plansNHDOT Projects

Our Project Information Center is your source for information about ongoing and planned Department of Transportation projects.

 

 

For more information contact:
Public Information Office
(603) 271-6495

Project Description
Roundabouts General information, NH examples, links to roundabout sites, and design guidance
Context Sensitive Solutions NHDOT CSS Process, Case Studies, General Information, and Additional Links
Alstead 14540M Restoration and reconstruction of NH Route 123
Alton 14121A Improvements to the Alton Traffic Circle
Andover 14169 NH Route 11 & 4A bridge removal over US 4 and abandoned railroad
Barnstead- Alton 14121 Improvements to NH 28 beginning 1000" north of Hillsgrove Road in Barnstead and extending north approximately 7 miles to the Alton Traffic Circle
Bath-Lisbon 10425 Improve the Route 10/302 corridor, upgrade existing roadway with the potential to bypass Bath Upper and Lower villages
Bedford 13527 Replacement of bridge carrying US 3 over Everett Turnpike
Bedford 13692A Improvements at the intersection of NH 101 and Hardy Road and Jenkins Road
Bedford-Manchester-Londonderry 11512 Improve access from the F.E. Everett Turnpike to the Manchester Airport and surrounding areas
Belmont 12792 NH 140 improvements from Northfield town line to 0.4 miles east of NH 106
Berlin 12958B Reconstruction and relocation of NH Route 110 from Green Street to Fourth Avenue with associated improvements to Wight Street
Boscawen 15621 Safety improvements at the intersection of US 4 and Harris Hill Road
Bow-Concord (I-93) Interstate 93 Transportation Planning Study
Brentwood 15619 Safety improvements at the intersection of NH 125 and NH 111A (Middle Road)
Brentwood 15620 Safety improvements at the intersection of NH 125 and North Road
Chesterfield 13597 Relocate 0.75 mi. of NH Route 63 along Spofford Lake in Chesterfield
Chocorua NH16/NH113 Chocorua Village workshop concepts for upcoming NH16/NH113 intersection improvement project
Concord 12004 Replace Sewalls Falls Bridge over the Merrimack River
Concord 15613 Replacement of an existing 36" metal pipe under I-393 WB. Exit 1 On and Off Ramps. Both Ramps are scheduled to be closed for about 14 days between July 7 and July 31, 2009.
Conway 11339 Construction of a bypass around Conway Village and North Conway.
Durham-Newmarket 13080 Construct bike shoulders and misc. safety improvements on NH Route 108 in Durham and Newmarket
Epsom 15623 Safety improvements at the intersection of US 4, NH 107, and North Road
Greenland 15618 Safety improvements at the intersection of NH 33, Winnicut Road and Bayside Road
Hampton-Hampton Falls 13408B Feasibility Study of Taylor River Dam and the Bridge Carrying I-95 over the Taylor River
Hampton-North Hampton Blue Star Tpk (I-95), widen & retrofit existing toll facility to implement open road tolling (ORT)
Haverhill-Bath 10436 Reconstruct approximately 2 miles of US Route 302/NH Route 10 in the towns of Haverhill and Bath
Hinsdale 14540N NH 63, Reconstruction due to October 2005 floods 3
Holderness-Plymouth 11849 Replace bridge carrying Bridge Street (NH 175A) over the Pemigewasett River in the towns of Plymouth and Holderness
Hooksett 12537A US 3 improvements from Benton Road/Clough Avenue to NH27 (Whitehall Road/Martin's Ferry Road
Jefferson-Randolph 13602 US 2, safety improvements from NH 115 easterly 5 miles
Lebanon 13951 Bridge Replacement of the US 4 bridge over Mascoma River and rail trail. Also included will be improvements to the intersection of US 4 and NH 4A. Project limits are approximately 1,500 feet either side of the bridge over the Mascoma River.
Lebanon 11700 To increase the capacity of the I-89 Exit 20 interchange with NH 12A
Lebanon, NH-Hartford, VT 14957 Replacement of US 4 Bridge over the Connecticut River
Manchester 14170 Replacement of Island Pond Road bridges of I-93 at Extension of Soundwall adjacent to I-93 at Pinebrook Place
Manchester 14048 Rehabilitation of bridge on I-293 over Black Brook between Exit 6 and 7
Manchester-Hooksett-Bow 13917 Safety improvements on NH Route 3A from I-293 Exit 7 to I-89 (approx. 13 miles)
New Boston Town Center Study improvements to the New Boston Town Center including Roadway, Bridge, Parking and Pedestrian facilities
Newington-Dover 11238 Spaulding Turnpike expansion from exit 1 in Newington to the Dover toll plaza near exit 6, including improvements to the Little Bay Bridge and General Sullivan Bridge
New Ipswich 14465 NH Route 123/124 bridge improvements over Souhegan River
New London 14451A Improvements to the intersection of NH 11 and NH 114 (Crockett's Corner)
Pelham 14491 Improvements in the area of Pelham Town Center
Pembroke 14477A US 3/Pembroke Hill Road intersection improvements
Pittsfield 15622 Safety improvements at the intersection of NH 28 and Leavitt Road
Plaistow 13803 Widen 0.6 miles of NH Route 125 in Plaistow
Plaistow-Atkinson 12359 Replace NH 121 bridge over Little River and B&M Railroad
Plaistow-Kingston 10044-B Reconstruct approximately 6 miles of NH Route 125 in the towns of Plaistow and Kingston
Portsmouth 13455 Replace six bridges over US 1 Bypass
Portsmouth - Kittery 13678 Memorial Bridge Rehabilitation project - US 1 over the Piscataqua River
Portsmouth - Kittery 13678E US 1, US 1 Bypass, I-95, Transportation need study for Memorial Bridge, Sarah Mildred Long Bridge, and High-Level Bridge over Piscataqua River.
Rochester - 10620D Spaulding Turnpike Expansion from Exit 11 to Exit 16
Rye 12595 Improvements to NH 1-A, Sagamore Road and Elwyn Road (Foye's Corner)
Rye 13269 NH 1-A, replace wooden bridge over Seavey's Creek - 252/156, with wooden bridge structure
Salem-Manchester 10418-C Preliminary design and environmental evaluation of the reconstruction of I-93 from Salem to Manchester
Walpole 14540-U Reconstruction of the bridge carrying NH Route 123 over Cold River
Walpole-Charlestown 14747 Road improvements from NH12A in Charlestown south approximately 2.7 miles to Main Street in Walpole
Winchester 12906 NH 10 Bridge Replacement over Ashuelot River
Windham 13113 Widening approximately 2.0 miles of Lowell Road in Windham to improve safety and provide bicycle shoulders along the roadway
Windham-Salem 10075 Reconstruct NH 111 from I-93 Exit 3 in Windham easterly 3.5 miles on new location north of Shadow Lake