Project Number | 105 |
Date of Summary | December 31, 1986 |
Subject | Chukchi Sea Transportation Cost Comparison Study |
Performing Activity | INTEC Engineering, Inc. |
Principal Investigator | Mr. David S. McKeehan |
Contracting Agency | Minerals Management Service |
Estimated Completion | Completed. |
Description | This was a Joint Industry Project (JIP) to study the feasibility and reliability of transporting hydrocarbons from the proposed lease sale areas to shore by pipelines, oil tankers, or combinations of the two systems. Terminals and support facilities were considered in the feasibility study. This study was performed in two stages. The first consisted of data collection and evaluation, defining the study criteria, and screening all possible transportation options. Stage II consisted of a more detailed technical and economic evaluation of transportation options selected in Stage I. Pipeline construction methods as well as an evaluation of transportation system configurations for various production rates versus ice coverage were completed in this stage. |
Progress | Completed. |
Reports |
|
Report Out of Print | Chukchi Sea Transportation Feasibility and Cost Comparison Joint Industry Study, Volume 1, INTEC No. H- 046.2, INTEC Engineering Inc., Houston, Texas, May 1986. |
AA (140 pages, 7,850 KB) | Chukchi Sea Transportation Feasibility and Cost Comparison Joint Industry Study, Volume 2, INTEC No. H- 046.3, INTEC Engineering Inc., Houston, Texas, November 1986. |
AB (72 pages, 2,428 KB) | Chukchi Sea Transportation Feasibility and Cost Comparison Joint Industry Study, Ph. 2, Pipeline Cost Est. Prog., Appendix F - Risk Analysis, INTEC Eng. Inc., November 1986. |
Privacy | Disclaimers | Accessibility | Topic Index | FOIA Last Updated: 09/08/2008, 09:55 AM |