Area |
Chapter |
Title |
CN Number |
Word |
TI |
2512/07 |
Trial Program - Construction Assessment Team Inspections |
08-004 |
TI |
2512/07, Rev 2, |
Regional Construction Assessment Team Inspections |
08-004 |
|
TI |
2512/15 |
Inspection of Watts Bar Nuclear Plant Employee Concerns Program |
08-004 |
|
TI |
2512/016 |
Inspection of Watts Bar Nuclear Plant Cable Issues Corrective Action
Program Plan |
08-004 |
|
TI |
2512/017 |
Inspection of Watts Bar Nuclear Plant Cable Tray and Supports Corrective
Action Program Plan |
08-004 |
|
TI |
2512/018 |
Inspection of Watts Bar Nuclear Plant Electrical Conduit and Supports
Corrective Action Program Plan |
08-004 |
|
TI |
2512/019 |
Inspection of Watts Bar Nuclear Plant Design Baseline Corrective
Action Program Plan |
08-004 |
|
TI |
2512/020 |
Inspection of Watts Bar Nuclear Plant Electrical Issues Corrective
Action Program Plan |
08-004 |
|
TI |
2512/021 |
Inspection of Watts Bar Nuclear Plant Equipment Seismic Corrective
Action Program Plan |
08-004 |
|
TI |
2512/022 |
Inspection of Watts Bar Nuclear Plant Fire Protection Corrective
Action Program Plan |
08-004 |
|
TI |
2512/023 |
Inspection of Watts Bar Nuclear Plant Hanger Update Corrective
Action Program Plan |
08-004 |
|
TI |
2512/024 |
Inspection of Watts Bar Nuclear Plant Heat Code Traceability Corrective
Action Program Plan |
08-004 |
|
TI |
2512/025 |
Inspection of Watts Bar Nuclear Plant HVAC Duct and Supports Corrective
Action Program Plan |
08-004 |
|
TI |
2512/026 |
Inspection of Watts Bar Nuclear Plant Instrument Lines Corrective
Action Program Plan |
08-004 |
|
TI |
2512/027 |
Inspection of Watts Bar Nuclear Plant Piece Parts/Procurement Corrective
Action Program Plan |
08-004 |
|
TI |
2512/028 |
Inspection of Watts Bar Nuclear Plant QA Records Corrective Action
Program Plan |
08-004 |
|
TI |
2512/029 |
Inspection of Watts Bar Nuclear Plant Q-List Corrective Action
Program Plan |
08-004 |
|
TI |
2512/030 |
Inspection of Watts Bar Nuclear Plant Seismic Analysis Corrective
Action Program Plan |
08-004 |
|
TI |
2512/031 |
Inspection of Watts Bar Nuclear Plant Vendor Information Corrective
Action Program Plan |
08-004 |
|
TI |
2512/032 |
Inspection of Watts Bar Nuclear Plant Welding Corrective Action
Program Plan |
08-004 |
|
TI |
2512/033 |
Inspection of Watts Bar Nuclear Plant Concrete Quality Special
Program |
08-004 |
|
TI |
2512/034 |
Inspection of Watts Bar Nuclear Plant Containment Cooling Special
Program |
08-004 |
|
TI |
2512/035 |
Inspection of Watts Bar Nuclear Plant Control Room Design Review
Special Program |
08-004 |
|
TI |
2512/036 |
Inspection of Watts Bar Nuclear Plant Environmental Qualification
Special Program |
08-004 |
|
TI |
2512/037 |
Inspection of Watts Bar Nuclear Plant Master Fuse List Special
Program |
08-004 |
|
TI |
2512/038 |
Inspection of Watts Bar Nuclear Plant Mechanical Equipment Qualification
Special Program |
08-004 |
|
TI |
2512/039 |
Inspection of Watts Bar Nuclear Plant Microbe Induced Corrosion
Special Program |
08-004 |
|
TI |
2512/040 |
Inspection of Watts Bar Nuclear Plant Moderate Energy Line Break
Special Program |
08-004 |
|
TI |
2512/041 |
Inspection of Watts Bar Nuclear Plant Radiation Monitoring System
Special Program |
08-004 |
|
TI |
2512/042 |
Inspection of Watts Bar Nuclear Plant Soil Liquefaction Special
Program |
08-004 |
|
TI |
2512/043 |
Inspection of Watts Bar Nuclear Plant Use-As-Is CAQRS Special Program |
08-004 |
|
TI |
2515/150,
Rev.3 |
Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles
(NRC Order EA-03-009) |
05-006 |
.doc |
TI |
2515/157 |
Mark I and Mark II Containment Operations |
04-012 |
TI |
2515/166, Rev 1 |
Pressurized Water Reactor Containment Sump Blockage (NRC Generic Letter 2004-02) |
07-016 |
.doc |
TI |
2515/170 |
Risk Management Technical Specifications Initiative 4b Risk-Informed
Completion Times |
07-037 |
.doc |
TI |
2515/172 |
Reactor Coolant System Dissimilar Metal Butt Welds |
08-009 |
.doc |
TI |
2515/173, Rev 1 |
Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative |
08-031 |
.doc |
TI |
2515/174 |
Hydrogen Igniter Backup Power Verification |
08-007 |
.doc |
TI |
2515/175 |
Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review |
08-017 |
.doc |
TI |
2515/176 |
Emergency Diesel Generator Technical Specification Surveillance Requirements Regarding Endurance and Margin Testing |
08-015 |
.doc |
TI |
2600/009 |
Inspection of Interim Compensatory Measures (ICMs) at Gaseous Diffusion
Plants (GDP) |
03-019 |
.doc |
TI |
2800/030 |
Verification of the Status of Devices Authorized For Use Under a
General License |
00-011 |
TI |
2800/034 |
Inspection of Panoramic and Underwater Irradiators Additional Security
Measures |
04-005 |
TI |
2800/035 |
Verification of Licensee Responses to NRC Bulletin 2003-04 Regarding
Inventories of Source and Special Nuclear Materials Tracked in the
Nuclear Materials Management and Safeguards System |
04-021 |
.doc |
TI |
2800/037 |
Safety Procedures For Panoramic Irradiators |
05-019 |
.doc |
TI |
2800/039 |
Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in the National Source Tracking System Pursuant to Title 10, Code of Federal Regulations, Part 20.2207 (10 CFR 20.2207) |
09-011 |
.doc |