![Push Pin Image](images/yellow_pin.gif) |
As part of President Obama’s plan to stimulate the lagging economy, the
American Recovery and Reinvestment Act
was passed in February, 2009. Recovery Act
funds provided to the Mitigation Commission create the opportunity to accelerate a
few LDWP aspects. These include: constructing a building for storage and maintenance
and repair of supplies and equipment used for the LDWP (the building would be
located on lands owned by the Ute Indian Tribe near Myton, Utah) and removal and
control of noxious Russian olive within project boundaries.
|
![Push Pin Image](images/blue_pin.gif) |
Due to media reports and public inquiry, the Mitigation Commission has issued a statement regarding Mosquito Control
at the Lower Duchesne River Wetlands Mitigation Project. [Click here to read the Statement]
|
![Push Pin Image](images/yellow_pin.gif) |
The
LDWP Record of Decision
has been signed and is available for public review.
[Click here to view the
LDWP ROD]
|
![Push Pin Image](images/blue_pin.gif) |
The U.S. Department of Interior signed its
LDWP Record of Decision
on September 22, 2008. [You can click here to view it. ]
|