Jump to main content.


Ocean Dredged Material Disposal Sites (ODMDS) in the Southeast

Most of the dredged material disposed in the ocean is disposed at ocean dumping sites specifically designated by EPA for dredged material disposal under section 102 of the Marine Protection, Research, and Sanctuaries Act (MPRSA). EPA designated sites are to be used for ocean disposal to the extent feasible.

All ocean dumping sites are required to have a site management and monitoring plan (SMMP). Appropriate management of ocean dumping sites is aimed at assuring that disposal activities will not unreasonably degrade or endanger human health, welfare, the marine environment or economic potentialities.

Management of ocean dredged material disposal sites involves:
  1. regulating the times, the quantity, and the physical/chemical characteristics of dredged material that is dumped at the site;
  2. establishing disposal controls, conditions, and requirements to avoid and minimize potential impacts to the marine environment; and
  3. monitoring the site environs to verify that unanticipated or significant adverse effects are not occurring from past or continued use of the disposal site and that permit terms are met.

Disposal Sites in the Southeast


To go to a specific site, select the site from the map or the site list.
General locations of dredged materials disposal sites in the southeastern US. Mobile, AL Canaveral Harbor, FL Fernadina Beach, FL Fort Pierce Harbor, FL Jacksonville, FL Miami, FL Palm Beach Harbor, FL Pensacola Nearshore, FL Pensacola Offshore, FL Port Everglades Harbor, FL Tampa, FL Brunswick Harbor, GA Savannah, GA Gulfport Eastern, MS Gulfport Western, MS Pascagoula, MS Morehead City, NC New Wilmington, NC Wilmington, NC Georgetown Harbor, SC Charleston, SC Port Royal, SC
AlabamaSkip site navigation list and go to site descriptions Mobile
FloridaSkip site navigation list and go to site descriptions Canaveral Harbor
Fernandina Beach
Fort Pierce Harbor
Jacksonville
Miami
Palm Beach Harbor
Pensacola Nearshore
Pensacola Offshore
Port Everglades Harbor
Tampa
GeorgiaSkip site navigation list and go to site descriptions Brunswick Harbor
Savannah
MississippiSkip site navigation list and go to site descriptions Gulfport Eastern Site
Gulfport Western Site
Pascagoula
North CarolinaSkip site navigation list and go to site descriptions Morehead City
New Wilmington
Wilmington
South CarolinaSkip site navigation list and go to site descriptions Charleston
Georgetown Harbor
Port Royal

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.


Alabama Dredged Material Disposal Sites

Mobile

Location: 30°10'00''N., 88°07'42''W.; 30°10'24''N., 88°05'12''W.; 30°09'24''N., 88°04'42''W.; 30°08'30''N., 88°05'12''W.; 30°08'30''N., 88°08'12''W.
Size: 4.8 square nautical miles
Depth: Average 14 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to dredged materials which meet the Ocean Dumping Criteria

list of sites

Florida Dredged Material Disposal Sites

Canaveral Harbor

Location: 28°20'15''N., 80°31'11''W.; 28°18'51''N., 80°29'15''W.; 28°17'13''N., 80°30'53''W.; 28°18'36''N., 80°32'45''W. Center coordinates: 28°18'44''N., 80°31'00''W. (NAD 27)
Size: 4 square nautical miles
Depth: Range 47 to 55 feet
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material from the greater Canaveral, Florida, vicinity
Management Plan: Canaveral ODMDS Site Management and Monitoring Plan (SMMP) - 2001 (PDF) (71 pp, 3.6MB)
Reports: Skip reports and return to site list Spatial Analysis of Sediment Grain Size - 2005 (PDF) (20 pp, 1.1MB)
Ocean Current and Wave Measurements - 2005 (PDF) (48 pp, 1.8MB)

list of sites

Fernandina Beach

Location: 30°33'00''N., 81°16'52''W.; 30°31'00''N., 81°16'52''W.; 30°31'00''N., 81°19'08''W.; 30°33'00''N., 81°19'08''W.
Size: Four square nautical miles
Depth: Average 16 meters
Primary use: Dredged material
Period of use: Continuing Use
Restriction: Disposal shall be limited to dredged material which meets the criteria given in the Ocean Dumping Regulations in 40 CFR part 227
Management Plan: Skip management plan reports and go to reports
Reports:

Fort Pierce Harbor

Location:

27°28'00''N., 80°12'33''W.; 27°28'00''N., 80°11'27''W.; 27°27'00''N., 80°11'27''W.; and 27°27'00''N.,80°12'33''W.

