Grand Gulf, Unit 3 Application
|
Who: |
Entergy Operations, Inc. (EOI) [see Part 1 for additional details]
|
What: |
Application for a combined license (COL) for an Economic Simplified Boiling Water Reactor (ESBWR) designated as Grand Gulf Unit 3
|
When: |
February 27, 2008 (date of application submittal)
|
Where: |
EOI's Grand Gulf site near Port Gibson in Claiborne County, Mississippi |
|
On this page:
Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.
Reference Documents
Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
Date |
Description |
08/29/08 |
Entergy Responses to USNRC COL Information Needs for the Hydrology Safety Audit Items
|
08/27/08 |
Entergy USNRC COL Application: Semiannual Departures Report
|
07/24/08 |
Entergy Responses to USNRC COL Environmental Site Audit Requests for Electronic Files
|
06/30/08 |
Entergy Response to USNRC COL Acceptance Review Questions Regarding Methodology Used to Develop Horizontal and Vertical Site-Specific Hazard Consistent Uniform Hazard Response Spectra
|
06/13/08 |
Entergy Response to USNRC COL Acceptance Review Questions Regarding Geologic and Seismic Information
|
04/11/08 |
Entergy Response to USNRC COL Acceptance Review Question re: FEMA Acceptance Review of the Offsite Emergency Response Plans for the Grand Gulf Site
|
04/09/08 |
Entergy Response to USNRC COLA Acceptance Review Questions re: Geologic and Seismic Information
|
02/27/08 |
Entergy transmittal letter for Grand Gulf Unit 3 COLA
- Part 1 - General and Administrative Information
- Part 2 - Final Safety Analysis Report (FSAR)
- Part 3 - Environmental Report
- Part 4 - Technical Specifications
- Part 5 - Emergency Plan
- Part 6 - LWA/Site Redness Plan
- Part 7 - Departures (Variances, Supplemental Information) from the ESBWR Design Control Document (DCD)
- Part 8 - Security Plan [This Part contains safeguards information which is withheld from public availability]
- Part 9 - Withheld information [This part contains sensitive information which is withheld from public availability]
- Part 10 - Tier 1/Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
- Part 11 - Enclosures [QA Plan, Environmental Protection Plan]
|
Application Review Schedule
Key Milestones |
Completion Date Actual - A Target - T |
Application Tendered |
02/27/08 - A |
Acceptance Review |
Acceptance Review Start |
03/03/08 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
04/17/08 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
05/16/08 - A |
Safety Review |
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant |
01/23/09 - T |
Phase 2 - SER with Open Items issued |
09/04/09 - T |
Phase 3 - ACRS Review of SER with Open Items Complete |
12/09 - T |
Phase 4 - Advanced SER with no Open Items Issued |
09/10 - T |
Phase 5 - ACRS Review of SER with no Open Items Complete |
01/11 - T |
Phase 6 - Final SER Issued |
03/11 - T |
Environmental Review |
Phase 1 - Environmental Scoping Summary Report issued |
11/26/08 - A |
Phase 2 - Draft EIS issued to EPA |
05/19/09 - T |
Phase 3 - Response to public comments on draft EIS issued |
11/03/09 - T |
Phase 4 - Final EIS issued to EPA |
05/10 - T |
Hearing |
Commission or ASLB hold mandatory hearing |
|
License |
Commission decision on issuance of COL application |
|
Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.
NRC Documents
Date |
Description |
11/26/08 |
Environmental Scoping Summary Report
|
07/22/08 |
Trip Report - June 16 and 17, 2008, Hydrology-Related Site Visit in Support of Grand Gulf Unit 3 Combined License Application
|
06/25/08 |
Federal Register Notice for Hearing and Opportunity to Petition for Leave to Intervene for Grand Gulf Unit 3 COLA and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information for Contention Preparation
|
05/30/08 |
Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping Process
|
05/16/08 |
Grand Gulf Nuclear Station Unit 3 Combined License Application Review Schedule
|
04/17/08 |
Acceptance for Docketing of the Entergy Application for a Combined License for Grand Gulf Unit 3
|
03/10/08 |
Acknowledgement of Receipt of Application and Federal Register Notice
|
02/14/08 |
Acceptance Review Schedule for the Entergy Application for a Combined License for Grand Gulf Unit 3
|
Requests for Additional Information
Public Meetings
Date |
Description |
06/19/08 |
Public Scoping Meeting
|
03/19/08 |
Meeting regarding the technical content of the Grand Gulf Unit 3 COLA
|
03/06/08 |
Grand Gulf Unit 3 COLA Orientation
|
02/21/08 |
Public Outreach Meeting
|
Contacts
Contacts for the Grand Gulf COL Application |
Safety Project Manager |
Andrea Johnson |
Environmental Project Manager |
Tamsen Dozier |
Contact a Public Affairs Officer |
|