Contacts
|
If you have any questions regarding which procedures you should be working to, please contact your project lead or your manager.
Administrative
ADEP General Administrative Plans & Procedures |
Top of page |
Procedure Identifier |
Title |
Effective
Date |
SOP-0002 |
Environmental Subcontracts Management
|
10/21/2008 |
SOP-4005, R0 |
Peer Review Process
|
3/4/2009 |
SOP-5228, R0 |
ADEP Reporting Requirements for Abnormal Events |
1/16/2009 |
EP-DIR-SOP-5006, R0 |
Control of Measurement and Test Equipment
|
6/11/2007 |
EP-DIR-SOP-8001, R0 |
Inspection, Test, and Acceptance
|
6/11/2007 |
EP-WES-SOP-4006, R0 |
Review of Projects for Impacts to Potential Release Sites (PRS) |
2/11/2008 |
EP-ERSS-SOP-5128, R0 |
Development, Review, and Documentation of Numerical Models |
1/25/2008 |
ENV-MAQ-226, R2 |
Loaning Radiation Survey Equipment to NON-LANL Organizations |
2/18/2005 |
ENV-MAQ-232, R3 |
Preparation of the Annual Environmental Surveillance Report |
12/12/2005 |
Air Quality
WES AIRNET |
Top of page |
Procedure Identifier |
Title |
Effective
Date |
SOP-5140, R0 |
AIRNET - Quality Assurance Project Plan for Radiological Air Sampling Network |
3/20/2009 |
SOP-5142, R0 |
AIRNET - Establishing and Using Action Levels |
4/7/2009 |
SOP-5143, R0 |
AIRNET - Environmental Sampling of Airborne Particulate Radionuclides |
4/2/2009 |
SOP-5144, R0 |
AIRNET - Sampling of Ambient Airborne Tritium |
4/2/2009 |
SOP-5145, R0 |
AIRNET - Calibration of Air Flow Rates at Sampling Stations |
4/2/2009 |
SOP-5146, R0 |
AIRNET - Maintenance of Air Sampling Pumps |
4/2/2009 |
SOP-5147, R0 |
AIRNET - Evaluation of Sampler Sites Against Siting Criteria |
4/7/2009 |
SOP-5150, R0 |
AIRNET - Installation of New AIRNET Stations |
4/7/2009 |
SOP-5151, R0 |
AIRNET - Maintenance of AIRNET Flow Control Panels |
4/2/2009 |
SOP-5152, R0 |
AIRNET - Installing and Programming the Radio Systems |
4/16/2009 |
SOP-5153, R0 |
AIRNET - Leak Checking Silica Gel Cartridges |
4/2/2009 |
SOP-5154, R0 |
AIRNET - Quarterly Compositing of Samples |
4/8/2009 |
SOP-5155, R0 |
AIRNET - Special Studies |
4/7/2009 |
SOP-5156, R0 |
AIRNET - Using the Roots Meter or Alicat Flow Controller to Calibrate Air Flow Calibrators |
3/24/2009 |
SOP-5157, R0 |
AIRNET - Using the Bell Prover to Calibrate Flow Calibrators |
4/2/2009 |
SOP-5173, R0 |
AIRNET - Sample Analyses for Unplanned Releases |
4/7/2009 |
SOP-5174, R0 |
AIRNET - Using High-Volume Air Samplers |
4/16/2009 |
SOP-5234, R0 |
Installing and Operating and Portable Solar-Powered AIRNET Station |
4/2/2009 |
RRES-MAQ-253, R0 |
Operating the Ecam |
|
ENV-MAQ-256, R2 |
Operating the Solar Tritium AIRNET Sampler |
2/8/2005 |
Data/Dose
ADEP Data Review & Management |
Top of page |
Procedure Identifier |
Title |
Effective
Date |
SOP-5141, R0 |
AIRNET - Analytical Chemistry Data Management and Review |
4/8/2009 |
SOP-5148, R0 |
AIRNET - Technical Evaluation of Data and Calculated Air Concentrations |
4/6/2008 |
SOP-5149, R0 |
AIRNET - Management of Field Data |
4/7/2009 |
SOP-5161, R0 |
Routine Validation of Volatile Organic Data |
6/10/2008 |
SOP-5162, R0 |
Routine Validation of Semivolatile Organic Compound (SVOC) Analytical Data |
6/30/2008 |
SOP-5163, R0 |
Routine Validation of Organochlorine Pesticide and PCB Analytical Data |
6/17/2008 |
SOP-5164, R0 |
Routine Validation of High Explosive Analytical Data |
6/17/2008 |
SOP-5165, R0 |
Routine Validation of Metals Analytical Data |
