Current Monitoring Data
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.
| ||
- Airborne PCB Monitoring Data at the New Bedford Harbor Superfund Site, 2004 - 2008
- Table (PDF) (1 p., 15 KB)
- Map (PDF) (1 p., 255 KB)
- Mechanical Sediment Excavation at the Former Aerovox Facility Shoreline
- Air Monitoring Results Aerovox Excavation 2008 - July 14, 2008 through July 18, 2008 (PDF) (2 pp., 2 KB)
- Air Monitoring Results Aerovox Excavation 2008 - July 7, 2008 through July 11, 2008 (PDF) (2 pp., 99 KB)
- Air Monitoring Results Aerovox Excavation 2008 - June 30, 2008 through July 04, 2008 (PDF) (2 pp., 40 KB)
- Air Monitoring Results Aerovox Excavation 2008 - June 23, 2008 through June 27, 2008 (PDF) (2 pp., 96 KB)
- Air Monitoring Results Aerovox Excavation 2008 - May 29, 2008 through June 20, 2008 (PDF) (7 pp., 30 KB)
- Aerovox Air Sampling Stations Locations (PDF) (1 p., 194 KB)
- Sawyer Street Air Sampling Stations Locations (PDF) (1 p., 218 KB)
- Air Monitoring During Full Scale Dredging (Fall 2004) - New Bedford Harbor Superfund Site
- Air Monitoring During Construction of Marine Bulkhead along Hervey Tichon Avenue, New Bedford
- Air Monitoring During PCB Sediment Cleanup of Acushnet River in Wood / Slocum Street Area, New Bedford & Acushnet