Size: 1 square nautical mile
Depth: Average range 40 to 54 feet
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material from the greater Fort Pierce Harbor vicinity. All dredged material consisting of greater than 10% fine grained material (grain size of less than 0.047mm) by weight shall be limited to that part of the site east of 80°12'00''W. and south of 27°27'20''N.
Management Plan:
Reports: Skip reports and return to site list

list of sites

Jacksonville

Location: 30°21'30''N., 81°18'34''W.; 30°21'30''N., 81°17'26''W.; 30°20'30''N., 81°17'26''W.; 30°20'30''N., 81°18'34''W.
Size: One square nautical mile
Depth: Ranges from 12 to 16 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to dredged material from the Jacksonville, Florida, area
Management Plan:
Reports: Skip reports and return to site list

list of sites

Miami

Location: 25°45'30''N 80°03'54''W; 25°45'30''N 80°02'50''W; 25°44'30''N 80°03'54''W; 25°44'30''N 80°02'50''W. Center coordinates are 25°45'00''N and 80°03'22''W.
Size: Approximately 1 square nautical mile
Depth: Ranges from 130 to 240 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material from the greater Miami, Florida vicinity. Disposal shall comply with conditions set forth in the most recent approved Site Management and Monitoring Plan
Management Plan:
Reports: Skip reports and return to site list

list of sites

Palm Beach Harbor

Location: (NAD83): 26°47'30"N., 79°57'09"W.; 26°47'30"N., 79°56'02"W.; 26°46'30"N., 79°57'09"W.; 26°46'30"N., 79°56'02"W. Center coordinates are 26°47'00"N and 79°56'35"W.
Size: Approximately 1 square nautical mile
Depth: Ranges from 525 to 625 feet
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material. Disposal shall comply with conditions set forth in the most recent approved Site Management and Monitoring Plan
Management Plan:
Reports:

list of sites

Pensacola Nearshore

Location: 30°17'24''N., 87°18'30''W.; 30°17'00''N., 87°19'50''W.; 30°15'36''N., 87°17'48''W.; 30°15'15''N., 87°19'18''W.
Size: 2.48 square nautical miles
Depth: Averages 11 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to dredged materials which are shown to be predominantly sand (defined by a median grain size greater than 0.125 mm and a composition of less than 10% fines) and meet the Ocean Dumping criteria

list of sites

Pensacola Offshore

Location: 30°08'50''N., 87°19'30''W.; 30°08'50''N., 87°16'30''W.; 30°07'05''N., 87°16'30''W.; 30°07'05''N., 87°19'30''W.
Size: Approximately 6 square statute mile
Depth: Ranges from 65 to 80 feet
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal is restricted to predominantly fine-grained dredged material from the greater Pensacola, Florida area that meets the Ocean Dumping Criteria but is not suitable for beach nourishment or disposal at the existing EPA designated Pensacola (Nearshore) ODMDS (Sec. 228.15(h)(11)). The Pensacola (Nearshore) ODMDS is restricted to suitable dredged material with a median grain size of greater than 0.125 mm and a composition of less than 10% fines.
Management Plan:

list of sites

Port Everglades Harbor

Location: (NAD83): 26°07'30"N., 80°02'00"W.; 26°07'30"N., 80°01'00"W.; 26°06'30"N., 80°02'00"W.; 26°06'30 N., 80°01'00"W. Center coordinates are 26°07'00"N and 80°01"30"W.
Size: Approximately 1 square nautical mile
Depth: Ranges from 640 to 705 feet
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material. Disposal shall comply with conditions set forth in the most recent approved Site Management and Monitoring Plan.
Management Plan:
Reports:

list of sites

Tampa

Location: 27°32'27''N 83°06'02"W; 27°32'27''N 83°03'46''W; 27°30'27''N 83°06'02''W; 27°30'27''N 83°03'46''W.
Size: Approximately 4 square nautical miles
Depth: Approximately 22 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material from the greater Tampa, Florida vicinity. Disposal shall comply with conditions set forth in the most recent approved Site Management and Monitoring Plan.
Management Plan:

list of sites

Georgia Dredged Material Disposal Sites

Brunswick Harbor

Location: 31°02'35''N., 81°17'40''W.; 31°02'35''N., 81°16'30''W.; 31°00'30''N., 81°16'30''W.; 31°00'30''N., 81°17'42''W.
Size: Approximately 2 square nautical miles
Depth: Average 9 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material from the greater Brunswick, Georgia, vicinity.
Management Plan:
Reports: Brunswick Harbor ODMDS 2006 Trend Assessment Survey (PDF) (54 pp, 1.5MB)

list of sites

Savannah

Location: 31°55'53''N., 80°44'20''W.; 31°57'55''N., 80°46'48''W.; 31°57'55''N., 80°44'20''W.; 31°55'53''N., 80°46'48''W.
Size: 4.26 square nautical miles
Depth: Averages 11.4 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to dredged material from the Savannah Harbor area.
Management Plan:
Reports: Savannah ODMDS 2006 Trend Assessment Survey (PDF) <(53 pp, 1.1MB)

list of sites

Mississippi Dredged Material Disposal Sites

Gulfport Eastern Site

Location: 30°11'10''N., 88°58'24''W.; 30°11'12''N., 88°57'30''W.; 30°07'36''N., 88°54'24''W.; 30°07'24''N., 88°54'48''W.
Size: 2.47 square nautical miles
Depth: 9.1 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to materials which meet the Ocean Dumping Criteria.

