Skip to contentU.S. Department of Transportation, Federal Highway Administration FHWA HomeFeedback
Environment

Appendix D. CMAQ Project Cost Effectiveness Calculations (Normalized Emissions Results And Costs)

Category Subcategory CMAQ PROJECT ID PROJECT DESCRIPTION Annual Emissions Reduction (kg/year) Annualized Project Cost Cost Effectiveness ($/ton)
VOC CO NOx PM10 PM2.5 VOC CO NOx PM10 PM2.5
Traffic Flow Improvements Traffic Signalization MI20020058 Ryan Rd. 8 Mile Rd. To 23 Mile Rd. 2,715.0 -16,858.9 -1,706.1 0.0 0.0 $110,256 $36,840 -$5,933 -$58,627 $0 $0
Traffic Flow Improvements Traffic Signalization LA20040001 Continuous Flow Intersection- Airline @Sherwood Forest 1,916.6 7,052.1 649.3 11.9 7.7 $904,773 $428,247 $116,390 $1,264,080 $68,974,198 $106,166,167
Traffic Flow Improvements Traffic Signalization KY20050008 Fiber Optic Cable Installation 31,311.2 115,206.8 10,607.7 194.4 126.3 $61,553 $1,783 $485 $5,264 $287,233 $442,113
Traffic Flow Improvements Traffic Signalization OH20050033 West Main Street New Signals 3,461.5 12,736.2 1,172.7 21.5 14.0 $98,414 $25,792 $7,010 $76,132 $4,154,132 $6,394,106
Traffic Flow Improvements Traffic Signalization TN20050016 Sr-169 Cedar Bluff To College St 1,975.2 -14,400.0 -828.3 0.0 0.0 $5,078 $2,332 -$320 -$5,562 $0 $0
Traffic Flow Improvements Traffic Signalization KY20060009 Lane Use Control - Reversible Lanes 304.7 1,121.0 103.2 1.9 1.2 $74,536 $221,937 $60,319 $655,103 $35,745,553 $55,020,116
Traffic Flow Improvements Traffic Signalization Not yet assigned 2 Lane Roundabout At Fuller And Washington 113.8 601.5 86.7 0.0 0.0 $467,981 $3,730,970 $705,808 $4,896,080 $0 $0
Traffic Flow Improvements Freeway Management LA20030008 Baton Rouge Phase 2 Its 15,300.6 197,991.9 39,702.2 1,438.4 934.5 $443,109 $26,272 $2,030 $10,125 $279,456 $430,144
Traffic Flow Improvements Freeway Management WA20040027 Duwamish Its 2,973.6 16,228.8 2,268.0 0.0 0.0 $318,190 $97,073 $17,787 $127,274 $0 $0
Traffic Flow Improvements Freeway Management CT20050001 I/M System Design And Construction 4,173.7 15,560.5 1,322.4 0.0 1.5 $218,725 $47,541 $12,752 $150,051 $0 $135,906,590
Traffic Flow Improvements Freeway Management MI20050090 3 Changeable Message Boards On I-75 28,431.5 -78,068.8 -942.5 0.0 0.0 $23,082 $737 -$268 -$22,218 $0 $0
Traffic Flow Improvements Freeway Management Not yet assigned Alabama Service And Assistance Patrol 8,102.6 29,812.7 2,745.0 50.3 32.7 $871,432 $97,568 $26,517 $287,995 $15,714,389 $24,187,834
Traffic Flow Improvements High-Occupancy Vehicle Lanes TX20020069 Dallas Hov Interchange Ih 635 Us 75 1,351.7 18,950.6 632.2 0.0 0.0 $28,194,393 $18,922,053 $1,349,691 $40,458,088 $0 $0
Shared Ride Programs Regional Ridesharing MD20020010 Maryland Ridesharing Program 12,214.8 153,913.7 13,830.8 551.0 254.5 $1,200,211 $89,139 $7,074 $78,724 $1,976,153 $4,278,198
Shared Ride Programs Regional Ridesharing PA20050202 University Of Pitt Tdm 3,778.6 48,421.7 3,899.3 144.7 66.8 $358,669 $86,112 $6,720 $83,444 $2,248,489 $4,867,780