6/17/2008 |
SOP-5166, R0 |
Routine Validation of Gamma Spectroscopy, Chemical Separation Alpha Spectrometry, Gas Proportional Counting, and Liquid Scintillation Analytical Data |
6/30/2008 |
SOP-5167, R0 |
Routine Validation of General Chemistry Analytical Data |
6/30/2008 |
SOP-5168, R0 |
Routine Validation of LC/MS/MS High Explosive Analytical Data |
7/1/2008 |
SOP-5169, R0 |
Routine Validation of Dioxin Furan Analytical Data (EPA Method 1618 and SW-846 EPA Method 8290 |
6/3/2008 |
SOP-5170, R0 |
Routine Validation of Chlorinated Biphenyl Congener Analytical Data (EPA Method 1668A) |
7/1/2008 |
SOP-5171, R0 |
Routine Validation of Total Petroleum Hydrocarbons Gasoline Range Organics/Diesel Range Organics Analytical Data (Method 80151B) |
6/30/2008 |
SOP-5191, R0 |
Routine Validation of LC/MS/MS Perchlorate Analytical Data( SW-846 EPA Method 6850) |
6/30/2008 |
SOP-5221, R0 |
Preparing Solid Waste Management Unit and Area of Concern Master Files |
10/30/2008 |
SOP-5222, R0 |
Analytical Chemistry Analysis of Air Filters During an Emergency Event |
3/4/2009 |
SOP-5229, R0 |
Developing Data Quality Objectives |
3/4/2009 |
SOP-5230, R0 |
Groundwater - Level Data Processing, Review, and Validation
|
3/4/2009 |
EP-ERSS-SOP-5013, R0 |
Analytical Data Verification/Validation Process |
2/9/2007 |
EP-ERSS-SOP-5086, R0 |
Background Value Comparisons - Inorganic Chemicals |
2/9/2007 |
EP-ERSS-SOP-5087, R0 |
Background Value Comparisons - Radionuclides |
2/9/2007 |
EP-ERSS-SOP-5088, R0 |
Requesting, Using, and Performing Quality Assurance for Analytical Data Sets |
2/9/2007 |
EP-ERSS-SOP-5091, R0 |
Database Permissions and Change Management |
2/9/2007 |
SOP-5160, R0 |
Routine Meteorological Data Processing |
2/15/2008 |
ENV-MAQ-245, R1 |
Electronic Import, Validation, and Verification of Teom Data |
4/22/2005 |
ENV-MAQ-712, R1 |
Analytical Chemistry Data Management and Review for Soil, Foodstuffs and Biota |
1/5/2006 |
ENV-WQH-QP-027, R2 |
Managing Electronic Data |
6/30/2005 |
SOP-01.13, R0 |
Initiating and Managing Data Set Requests |
8/7/2003 |
SOP-01.17, R0 |
Potential Release Site Database Data Entry and Management |
10/12/2004 |
General Fieldwork
ADEP General Fieldwork |
Top of page |
Procedure Identifier |
Title |
Effective
Date |
SOP-5177, R0 |
AIRNET - Operation of the Portable Generator |
4/2/2009 |
SOP-5181, R0 |
Notebook Documentation for Waste & Environmental Services Technical Field Activities |
6/17/2008 |
SOP-5220, R0 |
EX-ID/PR-ID Project Reviews for the FFCA Project and Individual Permit |
10/29/2008 |
EP-ERSS-SOP-5018, R0 |
Integrated Fieldwork Planning and Authorization |
6/7/2007 |
EP-ERSS-SOP-5055, R0 |
General Instructions for Field Investigations |
2/9/2007 |
EP-ERSS-SOP-5056, R0 |
Sample Containers and Preservation |
10/16/2007 |
EP-ERSS-SOP-5058, R0 |
Sample Control and Field Documentation |
2/9/2007 |
EP-ERSS-SOP-5060, R0 |
Operational Guidelines for Taking Soil and Water Samples in Explosive Areas |
2/9/2007 |
ENV-WQH-SOP-051, R0 |
Site Access Vehicle Use |
4/7/2005 |
RRES-WQH-SOP-004, R4 |
Radio and Cellular Phone Usage |
6/29/2004 |
RRES-WQH-SOP-013, R5 |
Pontoon Boat Use |
10/11/2004 |
RRES-WQH-SOP-040, R0 |
TA-64 Field Operations Building |
5/19/2004 |
RRES-WQH-SOP-042, R1 |
Hand and Portable Power Tool Use |
6/30/2004 |
RRES-ES-Driving, R0 |
Driving and Towing Safety for All Employees |
8/6/2004 |
RRES-ES-Field, R0 |
General Field Safety for All Employees |
