Placing firm power and firm peaking power rates from the Pick-Sloan Missouri Basin Program—Eastern Division into effect on an interim basis. Rate Order No. WAPA—135

November 14, 2007

72 FR 64067

Placing firm electric service rates from the Loveland Area Projects into effect on an interim basis. Rate Order No. WAPA–134

November 14, 2007

72 FR 64061

Notice of availablity and public hearing of the Big Stone II Power Plant and Transmission Project supplemental draft Enviornmental Impact Statement

October 26, 2007

72 FR 60843

Notice of record of decision and floodplain statement of findings of the San Lois Rio Colorado Progect. Western intends to enter into interconnection and construction agreements with NBR, and to contruct , own, operate, and maintain the transmission system additions in the U.S. that would allow the interconnection

October 12, 2007

72 FR 58074

Notice of order concerning transmission service rates placing firm and nonfirm transmission service rates for the Pacific Northwest-Pacific Southwest Intertie Project into effect on an interim basis. Rate Order No. WAPA-13

October 10, 2007

72 FR 57563

Notice of a draft study work plan for performing the Wind Hydropower Integration Feasibility Study

September 19, 2007

72 FR 53560

Fiscal Year 2008 base charge and rates for Boulder Canyon Project electric service provided by Western has been approved

September 4, 2007

72 FR 50676

Western is proposing changes to current regulations that require customers to prepare integrated resource plans (IRP)

August 21, 2007

72 FR 46570

Western intends to prepare an Environmental Impact Statement for rebuilding the Granby Pumping Plant-Windy Gap transmission line in Grand County, Colo.

August 10, 2007

72 FR 45040

Notice of final resource adequacy plan for load in the California Independent System Operator Corporation’s (CAISO) Balancing Authority Area

July 27, 2007

72 FR 41309

Notice of intent to prepare an Environmental Impact Statement and conduct scoping meetings; Notice of floodplain and wetlands involvement for the construction and operation of the proposed NextGen Energy Facilty, SD

July 27, 2007

72 FR 41307

Western's consideration of certain Public Utility Regulatory Policies Act standards set forth in the Energy Policy Act of 2005

July 11, 2007

72 FR 37759

Notice of order temporary extending transmission and ancillary service rates for the Colorado River Storage Project through Sept. 30, 2010. Rate Order WAPA-132

July 11, 2007

72 FR 37758

Record of decision - White Wind Farm, LLC has applied to Western to interconnect its proposed White Wind Farm Project to Western’s transmission system at the existing White Substation, near Brookings, SD

July 10, 2007

72 FR 37525

Request for letters of interest and comments from entities interested in an allocation of Federal power, to gather information to aid Western in determining the appropriate purposes for a proposed Post 2010 Pick-Sloan Missouri Basin Program—Eastern Division resource pool

June 25, 2007

72 FR 34680

Request for letters of interest to determine which eligible new customers may be interested in an allocation of Federal power, and to gather information and comments to aid Western in determining the appropriate purposes for a proposed Post 2009 Loveland Area Projects resource pool

June 25, 2007

72 FR 34679

Additional public meetings set to provide the public opportunity to review and comment on additional and revised transmission line routes and the scope of the environmental impact statetment for the Eastern Plains Transmission Project dated Aug. 2, 2006

June 4, 2007

72 FR 30792

Proposing revised rates for Pick-Sloan Missouri Basin Program—Eastern Division firm electric and firm peaking power service. Rate Order WAPA-135

May 31, 2007

72 FR 30372

Proposing revised rates for Loveland Area Projects firm electric service. Rate Order WAPA-134

May 31, 2007

72 FR 30370

Conducting a public process to propose a Final Resource Adequacy Plan for transactions in the CAISO Corporation’s Balancing Authority Area. Pending the development of this final RA Plan, Western has established interim RA Plans to facilitate its transactions in the CAISO Balancing Authority Area

April 25, 2007

72 FR 20528

Notice of proposed base charge and rates adjustment for the Boulder Canyon Project

February 14, 2007

72 FR 7026

Notice of intent to prepare an Environmenal Impact Statement for the Eastern Plains Transmission Project

January 19, 2007

72 FR 2507