Bonneville Power Administration

http://www.bpa.gov

Link to BPA Home Page
Link to BPA Home PageBPA - RiverBPA - Power LinesBPA - Home Lights
  BPA Home Triangle Bullet Point Rate Cases Triangle Bullet Point BP-14 Meetings & Workshops

Triangle bullet point Rate Case Overview

Triangle bullet point BPA's Costs

Triangle bullet point Before a Rate Case

Triangle bullet point Rate Case Elements

Triangle bullet point Step by Step

Triangle bullet point FERC Review

Triangle bullet point Upcoming/Current Rate Cases

Triangle bullet point Inactive Rate Cases

BP-14 Pre-Rate Proceeding Meetings & Workshops




Workshop Planning Calendar


October 10, 2012 – Generation Inputs Teleconference


September 27, 2012 – Rate Case Workshops


September 12, 2012 – Rate Case Workshops


August 22, 2012 - Rate Case Workshops

August 9, 2012 - Workshops

August 8, 2012 - Rate Case Workshops
July 26, 2012 - Generation Inputs Workshop - Postponed
    Workshop has been re-scheduled on August 8, 2012, 1:00 p.m. – 4:00 p.m.


July 25, 2012 - Transmission Pre-Rate Case Workshop

June 27, 2012 - Rate Case Workshops


June 13, 2012 - Rate Case Workshops


June 12, 2012 - Rate Case Workshops


May 23, 2012 - Rate Case Workshops


May 9, 2012 - Rate Case Workshops

May 8, 2012 - Rate Period High Water Mark Process (RHWM) Workshop
  • RHWM Process Workshop Slides
  • RHWM Explanation
  • May 18, 2012 - Follow-up to May 8, 2012, RHWM Process Workshop (Posted July 26, 2012)

    • On May 18th, BPA met informally with NRU to answer questions about how Canadian operations are incorporated into the hydro modeling and how recent powerhouse improvements are reflected in the hydro modeling. This document details BPA's response to that request. The material is fairly technical in nature, but may be of interest to some parties.



May 8, 2012 - BP-14 Power Rates Workshop



April 26, 2012 - Rate Case Workshops



April 12, 2012 - Transmission Cost of Service Analysis Workshop

March 27, 2012 - Generation Inputs Rate Case Workshop

March 8, 2012 - Generation Inputs Rate Case Workshop

March 7, 2012 - Transmission Cost of Service Analysis Workshop

February 8, 2012 - Transmission Cost of Service Analysis Workshop
January 19, 2012 - Transmission Cost of Service Analysis and Montana Intertie Workshop
January 11, 2012 - Transmission Cost of Service Analysis Workshop



December 05, 2011 - Transmission Cost of Service Analysis and Montana Intertie Workshop

November 16, 2011 - Transmission Cost of Service Analysis Workshop



Need help finding something? Send us a message, or give us a call at 800-622-4519.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy