Combined License Applications for New Reactors
Location of Projected New Nuclear Power Reactors
Applications Received
Bell Bend Unit 1
Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
Nine Mile Point Unit 3
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

Shearon Harris Nuclear Site, Units 2 and 3 Application

Shearon Harris Nuclear Site
Who:   Progress Energy (PE)

What:   Application for a combined license (COL) for two Westinghouse Advanced Passive 1000 (AP1000) Pressurized Water Reactors (PWR) designated as Harris Units 2 & 3.

When:   February 19, 2008 (date of application submittal)

Where:   PE's Harris site near New Hill in Wake County, North Carolina

On this page:

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Date Description
02/18/08 PE's transmittal letter for Shearon Harris Nuclear Station Units 2 & 3 COLA
  • Part 0 - Cover Letter, Affidavits, etc
  • Part 1 - Administrative and Financial Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - [Not Used. Reserved for applicants requesting Limited Work Authorization (LWA)]
  • Part 7 - Departure and Exemption Requests
  • Part 8 - [This Part contains safeguards information which is with-held from public availability]
  • Part 9 - [This Part contains other information which is with-held from public availability]
  • Part 10 - Licensee Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITTAC)

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 02/19/08 - A
Acceptance Review
Acceptance Review Start
02/20/08 - A
Docketing Decision Letter Issued/Acceptance Review Complete
04/17/08 - A
Review Schedule Established/Schedule Letter Issued to Applicant
05/16/08 - A
Safety Review
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant
11/26/08 - A
Phase 2 - SER with Open Items issued
07/22/09 - T
Phase 3 - ACRS Review of SER with Open Items Complete
01/07/10 - T
Phase 4 - Advanced SER with no Open Items Issued
10/31/10 - T
Phase 5 - ACRS Review of SER with no Open Items Complete
02/28/11- T
Phase 6 - Final SER Issued
04/30/11 - T
Environmental Review
Phase 1 - Environmental impact statement (EIS) summary report issued
11/18/08 - A
Phase 2 - Draft EIS issued to EPA
06/26/09 - T
Phase 3 - Response to public comments on draft EIS issued
11/30/09 - T
Phase 4 - Final EIS issued to EPA
05/31/10 - T
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

To top of page

NRC Documents

Date Description
11/18/08 Environmental Scoping Summary Report
06/11/08 Correction of Notice of Intent to Prepare and Environmental Impact Statement and Conduct Scoping Process
06/04/08 Federal Register Notice Regarding Opportunity to Petition for Leave to Intervene
05/25/08 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Related to a Combined License for Shearon Harris Nuclear Power Plant, Units 2 and 3
05/16/08 Shearon Harris, Units 2 & 3, Combined License Application Review Schedule
04/23/08 Notification of Docketing and Federal Register Notice
03/11/08 Acknowledgment of Receipt of Application and Federal Register Notice