Shared Ride Programs Regional Ridesharing Not yet assigned Rideshare Program 1,400.0 17,674.1 1,570.0 62.1 28.7 $762,503 $494,078 $39,138 $440,593 $11,136,120 $24,108,721
Shared Ride Programs Vanpool Programs UT20020006 Expansion Of Uta Vanpool Leasing Program (Salt Lake And Ogden) 733.9 8,871.4 725.2 30.3 14.0 $128,200 $158,471 $13,110 $160,365 $3,832,426 $8,321,080
Shared Ride Programs Vanpool Programs UT20050005 Expansion Of Uta Vanpool Leasing Program (Ogden/ Layton) 781.1 9,061.0 837.8 34.9 16.1 $47,676 $55,372 $4,773 $51,622 $1,238,280 $2,685,195
Shared Ride Programs Vanpool Programs KY20060004 New Passenger Vans For Lextran 820.9 10,440.1 944.4 40.0 18.5 $30,643 $33,865 $2,663 $29,437 $694,959 $1,505,981
Shared Ride Programs Park-and-Ride Lots MD200017 I-95/Md 279 And I-95/Md 272 2.2 48.4 3.8 0.1 0.1 $20,497 $8,453,705 $384,182 $4,908,851 $128,188,176 $277,516,130
Shared Ride Programs Park-and-Ride Lots WI20000034, WI20000035 Lake Geneva Park And Ride 464.2 5,764.4 565.0 23.6 10.9 $7,408 $14,478 $1,166 $11,894 $284,595 $616,124
Shared Ride Programs Park-and-Ride Lots MD20020001 Md 210 At Md 373 Peak And Ride Construction 563.5 10,071.3 852.9 34.0 15.7 $180,050 $289,871 $16,218 $191,501 $4,802,166 $10,396,268
Shared Ride Programs Park-and-Ride Lots KY20050012 Tank - Walton/Union Park And Ride Development 460.7 6,677.2 612.1 25.2 11.6 $143,695 $282,971 $19,523 $212,970 $5,175,501 $11,204,505
Shared Ride Programs Park-and-Ride Lots WA20010004; WA20050035 Mountlake Terrace Station 1,487.7 18,475.8 1,810.9 75.7 35.0 $1,741,954 $1,062,245 $85,532 $872,653 $20,880,023 $45,203,414
TDM TDM CO20010042 Coordinate Telework Program 6,683.7 85,192.1 7,112.0 270.5 125.0 $116,371 $15,795 $1,239 $14,844 $390,221 $844,795
TDM TDM DC20020006 Employer Outreach And Bicycles Fy 2003 117.5 1,547.5 101.4 3.2 1.5 $18,832 $145,450 $11,040 $168,487 $5,417,471 $11,728,348
TDM TDM DC20050008 Fy06 Guaranteed Ride Home 50,604.3 637,587.5 57,326.3 2,284.5 1,055.2 $1,941,109 $34,798 $2,762 $30,718 $770,832 $1,668,784
TDM TDM RI20050010 Ozone Alert Days 61.2 788.6 61.1 2.2 1.0 $194,284 $2,879,727 $223,494 $2,882,338 $79,844,584 $172,856,506
Bicycle Pedestrian Bicycle Pedestrian MA20020040 Swansea Old Warren Rd. Bikeway Facility 138.0 1,834.8 111.6 3.2 1.5 $167,471 $1,100,607 $82,804 $1,361,137 $47,568,807 $102,982,286
Bicycle Pedestrian Bicycle Pedestrian IN20050009 Bike Path To Pinhook Park 35.7 475.1 28.9 0.8 0.4 $237,332 $6,023,188 $453,217 $7,440,882 $259,655,935 $562,132,272
Bicycle Pedestrian Bicycle Pedestrian Not yet assigned Bike Depot 126.2 1,504.1 104.3 3.1 1.4 $131,797 $947,239 $79,494 $1,146,475 $39,181,263 $84,823,991
Bicycle Pedestrian Bicycle Pedestrian Not yet assigned NYC Cyclistnet 715.4 8,524.0 591.0 17.3 8.0 $434,833 $551,441 $46,278 $667,428 $22,809,613 $49,380,807
Transit Improvements New Bus Services WI20000004 City Of Racine New Sunday Bus Service 150.8 0.0 166.4 0.0 0.0 $250,886 $1,509,283 $0 $1,367,788 $0 $0
