Home > Nuclear Reactors > New Reactors > Combined License Applications > Vogtle Nuclear Site, Units 3 and 4 Application
Vogtle Nuclear Site, Units 3 and 4 Application
|
Who: |
Southern Nuclear Operating Company (SNC)
|
What: |
Application for a combined license (COL) for two Westinghouse Advanced Passive 1000 (AP1000) Pressurized Water Reactors (PWRs) designated as Vogtle Units 3 & 4.
|
When: |
March 31, 2008 (date of application submittal)
|
Where: |
SNC's Vogtle site near Augusta in Burke County, Georgia |
|
On this page:
Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.
Reference Documents
Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
Date |
Description |
03/31/08 |
SNC's transmittal letter for Vogtle Units 3 & 4 COLA
- Part 1 - Administrative and Financial Information
- Part 2 - Final Safety Analysis Report (FSAR)
- Part 3 - Environmental Report
- Part 4 - Technical Specifications
- Part 5 - Emergency Plan
- Part 6 - [Not Used. Reserved for applicants requesting Limited Work Authorization (LWA)]
- Part 7 - Departure and Exemption Requests
- Part 8 - [This Part contains safeguards information which is with-held from public availability]
- Part 9 - [This Part contains other information which is with-held from public availability]
- Part 10 - Licensee Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITTAC)
- Part 11 - Enclosures
|
Application Review Schedule
Key Milestones |
Completion Date Actual - A Target - T |
Application Tendered |
03/31/08 - A |
Acceptance Review |
Acceptance Review Start |
04/07/08 - A* |
Docketing Decision Letter Issued/Acceptance Review Complete |
05/30/08 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
06/27/08 - A |
Safety Review |
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant |
01/14/09 - T |
Phase 2 - SER with Open Items issued |
07/22/09 - T |
Phase 3 - ACRS Review of SER with Open Items Complete |
11/20/09 - T |
Phase 4 - Advanced SER with no Open Items Issued |
07/10 - T |
Phase 5 - ACRS Review of SER with no Open Items Complete |
11/10 - T |
Phase 6 - Final SER Issued |
12/10 - T |
Environmental Review |
Phase 1 - Environmental impact statement (EIS) summary report issued |
N/A** |
Phase 2 - Draft EIS issued to EPA |
04/17/09 - T |
Phase 3 - Response to public comments on draft EIS issued |
08/20/09 - T |
Phase 4 - Final EIS issued to EPA |
01/15/10 - T |
Hearing |
Commission or ASLB hold mandatory hearing |
|
License |
Commission decision on issuance of COL application |
|
* Acceptance review start date is consistent with the guidance provided in RIS 2008-01.
**10 CFR 51.26(d) states that scoping is not required for a supplement to an EIS for a COL application that is submitted following a submittal of an early site permit application.
Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.
NRC Documents
Date |
Description |
09/10/08 |
Notice of Hearing and Opportunity to Petition to Intervene
|
06/27/08 |
Vogtle Units 3 and 4 Combined License Application Review Schedule
|
06/11/08 |
Notification of Docketing and Federal Register Notice
|
05/05/08 |
Acknowledgement of Receipt of Application and Federal Register Notice
|
Requests for Additional Information
Category |
RAI Date |
RAI Letter No. and Subject |
Applicant Response |
Safety |
08/18/08 |
RAI Letter No. 01 SRP Section 02.03.04
|
09/11/08 |
08/29/08 |
RAI Letter No. 02 SRP Sections 02.03.01, 02.03.05
|
09/18/08 |
10/06/08 |
RAI Letter No. 03 SRP Section 09.02.01
|
11/04/08 |
10/06/08 |
RAI Letter No. 04 SRP Section 09.02.05
|
11/04/08 |
10/06/08 |
RAI Letter No. 05 SRP Section 09.05.02
|
11/04/08 |
10/16/08 |
RAI Letter No. 06 SRP Section 07.05
|
11/14/08 - Non-Public |
10/17/08 |
RAI Letter No. 07 SRP Section 15.00.03
|
11/14/08 - Non-Public |
10/20/08 |
RAI Letter No. 08 SRP Section 02.03.01
|
11/18/08 - Non-Public |
11/04/08 |
RAI Letter No. 09 SRP Section 09.02.02
|
12/02/08 - Non-Public |
11/13/08 |
RAI Letter No. 10 SRP Section 11.02
|
|
11/13/08 |
RAI Letter No. 11 SRP Section 11.03
|
|
11/13/08 |
RAI Letter No. 12 SRP Section 6.4
|
|
11/13/08 |
RAI Letter No. 13 SRP Section 02.05.04
|
|
11/25/08 |
RAI Letter No. 14 SRP Section 17.5
|
|
11/26/08 |
RAI Letter No. 15 SRP Section 9.5.1
|
|
11/26/08 |
RAI Letter No. 16 SRP Section 9.5.1
|
|
Public Meetings
Date |
Description |
07/17/08 |
Southern Nuclear - Vogtle Units 3 and 4 COL Application Meeting on Technical Content.
|
04/17/08 |
Southern Nuclear - Vogtle Units 3 and 4 COL Application Meeting on Technical Content.
|
Contacts
Contacts for the Vogtle Nuclear Site COL Application |
Safety Project Manager |
Christian Araguas |
Sr. Environmental Project Manager |
Mark Notich |
Environmental Project Manager |
Michael Willingham |
Contact a Public Affairs Officer |
|