Technical Events |
Every field season, the USAP sponsors a variety of technical events that are not scientific research projects but support one or more science projects. |
|
||
NASA
Goddard Space Flight Center: NAILS, MTRS1, MTRS2, and SPTR |
||
T-008-M
|
||
|
||
Ice Core Drilling Services | ||
T-150-M
|
||
|
||
Arctic and Antarctic Research Center at Scripps Institution of Oceanography | ||
T-312-M/P/S
|
||
|
||
Installation, operation and maintenance of a Comprehensive Test Ban Treaty class infrasound array in Windless Bight, Antarctica | ||
T-396-M
|
||
|
||
NASA/McMurdo Ground Station | ||
T-927-M
|
|
||
NASA GSFC
|
NAILS, MTRS1, MTRS2, and SPTR | |
Event
#:
|
T-008-M | |
Station:
|
McMurdo | |
Work
Site:
|
McMurdo Station | |
Team
Leader:
|
Michael Comberiate | |
Affiliation:
|
NASA Goddard Space
Flight Center |
|
Project
Description:
|
NASA researchers
will perform maintenance and upgrades to their systems during the
Austral 2003-2004 summer season: NAILS two-meter satellite tracking station on Ross Island:
|
|
|
||
ICDS
|
Ice Core Drilling Services (ICDS) | |
Event
#:
|
T-150-M/S | |
Station:
|
South Pole Station | |
Work
Site:
|
USGC observatory 8 kilometers from South Pole Station | |
Team
Leader:
|
Dr. Charles R. Bentley | |
Affiliation:
|
University of
Wisconsin Madison |
|
Project
Description:
|
Supporting Rhett Butler's project, G-090-S, the South Pole-based project team will operate the ICDS 4-inch drill system to complete reaming out the last 12" diameter borehole to a depth of about 300 meters. The ICDS team will commute eight kilometers out of South Pole station to the USGS observatory. Team members will
also inventory and maintain ICDS drills and supplies in McMurdo. |
|
|
||
Scripps AARC
|
Arctic and Antarctic Research Center at Scripps Institution of Oceanography (AARC), TeraScan project | |
Event
#:
|
T-312-M/N/P | |
Station:
|
McMurdo and Palmer Stations, RV/IB Nathaniel B. Palmer | |
Work
Site:
|
TeraScan computer installations | |
Team
Leader:
|
Dr. Dan Lubin | |
Affiliation:
|
Scripps Institution
of Oceanography |
|
Project
Description:
|
The AARC is funded
to archive and distribute all NOAA and DMSP (Defense Meteorological
Satellite Program) data collected south of 60 degrees. The data from
polar orbiting satellites are collected by ground stations at McMurdo
and Palmer Stations aboard the RV/IB Nathaniel B. Palmer. It is
distributed by ARCC to the scientific community and to support
contractor meteorologists for forecasting. |
|
|
||
CTBT
|
Installation, operation and maintenance of a Comprehensive Test Ban Treaty (CTBT) class infrasound array in Windless Bight, Antarctica | |
Event
#:
|
T-396-M | |
Station:
|
McMurdo | |
Work
Site:
|
Windless Bight | |
Team
Leader:
|
Mr. Daniel L. Osborne | |
Affiliation:
|
University of Alaska
Fairbanks |
|
Project
Description:
|
This group
operates and maintains a CTBT (Comprehensive Test Ban Treaty)
infrasound array at Windless Bight, Ross Island. |
|
|
||
MGS
|
NASA/McMurdo Ground Station (MGS) | |
Event
#:
|
T-927-M | |
Station:
|
McMurdo | |
Work
Site:
|
McMurdo Station | |
Team
Leader:
|
Mr. Ken Griffin | |
Affiliation:
|
Honeywell Technical
Solutions, Inc. |
|
Project
Description:
|
NASA’s McMurdo Ground Station (MGS) performs critical support for countdown, liftoff and early-orbit phases of satellite launching operations. It also tracks a variety of in-orbit scientific (TRACE, FAST, WIRE, SWAS, GRACE 1 and 2, SAC-C, CHAMP, etc.) and mapping (Radarsat, Lansat-7,QuikSCAT, ERS-2, etc.) satellites. MGS supplies real time data (downlink) and commanding (uplink) support to a variety of projects via NASA’s dedicated 128Kbit data line. Voice support is through a dedicated 16Kbit voice loop with Goddard Space Flight Center. Radarsat, ERS-2 SAR, and Taurus START 2 treaty compliance data will be shipped back to the U.S. for processing. If requested, MGS will uplink data through the MTRS-1 ground station located on Black Island, or MTRS-2 ground station located on Crater Hill through TDRSS (Telemetry and Data Relay Satellite System) to White Sands, New Mexico. Each austral summer, project team members at McMurdo Station are responsible for the maintenance and operation of the ground station. This season the MGS team will relocate their equipment to the Joint Spacecraft Operations Center (JSOC). In addition to relocating the equipment, upgrades may be performed on the system to include a RAID storage device, and system automation enhancements. |
|