term Miscellaneous Purposes Contract (July 2006)
- Final Environmental Impact Statement - Carlsbad Project Water Operations and Water Supply Conservation (June 2006)
- Navajo Reservoir Operations FINAL Environmental Impact Statement (April 2006)
- Operation Of Flaming Gorge Dam FINAL Environmental Impact Statement (September 2005)
- Final Environmental Impact Statement - City Of Albuquerque Drinking Water Project (March 2004)
- Navajo Reservoir Operations Draft Envrionmental Impact Statement (September 2002)
- Final Environmental Impact Statement - Operation of Glen Canyon Dam
- Colorado River Interim Surplus Criteria
- Operation of Glen Canyon Dam Final Environmental Impact Statement (March 1995)
- Notice of Intent - To Prepare a Draft Environmental Impact Statement and Conduct Public Scoping on the Adoption of a Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam (July 5, 2011)
- Notice of Availability - Navajo Gallup Water Supply Project Planning Report/Final Environmental Impact Statement (July 6, 2009)
- Notice of Availability - Aspinall Unit Operations Draft Environmental Impact Statement (February 13, 2009)
- Notice - Recreation User Fee for tours at Glen Canyon Dam (October 8, 2008)
- Notice of Public Meeting - Colorado River Basin Salinity Control Advisory Council (October 2, 2008)
- Notice: Long-Term Experimental Plan for the Operation of Glen Canyon Dam and other Associated Management Activities (February 12, 2008)
- Notice of Intent and Notice of Public Meeting: EIS on Long-Term Experimental Plan for Future Operation of Glen Canyon Dam and AMWG Public Meeting (November 6, 2006)
- Notice of Availability of the Operation of Flaming Gorge Dam Final Environmental Impact Statement (November 15, 2005)
- Colorado River Reservoir Operations- Development of Management Strategies for Lake Powell and Lake Mead Under Low Reservoir Conditions
Findings Of No Significant Impact
- FINAL Finding of No Significant Impact - Development and Implementation of a Protocol for High-Flow Experimental Releases from Glen Canyon Dam through 2020 (May 2012)
- FINAL- Finding of No Significant Impact - Non-Native Fish Control Downstream from Glen Canyon Dam (May 2012)
- Finding of No Significant Impact - Ridgway Dam Hydropower Project (December 2011)
- Finding of No Significant Impact - El Paso County Water Improvement District Number One, Canal, Structure, and Improvement Projects (May 2009)
- Finding of No Significant Impact - SR-92 Lehi-Highland UDOT Project No. HPP-TI-0092(8)0 (December 2008)
- Finding of No Significant Impact - Provo Reservoir Canal Trail Project (November 2008)
- Finding of No Significant Impact - La Plata West Water Authority Intake Structure and Water Treatment Plant at Lake Nighthorse (September 2008)
- Finding of No Significant Impact - Navajo Reservoir Area Resource Management Plan Final EA (June 2008)
- Finding of No Significant Impact - Santo Domingo Tribe - Endangered Species Habitat Improvement Project Phase III (March 2008)
- Finding of No Significant Impact - Experimental Releases from Glen Canyon Dam, Arizona, 2008 through 2012 (February 2008)
- Finding of No Significant Impact - A.V. Watkins Dam Safety of Dams Modification (December 2007)
- Finding of No Significant Impact - Energen Resources Natural Gas and Produced Water Pipelines between the Dungan 32-5 #5-2 and #5-3 WElls and the Dungan 32-5 #5-1 Gas Well (December2007)
- Finding of No Significant Impact - Steinaker Reservoir Normal Water Surface Elevation Increase (September 2007)
- Finding of No Significant Impact - Pueblo of San Felipe Bosque Restoration Project (September 2007)
- Finding of No Significant Impact - Perennial Rio Grande Silvery Minnow Refugia at Drain Outfalls (August 2007)
- Finding of No Significant Impact - Long-Term Lease of Groundwater Rights, Pecos River near Ft. Sumner, New Mexico (July 2007)
- Finding of No Significant Impact - Federal Rio Grande Project New Mexico-Texas Operating Procedures, Dona Ana, Sierra, and Socorro Counties, New Mexico and El Paso County, Texas (June 2007)
- Finding of No Significant Impact - Santo Domingo Tribe - Endangered Species Habitat Improvement Project Phase II (April 2007)
- Finding of No Significant Impact - Seven Rivers Pipeline, Pecos River, New Mexico (April 2007)
- Finding of No Significant Impact - Rockport Reservoir (February 2006)
- Finding of No Significant Impact - City of Albuquerque habitat Restoration Project (February 2007)
- Finding of No Significant Impact - Contract between the United States and the Pine River Irrigation District for the Use of Project Water for Miscellaneous Purposes (February 2007)
- Finding of No Significant Impact - Huntington North Dam Outlet Works Modification and Carriage of Non-Project Water through Emery County Project Facilities (January 2007)