8/6/2004 |
EP-ERSS-SOP-5059, R0 |
Field Quality Control Samples |
2/9/2007 |
SOP-01.12, R0 ICN2 |
Field Site Closeout Checklist |
8/17/2005 |
QP-5.4, R0 |
Obtaining Access Agreements for Non-DOE-Owned Property |
8/31/2000 |
Soils/Foodstuffs
ADEP Soil, Foodstuffs, and Biota Sampling & Processing |
Top of page |
Procedure Identifier |
Title |
Effective
Date |
QAPP-0001, R0 |
Quality Assurance Project Plan for the Soil, Foodstuffs, and Biota Monitoring Project |
2/26/2008 |
SOP-5132, R0 |
Collection of Soil and Vegetation Samples for the Environmental Surveillance Program |
2/26/2008 |
SOP-5134, R0 |
Produce Sampling |
2/26/2008 |
SOP-5135, R0 |
Fish Sampling |
2/26/2008 |
SOP-5136, R0 |
Game Animal Sampling |
2/26/2008 |
SOP-5137, R0 |
Processing Biota Samples for Analysis |
2/26/2008 |
SOP-5139, R0 |
Sampling Soil and Vegetation at Facility Sites |
2/26/2008 |
RRES-MAQ-513, R0 |
Posting of Soil Contamination Areas |
12/10/2002 |
Water Quality
ADEP Groundwater, Spring, and Surface Water - Measurement & Sampling |
Top of page |
Procedure Identifier |
Title |
Effective
Date |
SOP-4009, R0 |
Consent Order 5-Day Public Notification Requirement for Groundwater Data |
1/16/2009 |
SOP-5223, R0 |
Manual GroundWater Level Measurements
|
10/29/2008 |
SOP-5224, R0 |
Spring & Surface Water Sampling
|
10/30/2008 |
SOP-5225, R0 |
Groundwater Sampling Using Pressure Probes Using Westbay System
|
10/29/2008 |
SOP-5226, R0 |
Westbay Pressure Transducer Installation, Removal, and Maintenance
|
10/30/2008 |
SOP-5227, R0 |
Pressure Transducer Installation, Removal, and Maintenance
|
10/29/2008 |
SOP-5232, R0 |
Groundwater Sampling |
2/24/2009 |
EP-ERSS-WSP-1003, R2 |
Groundwater Level Monitoring Project |
1/29/2007 |
ENV-WQH-QP-029, R2 |
Creating and Maintaining a Chain of Custody |
4/6/2006 |
ENV-WQH-SOP-014, R5 |
Large Generator Use for Pumping |
12/12/2005 |
ENV-WQH-SOP-043, R2 |
Gas Cylinder Pressure Systems |
12/1/2005 |
SOP-06.03, R3 |
Sampling for Volatile Organic Compounds in Groundwater |
3/8/2004 |
ADEP Well Drilling, Construction, Development, Maintenance, and Abandonment |
Top of page |
Procedure Identifier |
Title |
Effective
Date |
SOP-5204, R0 |
Analytical Data Qualification For Residual Effects of Drilling Products |
10/20/2008 |
EP-ERSS-SOP-5029, R0 |
Drilling Plan Development |
2/9/2007 |
EP-ERSS-SOP-5030, R0 |
Contract Geophysical Logging |
2/9/2007 |
EP-ERSS-SOP-5032, R0 |
Well Construction |
2/9/2007 |
EP-ERSS-SOP-5033, R0 |
Well Development |
2/9/2007 |
EP-ERSS-SOP-5034, R0 |
Monitor Well and RFI Borehole Abandonment |
2/9/2007 |
EP-ERSS-SOP-5061, R0 |
Field Decontamination of Equipment |
2/9/2007 |
EP-ERSS-SOP-5077, R0 |
Field Sampling of Core and Cuttings for Geological Analysis |
2/9/2007 |
EP-ERSS-WSP-1001, R0 |
Quality Assurance Project Plan for the Drilling Operations Project |
12/21/2006 |
ENV-WQH-SOP-015, R3 |
Down Hole Video Camera And Borehole Logging System Use |
3/13/2006 |
SOP-06.24, R2 |
Sample Collection from Split-Spoon Samplers and Shelby Tube Samplers |
12/23/2003 |
SOP-06.26, R2 |
Core Barrel Sampling for Subsurface Earth Materials |
1/14/2004 |
SOP-12.01, R4 |
Field Logging, Handling & Documentation of Borehole Materials |
4/27/2001 |
SOP-12.02, R4 |
Transportation & Admittance of Borehole Materials to the Field Support Facility |
6/19/2001 |
SOP-12.04, R2 |
Physical Processing & Storage of Borehole Samples at the SMF |
12/10/2001 |
|