Item No |
Description |
Units |
October 31, 2007 |
Twelve Month Moving |
Usage |
Quantity |
Avg Bid |
Quantity |
Avg Bid |
712 2003 |
JT / CRCK SEAL (POLY MOD ASPH EMULSION) |
GAL |
|
|
5,900.000 |
14.98000 |
1 |
730 2002 |
FULL - WIDTH MOWING |
AC |
|
|
55,003.840 |
21.89707 |
9 |
730 2003 |
SPOT MOWING |
AC |
|
|
400.000 |
24.73125 |
6 |
734 2001 |
LITTER REMOVAL |
AC |
|
|
32,826.240 |
8.38099 |
9 |
745 2006 |
JANITORIAL MAINT (PICNIC AREAS) |
CYC |
|
|
2,275.000 |
53.15877 |
5 |
745 2007 |
GROUNDS MAINT (MOWING / TRIMMING) |
CYC |
|
|
934.000 |
100.21471 |
5 |
751 2027 |
MOWING, TRIMMING, AND EDGING |
CYC |
|
|
27.000 |
500.00000 |
1 |
752 2020 |
TREE TRIMMING / BRUSH REMOVAL |
MI |
10.000 |
2,000.00000 |
226.250 |
1,460.30807 |
4 |
752 2021 |
TREE TRIMMING / BRUSH REMOVAL (CHANNELS) |
AC |
|
|
20.000 |
700.85000 |
1 |
752 2022 |
TREE REMOVAL (4" - 12" DIA) |
EA |
2,200.000 |
44.54545 |
3,335.000 |
41.53673 |
6 |
752 2023 |
TREE REMOVAL (12" - 18" DIA) |
EA |
2,200.000 |
68.27273 |
2,890.000 |
64.83391 |
5 |
752 2024 |
TREE REMOVAL (18" - 24" DIA) |
EA |
1,700.000 |
82.47794 |
2,390.000 |
77.60565 |
6 |
752 2025 |
TREE REMOVAL (24" - 30" DIA) |
EA |
700.000 |
134.42857 |
1,110.000 |
115.85586 |
5 |
752 2026 |
TREE REMOVAL (30" - 36" DIA) |
EA |
250.000 |
183.25000 |
360.000 |
164.75694 |
5 |
752 2027 |
TREE REMOVAL (36" - 42" DIA) |
EA |
130.000 |
273.55769 |
200.000 |
312.81250 |
5 |
752 2028 |
TREE REMOVAL (42" - 48" DIA) |
EA |
45.000 |
137.83333 |
75.000 |
312.70000 |
6 |
752 2029 |
TREE REMOVAL (48" - 60" DIA) |
EA |
40.000 |
130.06250 |
55.000 |
499.13636 |
5 |
752 2030 |
TREE REMOVAL (60" - 72" DIA) |
EA |
|
|
10.000 |
2,200.00000 |
1 |
770 2001 |
REPAIR RAIL ELEMENT (W - BEAM) |
LF |
|
|
16,500.000 |
12.42424 |
5 |
770 2002 |
REPAIR RAIL ELEMENT (THRIE - BEAM) |
LF |
|
|
450.000 |
20.00000 |
2 |
770 2003 |
REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) |
LF |
|
|
171.000 |
16.66667 |
2 |
770 2004 |
REM / REPL TIMBER / STL POST W / O CONC FND |
EA |
|
|
3,575.000 |
31.73427 |
5 |
770 2005 |
REM / REPL TIMBER / STL POST W / CONC FND |
EA |
|
|
290.000 |
48.79310 |
5 |
770 2007 |
REPAIR OF TERMINAL ANCHORS POSTS |
EA |
|
|
151.000 |
33.27815 |
5 |
770 2008 |
REPLACE TERMINAL ANCHOR POSTS |
EA |
|
|
119.000 |
89.91597 |
5 |
770 2009 |
REMOVE GDRAIL END TRT / REPL WITH SGT |
EA |
|
|
113.000 |
2,156.63717 |
5 |
770 2010 |
REPL SINGLE GDRAIL TERM IMPACT HEAD |
EA |
|
|
15.000 |
666.66667 |
2 |
770 2011 |
REPLACE SINGLE GDRAIL TERMINAL RAIL |
LF |
|
|
300.000 |
21.66667 |
2 |
770 2012 |
REPLACE SINGLE GDRAIL TERMINAL POST |
EA |
|
|
15.000 |
100.00000 |
2 |
770 2014 |
REPAIR STEEL POST WITH BASE PLATE |
EA |
|
|
163.000 |
112.02454 |
5 |
770 2016 |
REPAIR SINGLE GUARDRAIL TERMINAL |
EA |
|
|
25.000 |
960.00000 |
2 |
770 2022 |
REM & RESET SGT IMPACT HEAD |
EA |
|
|
12.000 |
250.00000 |
2 |
770 2023 |
REPLACE SGT OBJECT MARKER |
EA |
|
|
21.000 |
66.66667 |
2 |
770 2024 |
REPLACE SGT CABLE ANCHOR |
EA |
|
|
15.000 |
100.00000 |
2 |
770 2025 |
REPLACE SGT CABLE ASSEMBLY |
EA |
|
|
15.000 |
100.00000 |
2 |
770 2026 |
REPLACE SGT STRUT |
EA |
|
|
15.000 |
100.00000 |
2 |
770 2027 |
REMOVE & REPLACE BLOCKOUT |
EA |
|
|
240.000 |
21.66667 |
2 |
776 2001 |
REPAIR (STEEL POST W / W - BEAM - T101) |
LF |
|
|
300.000 |
10.00000 |
1 |
776 2004 |
REPAIR (STL POST W / DOUBLED W - BEAMS - T6) |
LF |
|
|
650.000 |
76.92308 |
3 |
776 2009 |
REP (STL PIPE PEDESTRIAN RAIL - PR1) |
LF |
|
|
300.000 |
20.00000 |
1 |
776 2020 |
REPAIR (TY T101RC) |
LF |
|
|
400.000 |
40.00000 |
1 |