Drilling Projects |
008 |
Blowout Prevention Procedures for
Deepwater Drilling |
009 |
Ultrasonic Flowmeter Evaluation |
010 |
Subsea Inspection |
011 |
Portable Data Recorder for USGS
inspectors |
012 |
Technology Assessment |
013 |
Fluidic Pulser for Mud Pulse
Telemetry |
014 |
Fluidic Sensor for Hydrocarbon
& Hydrogen Sulfide Gas |
016 |
Technology Assessment for Outer
Continental Shelf, Oil and Gas Operations in the Arctic Ocean |
017 |
Fire Suppression Technology |
018 |
Overpressured Marine Sediments |
020 |
Toxic Effects of Drill Mud on
Coral |
021 |
Underwater Acoustic Telemetry |
022 |
Pattern Recognition Technology |
024 |
Technology Assessment for
Estimating Hydrocarbons Lost During a Blowout |
027 |
Technology Assessment for
Cementing Shallow Casings |
028 |
Casing Wall Thickness Technology |
032 |
Recapture of Oil from Blowing
Wells |
039 |
Cryogenic Control of Blowing
Wells |
062 |
Southern Bering Sea Production
System Study |
065 |
De-icing and Prevention of Ice
Formation on Offshore Drilling Platforms |
067 |
Rig Mooring Reliability |
082 |
Numerical Wave Force Simulation |
085 |
Subsea Collection of Blowing Oil
and Gas |
086 |
ATOS (Antiturbidity Overflow
System) Experiment |
105 |
Chukchi Sea Transportation Cost
Comparison Study |
108 |
An Investigation of the
Non-Linear Behavior of Compliant Risers |
126 |
Engine Emission Control |
145 |
Response Prediction Techniques
for Risers in Sheared Currents |
150 |
Floating Vessel Blowout Control |
151 |
Investigation of Simulated Oil
Well Blowout Fires |
195 |
Shallow Gas Broaching |
200 |
Securing Procedures for Mobile
Drilling Units (MODU's) in the Gulf of Mexico |
216 |
SPAR Development Model Test
Program |
226 |
Hydrates of
Hydrocarbons--Practical Implications |
249 |
Control of Natural Gas Hydrates |
252 |
Novel Hydrate Prediction Methods
for Drilling Fluids |
253 |
Blowout Preventer Study |
255 |
Development Studies of Mud
Converted to Cement |
257 |
Project Cancelled |
264 |
Development of Improved Drill
String Safety Valve Design and Specifications |
275 |
Riser Reliability Analysis |
276 |
Mitigating the Problem of Gas
Migration After Primary Cementing |
287 |
Fate and Behavior of Deepwater
Subsea Oil Well Blowouts in the Gulf of Mexico |
300 |
Coiled-Tubing and Slim-Hole
Technology, DEA-67 Phase III |
311 |
Oil Spill Containment, Remote
Sensing, and Tracking from Deep Water Blowouts: Status of Existing and Emerging
Technologies |
319 |
Reliability of Subsea Blowout
Preventer Systems for Deepwater Applications--Phase II |
327 |
Applied Gas Hydrate Research
Program |
339 |
Modernization of Tubular Collapse
Performance Properties |
340 |
Project Cancelled |
341 |
Develop and Improved Methodology
for Pre-drill Pore Pressure and Fracture Gradient Prediction |
342 |
Project Cancelled |
357 |
Assessment of Risks Associated
with Carbon Monoxide Gas During Well Perforation |
380 |
Evaluation of the Suitability of
Industry Standards as MMS Requirements |
382 |
Experimental Validation of Well
Control Procedures in Deepwater |
383 |
Performance of Deepwater BOP
Equipment During Well Control Events |
384 |
Deepwater Riser Wear Technology |
386 |
Deepwater Dual-Density Drilling
Workshop |
408 |
Development of a Blowout
Intervention Method and Dynamic Kill Simulated for Blowouts Occurring in Ultra-Deepwater |
411 |
Manual for Sound Coiled-Tubing
Drilling Practices |
412 |
Underbalanced Drilling Training
for MMS Drilling Engineers |
426 |
Long Term Integrity of Deep-Water
Cement Systems |
439 |
Multi-Lateral Drilling Seminars |
474 |
Evaluation of Safety Concerns during Well
Testing from OCS Drilling Rigs |
490 |
CRA for Composite Drilling and
Production Risers |
492 |
Reliability of Subsea Systems |
495 |
Risk Assessment and
Evaluation of the Conductor Pipe Setting Depth On Shallow Water Depths |
505 |
Step Changes in Drilling Technology 2004
Workshop |
519 |
Drilling and Completion Gaps for High Temperature and High Pressure In Deep
Water |
521 |
Riser VIV Workshop |
540 |
Risk Assessment of Surface
vs. Subsurface BOP's on Mobile Offshore Drilling Units |
541 |
Application of Dual
Gradient Technology to Top Hole Drilling |
548 |
Examination and Review of Mobile Offshore Drilling Unit
(MODU) Loss of Station-keeping Ability During Hurricane Ivan and Assessment
of Current Mooring Standards and Criteria to Prevent Similar Failures |
566 |
Assessment of the Acceptability and safety of Using Equipment, Particularly
BOP and Wellhead Components at Pressures in Excess of the Rated Working
Pressure |
574 |
No MODUs Adrift |
582 |
A Probabilistic Approach to Risk Assessment of Managed
Pressure Drilling in Offshore Drilling Applications |
583 |
Characterizing
Material Performance for Design of Sour Service HPHT Equipment in Accordance
with API RP 6HP Practices |
584 |
Arctic Offshore Technology
Assessment of Exploration and Production Options for Cold Regions of the US
Outer Continental Shelf |
606 |
Hybrid Well Riser Risk of Failure and Prevention |
611 |
JIP for the Development of Standardized Testing
Requirements for HPHT Equipment |
616 |
Tulsa University Drilling Projects (TUDPs) |
621 |
High Pressure High Temperature (HPHT) Elastomer Evaluation |
631 |
Risk Profile of Dual Gradient Drilling |