Specific Communications with Spring 2002 Outage
Plants
This page presents NRC communications with Nuclear Power Plants having
outages during the spring 2002 season. NRC staff held telephone conversations
in Pre-Inspection Communications with managers of all plants conducting
refueling outages this Spring to ensure they inspect reactor vessel heads
for signs of degradation as required in Bulletin 2002-01. Results of those
inspections were discussed with NRC staff in Post-Inspection Communications.
Links to communications in the table will be activated as quickly as is
possible.
All links on this page are to documents in Adobe Portable Document Format
(PDF). See our Plugins, Viewers, and Other
Tools page for more information.
Plant |
Pre-Inspection Communications
|
Post-Inspection Communications
|
Other Communications
|
Arkansas 2 |
|
|
|
Byron 1 |
|
|
|
Calvert Cliffs 1 |
|
|
|
Comanche Peak |
|
|
|
Cook |
|
|
|
Diablo Canyon 1 |
|
|
|
Ginna |
|
|
|
McGuire 2 |
|
|
|
Millstone 2 |
|
|
|
Oconee 1 |
|
|
|
Palo Verde 2 |
|
|
|
Surry 2 |
|
|
|
Turkey Point 4 |
|
|
|
Vogtle 1 |
|
|
|
Waterford 3 |
|
|
|
Watts Bar |
|
|
|
Wolf Creek |
|
|
|
|