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Safety 08/01/08 RAI Letter No. 01 SRP Section 02.03.02 08/29/08
08/12/08 RAI Letter No. 02 SRP Section 02.03.03 09/05/08
08/13/08 RAI Letter No. 03 SRP Section 02.03.04 09/05/08
08/13/08 RAI Letter No. 04 SRP Section 02.03.05 09/11/08
08/18/08 RAI Letter No. 05 SRP Section 02.03.01 09/17/08
08/18/08 RAI Letter No. 06 SRP Section 02.02.03 09/17/08
08/21/08 RAI Letter No. 07 SRP Section 02.02.01 & 02.02.02 09/17/08
09/16/08 RAI Letter No. 08 SRP Section 07.05 10/29/08
09/17/08 RAI Letter No. 09 SRP Section 02.04.03 10/31/08
09/18/08 RAI Letter No. 10 SRP Section 02.04.12 10/31/08
09/22/08 RAI Letter No. 11 SRP Section 9.2.5 10/27/08
09/22/08 RAI Letter No. 12 SRP Section 9.3.3 10/20/08
09/22/08 RAI Letter No. 13 SRP Section 9.5.1 10/22/08
09/22/08 RAI Letter No. 14 SRP Section 9.2.1 10/27/08
09/23/08 RAI Letter No. 15 SRP Section 06.04 10/22/08
09/24/08 RAI Letter No. 16 SRP Section 19 10/29/08
09/25/08 RAI Letter No. 17 SRP Section 02.05.04 10/31/08
09/25/08 RAI Letter No. 18 SRP Section 02.05.02 12/09/08 - Non-Public
09/25/08 RAI Letter No. 19 SRP Section 02.05.04 11/17/08
09/26/08 RAI Letter No. 20 SRP Section 02.05.04 12/03/08
11/24/08
09/26/08 RAI Letter No. 21 SRP Section 13.30  
09/25/08 RAI Letter No. 22 SRP Section 10.04.05 10/29/08
09/26/08 RAI Letter No. 23 SRP Section 02.04.03 10/31/08
10/02/08 RAI Letter No. 24 SRP Section 03.07.04 11/06/08
10/03/08 RAI Letter No. 25 SRP Section 17.5 11/06/08
10/06/08 RAI Letter No. 26 SRP Section 11.02 11/24/08
10/06/08 RAI Letter No. 27 SRP Section 11.03 11/07/08
10/06/08 RAI Letter No. 28 SRP Section 17.5 11/13/08
10/16/08 RAI Letter No. 29 SRP Section 01 11/20/08 - Non-Public
10/14/08 RAI Letter No. 30 SRP Section 02.05.01  
10/15/08 RAI Letter No. 31 SRP Section 06.04 11/17/08 - Partial Response
10/15/08 RAI Letter No. 32 SRP Section 14.02 11/11/08
10/23/08 RAI Letter No. 33 SRP Section 15.00.03 11/25/08
10/23/08 RAI Letter No. 34 SRP Section 08.02 12/09/08 - Non-Public
10/24/08 RAI Letter No. 35 SRP Section 08.02 12/10/08 - Non-Public
10/27/08 RAI Letter No. 36 SRP Section 13.03 12/03/08
10/31/08 RAI Letter No. 37 SRP Section 03.02.01 12/10/08 - Non-Public
11/01/08 RAI Letter No. 38 SRP Section 03.02.01 12/10/08 - Non-Public
11/01/08 RAI Letter No. 39 SRP Section 03.02.01 12/12/08 - Non-Public
11/01/08 RAI Letter No. 40 SRP Section 03.02.02 12/12/08 - Non-Public
11/01/08 RAI Letter No. 41 SRP Section 03.10 12/12/08 - Non-Public
11/01/08 RAI Letter No. 42 SRP Section 03.02.01  
11/01/08 RAI Letter No. 43 SRP Section 03.02.02  
11/03/08 RAI Letter No. 44 SRP Section 03.08.05 12/26/08 - Non-Public
11/03/08 RAI Letter No. 45 SRP Section 03.07.02 12/30/08 - Non-Public
11/05/08 RAI Letter No. 46 SRP Section 03.06.02 12/12/08 - Non-Public
11/12/08 RAI Letter No. 47 SRP Section 03.07.02 12/09/08 - Non-Public
11/13/08 RAI Letter No. 48 SRP Section 03.06.02  
11/18/08 RAI Letter No. 49 SRP Section 13.1.1 12/16/08 - Non-Public
11/18/08 RAI Letter No. 50 SRP Section 13.3 12/22/08 - Non-Public
11/25/08 RAI Letter No. 51 SRP Section 10.04.06 12/16/08 - Non-Public
Environmental 11/13/08 RAI Regarding the environmental review of the combined license application for Shearon Harris Nuclear Power Plant, Units 2 and 3  

To top of page

Public Meetings

Date Description
06/10/08 Harris Public Scoping Meeting
03/06/08 Harris S-COLA Orientation
09/18/07 Public Outreach

To top of page

Contacts

Contacts for the Shearon Harris Nuclear Site COL Application
Safety Project Manager Manny Comar
Sr. Environmental Project Manager Donald Palmrose
Environmental Project Manager Bruce Olson
Contact a Public Affairs Officer

To top of page



Privacy Policy | Site Disclaimer
Wednesday, January 07, 2009