- Finding of No Significant Impact - Tropic Ditch Replacement Project (October 2006)
- Finding of No Significant Impact - Middle Rio Grande Project - Sandia Priority Site (July 2006)
- Finding of No Significant Impact - Middle Rio Grande Project - Bernalillo Priority Site (July 2006)
- Finding of No Significant Impact - For the Water 2025 Project Replacement of a Portion of Oaks Park Canal by Ashley Valley Reservoir Company (June 2006)
- Finding of No Significant Impact - Supplement to the Rio Grande Supplemental Water Programmatic Environmental Assessment
- Finding of No Significant Impact - San Juan–Chama Water Contract Amendments with City of Santa Fe, County of Santa Fe, County of Los Alamos, Town of Taos, Village of Taos Ski Valley, Village of Los Lunas, and City of Española (May 2006)
- Finding of No Significant Impact - Middle Rio Grande Riverine Restoration Project (December 2005)
- Finding of No Significant Impact - Proposed Safety of Dams Modifications and Bridge Reconstruction - Scofield Dam, Scofield Project (December 2005)
- Finding of No Significant Impact - Rio Grande Silvery Minnow Sanctuary (November 2005)
- Finding of No Significant Impact - Jicarilla Apache Nation Water Subcontract to the city of Santa Fe (September 2005)
- Finding of No Significant Impact - Drought Relief Well at Taos Pueblo (August 2005)
- Price-Stubb Fish Passage (January 2005)
- Proposed Modification To Experimental Releases From Glen Canyon Dam And Continued Mechanical Removal Of Non-Native Fish (November 2004)
- Title Transfer of Provo Reservoir Canal, Salt Lake Aqueduct, and Pleasant Grove Property - Provo River Project
- Victory Ranch River Restoration Project - Wasatch And Summit Counties, Utah
- Providing Fish Screening In The Redlands Power Canal
- Adoption Of An Interim 602(a) Storage Guideline
- Endangered Fish Passage At The Grand Valley Project Diversion Dam And Fish Screen In The Government Highline Canal
- Proposed Experimental Releases From Glen Canyon Dam And Removal Of Non-Native Fish
- Record of Decision - Aspinall Unit Operations Final Environmental Impact Statement (May 2012)
- Record of Decision - Navajo Gallup Water Supply Planning Report and Final EIS (October 1, 2009)
- Record of Decision - Upper Rio Grande Basin Water Operations Review Record of Decision (August 2007)
- Record of Decision - Carlsbad Miscellaneous Purposes Contract (August 2006)
- Record of Decision - Navajo Reservoir Operations, Navajo Unit - San Juan River NM, CO, UT (July 2006)
- Record of Decision - Carlsbad Project Water Operations & Water Supply Conservation (July 2006)
- Record of Decision - Operation of Flaming Gorge Dam Final Environmental Impact Statement (February 2006)
- Record of Decision - City Of Albuquerque Drinking Water Project (June 2004)
- Record of Decision - Elephant Butte And Caballo Reservoir Resource Management Plans (February 2003)
- Record of Decision - Animas-La Plata Project/Colorado Ute Indian Water Rights Settlement Final Supplemental Environmental Impact Statement (September 2000)
- Record of Decision - Glen Canyon Dam Final Environmental Impact Statement (October 1996)
- Annual Report of Operations for Flaming Gorge Dam Water Year 2009 (March 2012)
- Determining Large Flood Events on the Paria River for a Rapid Response Alternative High Flow Experiment - Technical Report (March 2012)
- Draft - San Juan-Chama Project Integrated Pest Management Plan 2011 - 2015 (September 2011)
- Jordanelle Reservoir Draft Resource Management Plan (September 2011)
- Report to Congress - Utilization of Power Revenues for Annual Base Funding of the Upper Colorado River and San Juan River Basin Recovery Implementation Programs (February 2010)
- Report To Congress: Operations Of Glen Canyon Dam Pursuant To The Grand Canyon Protection Act of 1992: Water Years 2008 - 2009 (January 2010)
- Upper Colorado Region Prevention and Rapid Response Plan for Dreissenid Mussels (January 2010)
- Annual Report of Operations for Flaming Gorge Dam Water Year 2008 (January 2009)
- Water Resources Conservation Plan for Orchard Mesa Irrigation District - Proposal for System Improvements (January 2008)
- Annual Report of Operations for Flaming Gorge Dam Water Year 2007 (October 2007)
- Middle Rio Grande River Maintenance Plan Part 1 Report (May 2007)
- Scoping Report - Glen Canyon Dam Long-term Experimental Plan EIS (March 2007)
- Annual Report of Operations for Flaming Gorge Dam Water Year 2006 (October 2006)
- Sediment Plug - Computer Modeling Study, Tiffany Junction Reach Middle Rio Grande Project (October 2005)
- Statistical Nonparametric Model for Natural Salt Estimation (January 2005)
- Temperature Control Environmental Assessment Scoping Report
