Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us |
Issue Date: 06/05/03
NRC INSPECTION MANUAL IIPB
All Files in ZIP Format | cn 03-019.zip |
DELETED:
Number |
Date |
TRANSMITTED:
Number |
||
---|---|---|---|---|
Date |
||||
1. | ---- | ---- | TI 2600/009 | 06/05/03 |
TRAINING: |
No special training requirements have been identified for any documents issued with this change notice. |
REMARKS: | TI 2600/009 (Inspection of Interim Compensatory Measures (ICMs) At Gaseous Diffusion Plants (GDP)) is issued to verify that GDP licensees are effectively implementing the security interim compensatory measures imposed by the 05/28/02 NRC Order. |
DISTRIBUTION: | Standard |