Directive ID |
Subject |
Expiration Date |
NPR 8000.4A
|
Agency Risk Management Procedural Requirements |
December 16, 2013 |
NPD 8010.2E
|
Use of the SI (Metric) System of Measurement in NASA Programs |
March 4, 2012 |
NPD 8010.3A
|
Notification of Intent to Decommission or Terminate Operating Space Systems and Terminate Missions |
June 14, 2009 |
NPD 8020.7G
|
Biological Contamination Control for Outbound and Inbound Planetary Spacecraft (Revalidated 11/25/08) |
November 25, 2013 |
NPR 8020.12C
|
Planetary Protection Provisions for Robotic Extraterrestrial Missions |
April 27, 2010 |
NPD 8070.6C
|
Technical Standards |
February 4, 2013 |
NPD 8500.1B
|
NASA Environmental Management |
December 20, 2012 |
NPR 8530.1A
|
Affirmative Procurement Program and Plan for Environmentally Preferable Products |
June 4, 2009 |
NPR 8553.1A
|
NASA Environmental Management System (EMS) w/Change 2 (04/26/2006) |
March 22, 2010 |
NPR 8570.1
|
Energy Efficiency and Water Conservation w/Change 2 (4/04/08) REVALIDATED |
April 4, 2013 |
NPR 8580.1
|
Implementing The National Environmental Policy Act And Executive Order 12114 |
November 26, 2009 |
NPR 8590.1
|
NASA Environmental Compliance and Restoration (ECR) Program |
June 14, 2012 |
NPD 8610.6F
|
Graphic Markings on Space Transportation Vehicles, U.S. Components of the International Space Station Component Systems, and Payloads |
April 30, 2009 |
NPD 8610.7D
|
Launch Services Risk Mitigation Policy for NASA-Owned and/or NASA-Sponsored Payloads/Missions |
January 31, 2013 |
NPD 8610.12F
|
Office of Space Operations (OSO) Space Transportation Services for NASA and NASA-Sponsored Payloads |
February 23, 2010 |
NPD 8610.23C
|
Launch Vehicle Technical Oversight Policy |
August 18, 2011 |
NPD 8610.24B
|
Launch Services Program (LSP) Pre-Launch Readiness Reviews |
May 12, 2010 |
NPR 8621.1B
|
NASA Procedural Requirements for Mishap and Close Call Reporting, Investigating, and Recordkeeping |
May 23, 2011 |
NPD 8700.1E
|
NASA Policy for Safety and Mission Success |
October 28, 2013 |
NPD 8700.3B
|
Safety and Mission Assurance (SMA) Policy for NASA Spacecraft, Instruments, and Launch Services |
October 28, 2013 |
NPR 8705.2B
|
Human-Rating Requirements for Space Systems |
May 6, 2013 |
NPR 8705.4
|
Risk Classification for NASA Payloads (Revalidated July 9, 2008) |
July 9, 2013 |
NPR 8705.5
|
Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects |
July 12, 2009 |
NPR 8705.6
|
Safety and Mission Assurance Audits, Reviews, and Assessments |
October 4, 2010 |
NPD 8710.1D
|
Emergency Preparedness Program |
November 8, 2011 |
NPD 8710.2D
|
NASA Safety and Health Program Policy (Revalidated 4/28/04) |
April 24, 2009 |
NPD 8710.5D
|
Policy for Pressure Vessels and Pressurized Systems |
March 12, 2013 |
NPR 8715.1
|
NASA Occupational Safety and Health Programs w/Change 3 (02/13/06) |
September 30, 2011 |
NPR 8715.2A
|
NASA Emergency Preparedness Procedural Requirements |
January 9, 2014 |
NPR 8715.3C
|
NASA General Safety Program Requirements |
March 12, 2013 |
NPR 8715.5
|
Range Safety Program |
July 8, 2010 |
NPR 8715.6A
|
NASA Procedural Requirements for Limiting Orbital Debris |
February 19, 2013 |
NPR 8715.7
|
Expendable Launch Vehicle Payload Safety Program |
May 30, 2013 |
NPD 8720.1C
|
NASA Reliability and Maintainability (R&M) Program Policy |
April 18, 2013 |
NPD 8730.1B
|
Metrology and Calibration (Revalidated 4/29/04) |
August 13, 2009 |
NPD 8730.2C
|
NASA Parts Policy |
November 3, 2013 |
NPD 8730.5
|
NASA Quality Assurance Program Policy |
October 27, 2010 |
NPR 8735.1B
|
Procedures For Exchanging Parts, Materials, and Safety Problem Data Utilizing the Government-Industry Data Exchange Program and NASA Advisories |
December 28, 2012 |
NPR 8735.2A
|
Management of Government Quality Assurance Functions for NASA Contracts |
August 2, 2011 |
NPD 8800.14C
|
Policy for Real Property Management |
July 15, 2009 |
NPR 8800.15A
|
Real Estate Management Program Implementation Manual |
July 1, 2009 |
NPR 8810.1
|
Master Planning Procedural Requirements |
April 28, 2010 |
NPD 8810.2
|
Master Planning for Real Property |
October 7, 2009 |
NPD 8820.2C
|
Design and Construction of Facilities |
June 13, 2011 |
NPR 8820.2F
|
Facility Project Requirements |
January 28, 2013 |
NPD 8831.1E
|
Maintenance and Operations of Institutional and Program Facilities and Related Equipment (Revalidated June 16, 2008) |
June 19, 2013 |
NPR 8831.2E
|
Facilities Maintenance and Operations Management |
November 18, 2013 |
NPD 8900.1G
|
MEDICAL OPERATIONS RESPONSIBILITIES IN SUPPORT OF HUMAN SPACE FLIGHT PROGRAMS (Revalidated with admin. changes 5/25/07) |
May 25, 2012 |
NPR 8900.1
|
Health and Medical Requirements for Human Space Exploration |
May 23, 2013 |
NPD 8900.3G
|
ASTRONAUT MEDICAL AND DENTAL OBSERVATION STUDY AND CARE PROGRAM (Revalidated 2/27/08) |
January 8, 2013 |
NPD 8900.4C
|
NASA Use of Global Positioning System Precise Positioning Service (Revalidated 2/23/04) |
April 27, 2009 |
NPD 8900.5A
|
NASA Health and Medical Policy for Human Space Exploration |
May 16, 2011 |
NPD 8910.1B
|
Care and Use of Animals |
May 28, 2013 |
NPR 8910.1A
|
Care and Use of Animals |
March 15, 2009 |