Transit Improvements New Bus Services NY20050028 S92 New Bus Route 951.2 13,525.2 229.6 20.1 -0.4 $135,907 $129,618 $9,116 $537,083 $6,139,286 -$275,107,412
Transit Improvements New Bus Services RI20050003 Service Initiatives Route 30 And Route 12 729.2 18,952.9 1,343.8 48.6 22.4 $328,780 $409,027 $15,737 $221,962 $6,137,442 $13,287,023
Transit Improvements New Rail Services UT20020001 Light Rail Vehicles 4,592.3 54,122.7 4,524.7 161.0 74.4 $443,012 $87,514 $7,426 $88,822 $2,495,576 $5,402,702
Transit Improvements New Rail Services TX20030147 TRE Double Tracking Of Segments 16,644.3 207,403.7 18,194.1 708.4 327.2 $7,631,105 $415,928 $33,378 $380,497 $9,772,506 $21,156,615
Transit Improvements New Rail Services CT20050027 Rail Station Platforms And Bridge 1,716.0 30,670.7 2,597.5 103.6 47.8 $261,293 $138,134 $7,729 $91,257 $2,288,406 $4,954,197
Transit Improvements Service Upgrades/Amenities MA20020069 Fitchburg ITC Parking Garage 2,201.5 39,347.5 3,332.4 132.9 61.4 $92,327 $38,046 $2,129 $25,135 $630,289 $1,364,520
Transit Improvements Service Upgrades/Amenities MO20040023 Operation Welcome Aboard Infrastructure 709.1 9,105.4 723.0 26.6 12.3 $190,914 $244,252 $19,021 $239,538 $6,519,661 $14,114,492
Transit Improvements Service Upgrades/Amenities NY20040006 Suffolk County Transit Marketing Program 666.4 6,564.8 595.1 19.0 8.8 $123,607 $168,276 $17,081 $188,430 $5,911,468 $12,797,808
Transit Improvements Service Upgrades/Amenities OH20050008 Laketran AVL-MDT System 327.4 4,220.6 326.2 11.7 5.4 $538,585 $1,492,350 $115,766 $1,497,977 $41,600,710 $90,061,880
Transit Improvements Service Upgrades/Amenities Not yet assigned Commuter Rail And Utility Construction 1,162.9 20,785.1 1,760.3 70.2 32.4 $14,227 $11,098 $621 $7,332 $183,862 $398,046
Technology and Fuel Programs Conventional Bus Replacements MD20020008 100 Replacement Local Buses 5,610.0 0.0 62,337.0 0.0 0.0 $9,179,510 $1,484,405 $0 $133,589 $0 $0
Technology and Fuel Programs Conventional Bus Replacements Not yet assigned Ham - Sorta - 61 Replacement Buses 2,506.1 3,026.1 9,237.8 0.0 0.0 $2,353,541 $851,946 $705,551 $231,126 $0 $0
Technology and Fuel Programs Alternative Fuel Vehicles/Fueling Facilities ME20020020 Fast Fill Compressed Natural Gas Facility 719.7 0.0 553.8 0.0 0.0 $192,912 $243,173 $0 $316,011 $0 $0
Technology and Fuel Programs Alternative Fuel Vehicles/Fueling Facilities PA20020062 Alternative Fuel Buses 750.0 3,000.0 22,750.0 0.0 0.0 $2,428,240 $2,937,150 $734,288 $96,829 $0 $0
Technology and Fuel Programs Alternative Fuel Vehicles/Fueling Facilities CT20050025 Ct Clean Fuels Program 1,032.8 0.0 1,911.0 0.0 0.0 $172,670 $151,676 $0 $81,971 $0 $0
Technology and Fuel Programs Alternative Fuel Vehicles/Fueling Facilities Not yet assigned Purchase 3 Forty Foot Urban Transit Cng Buses 540.0 2,743.2 1,562.4 0.0 504.0 $375,688 $631,146 $124,241 $218,138 $0 $676,227
Dust Mitigation Dust Mitigation CA20040439 Graaf Avenue Paving Project 0.0 0.0 0.0 52,195.0 0.0 $20,817 $0 $0 $0 $362 $0
Dust Mitigation Dust Mitigation ID20040003 Lincoln Ave Sandpoint 0.0 0.0 0.0 45,633.1 0.0 $33,710 $0 $0 $0 $670 $0