- Animas-La Plata Environmental Commitment And Monitoring Plan
- Upper Colorado River Basin Consumptive Uses And Losses Reports
- Arizona Portion of the Upper Colorado River Basin Consumptive Uses and Losses Reports
- Report To Congress: Operations Of Glen Canyon Dam Pursuant To The Grand Canyon Protection Act of 1992: Water Years 1999 - 2001
- Glen Canyon Dam Modification To Control Downstream Temperatures Plan Peer Review
- Application Of The BETTER Model to Lake Powell
Biological Assessments & Opinions
- Joint Biological Assessment - Reclamation and Non-Federal Water Management and Maintenance Activities on the Middle Rio Grande, New Mexico (August 2012)
- Supplement to Biological Assessments for Development and Implementation of a Protocol for High-Flow Experimental Releases and Non-Native Fish Control Downstream from Glen Canyon Dam, Ariz., 2011 through 2020 (July 2011)
- Elephant Butte Reservoir Five-Year Operational Plan Biological Assessment (February 2009) - 2.4 MB
- Aspinall Operations Programmatic Biological Assessment (December 2008)
- Final Biological Opinion for the Operation of Glen Canyon Dam (February 27, 2008)
- Biological Assessment on the Operation of Glen Canyon Dam and Proposed Experimental Flows for the Colorado River Below Glen Canyon Dam During the Years 2008-2012 (December 2007)
- 10-year Biological Opinion for Reclamation's Proposed Carlsbad Project Water Operations and Water Supply Conservation 2006 - 2016 (May 2006)
- Interim Biological Opinion for the Bureau of Reclamation's Proposed Pecos River Dam Operations (April 2006)
- Programmatic Biological Assessment of Bureau of Reclamation's Water and River Maintenance Operations, Army Corps of Engineers' Flood Control Operation, and Related Non-Federal Actions on the Middle Rio Grande, New Mexico (March 1, 2003 - February 28, 2005) - 4.4 MB
- Redlads Fish Screen Final Biological Assessment (August 2003)
- Navajo Reoperations Biological Assessment (July 2002 - Revised July 2003)
- Price-Stubb Fish Passage Biological Assessment (June 2003)
- Biological Opinion and Conference Report on U.S. Bureau of Reclamation's Amended Water Management Operations on the Middle Rio Grande through December 31st, 2002 - 637 KB
- Biological Assessment of Proposed Pecos River 2002 Irrigation Season Operations on the Pecos Bluntnose Shiner (April 2002) - 345 KB
- Initiation of Formal Consultation for the Pecos River 2002 Irrigation Season Water Operations, Biological Opinion (February 2002) - 58 KB
- Biological Assessment: Effects of LFCC Experimental Operations: Water Diversions from the Rio Grande and Parrot Feather Removal (March 2002) - 3.8 MB
- Biological Opinion on the Effects of Actions Associated with Reclamation's, Army Corps of Engineers', and Non-Federal Entities' Discretionary Actions Related to Water management on the Middle Rio Grande, New Mexico (June 2001) - 474 KB
- PNM Fish Passage Biological Assessment (May 2001)
- Biological Opinion on the Effects of Actions Associated with Reclamation's, Army Corps of Engineers', and Non-Federal Entities' Discretionary Actions Related to Water management on the Middle Rio Grande, New Mexico (June 2001) - 474 KB
- Biological Opinon on Reclamation's 2001 Discritionary Actions Related to Water Management on the Pecos River, New Mexico (May 2001) - 257 KB
- Biological Assessment for the Carlsbad Project Acquired Land Transfer Act (April 2001) - 93 KB
- Biological Assessment of Proposed Pecos River 2001 Interim Irrigation Season Operations on the Pecos Bluntnose Shiner (February 2001) - 205 KB
- Request for Endangered Species Consultation for Reclamation's Winter Operations Plan on the Pecos River for the Pecos Bluntnose Shiner, Biological Opinion (February 2001) - 309 KB
- Collbran Rock and Soil Source Biological Assessment (January 2001)
- Interim Programmatic Biological Assessment of Effects of Proposed Pecos River Winter Operations on the Pecos Bluntnose Shiner (November 2000) - 176 KB
- Grand ValleyProject Fish Passage and Fish Screen Biological Assessement(August 2000)
- Interim Programmatic Biological Assessment of Proposed Pecos River Operations on the Listed Species of the Pecos River Basin - Draft (April 2000) - 401 KB
- Biological Opinion on the Biological Assessment of the 1999-2000 Winter Operations of Sumner Dam on Threatened, Endangered, and Proposed Species of the Pecos River Basin (March 2000) - 264 KB
- Biological Assessment of Proposed Pecos River 1999-2000 Winter Operations on Proposed, Threatened, and Endangered Species of the Pecos River Basin (January 2000) 159 KB
- Biological Assessment: Rio grande Restoration at Santa Ana Pueblo, Terrestrial Habitation Enhancement Plan, Rio Grande Silvery Minnow, Southwestern Willow Flycatcher, Bald Eagle (July 1999) - 1 MB