list of sites

Gulfport Western Site

Location: 30°12'00''N., 89°00'30''W.; 30°12'00''N., 88°59'30''W.; 30°11'00''N., 89°00'00''W.; 30°07'00''N., 88°56'30''W.; 30 °06'36''N., 88 °57'00''W.; 30 °10'30''N., 89 °00'36''W.
Size: 5.2 square nautical miles
Depth: 8.2 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to dredged material which meets the Ocean Dumping Criteria.

list of sites

Pascagoula

Location: 30°12'06''N., 88°44'30''W.; 30°11'42''N., 88°33'24''W.; 30°08'30''N., 88°37'00''W.; and 30°08'18''N., 88°41'54''W. Center coordinates: 30°10'09''N., 88°39'12''W.
Size: 18.5 square nautical miles
Depth: Average 46 feet, range 38-52 feet
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable material from the Mississippi Sound and vicinity.
Management Plan:
Reports: Pascagoula ODMDS 2006 Trend Assessment Survey (PDF) (48 pp, 932K)

list of sites

North Carolina Dredged Material Disposal Sites

Morehead City

Location: 34°38'30''N., 76°45'0''W.; 34°38'30''N., 76°41'42''W.; 34°38'09''N., 76°41'0"W.; 34°36'0''N., 76°41'0''W.;
34°36'0''N., 76°45'0''W.
Size: 8 square nautical miles
Depth: Average 12.0 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to dredged material from the Morehead City Harbor, North Carolina area. All material disposed must satisfy the requirements of the ocean dumping regulations.
Management Plan:

list of sites

New Wilmington

Location: 33°46'N.,78°02.5'W. 33°46'N., 78°01'W. 33°41'N., 78°01'W. 33°41'N., 78°04'W.
Size: Approximately 9.4 square nautical miles
Depth: Ranges from 35-52 feet
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material from the greater Wilmington, North Carolina vicinity. Disposal shall comply with conditions set forth in the most recent approved Site Management and Monitoring Plan
Management Plan:

list of sites

Wilmington

Location: 33°49'30''N., 78°03'06''W.; 33°48'18''N., 78°01'39''W.; 33°47'19''N., 78°02'48''W.; 33°48'30''N., 78°04'16''W.
Size: 2.3 square nautical miles
Depth: Averages 13 meters
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to the dredged material from Wilmington Harbor area.
Management Plan:

list of sites

South Carolina Dredged Material Disposal Sites

Charleston

Location: 32°38'06''N., 79°41'57''W.; 32°40'42''N., 79°47'30''W.; 32°39'04''N., 79°49'21''W.; 32°36'28''N., 79°43'48''W.
Size: 11.8 square nautical miles
Depth: Averages 11 meters
Primary use: Dredged material from the Charleston Harbor deepening project
Period of use: Continued use
Restriction: Disposal shall be limited to dredged material from the Charleston Harbor area. All dredged materials must be placed within the box defined by the following four corner coordinates (NAD83): 32.65663°N, 79.75716°W; 32.64257°N, 79.72733°W;
32.61733° N,79.74381°W; and 32.63142°N, 79.77367°W.

Additionally, all disposals shall be in accordance with all provisions of disposal placement as specified by the Site Management Plan, which is periodically updated.
Management Plan:
Reports:

list of sites

Georgetown Harbor

Location: 33°11'18''N., 79°07'20"W.; 33°11'18''N., 79°05'23''W.; 33°10'38''N., 79°05'24"W.; 33°10'38''N., 79°07'21''W.
Size: 1 square nautical mile
Depth: 6 to 11 meter range
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material from the greater Georgetown, South Carolina, area.
Management Plan:
Reports:

list of sites

Port Royal

Location: (NAD83): 32°05.00'N., 80°36.47'W.; 32°05.00'N., 80°35.30' W.; 32°04.00'N., 80°35.30'W.; 32°04.00'N., 80°36.47'W.
Size: Approximately 1.0 square nautical miles
Depth: Averages 36 feet
Primary use: Dredged material
Period of use: Continuing use
Restriction: Disposal shall be limited to suitable dredged material from the greater Port Royal, South Carolina, vicinity. Disposal shall comply with conditions set forth in the most recent approved Site Management and Monitoring Plan.
Management Plan:

Top of Page

For information about the contents of this page, please contact Christopher McArthur


Local Navigation


Jump to main content.