Dust Mitigation Dust Mitigation ID20050017 Liquid De-Icer Truck 0.0 0.0 0.0 1,824,680.0 0.0 $29,865 $0 $0 $0 $15 $0
Freight/Intermodal Freight/Intermodal ME20000004 Rail Siding Construction 97.2 488.0 2,038.7 69.2 56.9 $41,096 $383,558 $76,393 $18,287 $538,502 $655,448
Freight/Intermodal Freight/Intermodal ME20020005 Rehab/Replace Tracks On Sprague Industrial Spur 24.9 148.3 830.6 21.5 17.7 $54,723 $1,997,735 $334,684 $59,767 $2,304,829 $2,805,363
Freight/Intermodal Freight/Intermodal PA20020059 PA20030090 Westmoreland Itc 2.2 250.8 4,374.3 86.2 70.8 $1,028,708 $424,194,830 $3,721,007 $213,345 $10,831,847 $13,184,175
Freight/Intermodal Freight/Intermodal NY20040036 Arlington Intermodal Yard 23,385.8 117,353.4 378,629.3 13,059.5 10,729.5 $949,286 $36,825 $7,338 $2,274 $65,942 $80,263
Freight/Intermodal Freight/Intermodal PA20040076 Norfolk Southern Rail Ext 1,058.5 5,256.4 19,944.8 690.0 566.9 $1,318,453 $1,130,019 $227,547 $59,970 $1,733,406 $2,109,846
Freight/Intermodal Freight/Intermodal CT20060022 Rail And Utility Construction 176.8 876.4 3,238.3 112.6 92.5 $174,141 $893,459 $180,259 $48,784 $1,402,472 $1,707,043
Engine Retrofit Technologies Diesel Engine Retrofits MD20010025 Bus Engine Upgrade 0.0 0.0 0.0 0.0 9,040.2 $5,094,530 $0 $0 $0 $0 $511,236
Engine Retrofit Technologies Diesel Engine Retrofits NY20040032 Wcdot Diesel Engine Retrofit Of 177 Transit Buses 1,059.7 16,446.5 0.0 0.0 823.4 $311,010 $266,254 $17,155 $0 $0 $342,657
Engine Retrofit Technologies Diesel Engine Retrofits PA20040011 Emissions Reduction Device 1,832.5 27,805.0 0.0 1,635.0 1,432.5 $371,869 $184,095 $12,133 $0 $206,333 $235,500
Engine Retrofit Technologies Diesel Engine Retrofits OR20050011 Exhaust After-Treatment Controls On Trash Collection Trucks 371.8 647.4 0.0 72.8 0.0 $12,457 $30,395 $17,456 $0 $155,229 $0
Engine Retrofit Technologies Diesel Engine Retrofits Not yet assigned 3 Locomotive Repowers 3,386.4 0.0 44,914.0 0.0 1,251.2 $1,042,808 $279,358 $0 $21,063 $0 $756,090
Engine Retrofit Technologies Diesel Engine Retrofits Not yet assigned Orangetown Diesel Vehicle Retrofits 134.2 521.6 0.0 54.9 42.7 $100,116 $676,780 $174,142 $0 $1,654,351 $2,127,022
Engine Retrofit Technologies Diesel Engine Retrofits Not yet assigned Diesel Engine Retrofits Of Rockland County Vehicles 42,800.7 295,801.2 0.0 42,196.8 38,393.4 $323,016 $6,847 $991 $0 $6,945 $7,632
Engine Retrofit Technologies Truck Stop Electrification TN20030011 Tse: Idleaire 100 Units Watt Rd. 0.0 0.0 49,275.0 1,343.2 1,343.2 $163,332 $0 $0 $3,007 $110,313 $110,313
Engine Retrofit Technologies Truck Stop Electrification KY20060013 50 Advance Travel Center Electrification (Idle Aire) 0.0 17,060.1 40,212.1 671.6 671.6 128,490.99 $0 $6,833 $2,899 $173,563 $173,563
Engine Retrofit Technologies Truck Stop Electrification TN20060026 Install Idleaire At Sites In Jefferson Co 0.0 0.0 29,072.3 792.1 792.1 $146,881 $0 $0 $4,583 $168,232 $168,232

FHWA Home | HEP Home | Feedback
FHWA