The Bay Area Air Quality Management District's
Compliance and Enforcement Division publishes Advisories to inform the
regulated community about activities of the District which may affect
their operation. It is hoped that these advisories will assist you in
your efforts to achieve and maintain compliance with applicable air pollution
rules and regulations.
Year |
Date |
Agriculture Related |
2008 |
02/07 |
New
Califorina Air Toxic Control Measure (ATCM) Registration and Emission
Standards for Agricultural Diesel Engines |
|
Year |
Date |
Asbestos Demolition and Renovation |
2008 |
06/10 |
Asbestos Demolition &
Renovation Fees Increase |
2007 |
06/20 |
Asbestos Demolition & Renovation
Fees Increase |
2006 |
06/21 |
Asbestos Control
Requirements for Pipe Bursting and Pipe Reaming |
2004 |
06/08 |
Asbestos Demolition & Renovation
Fees Increase |
2003 |
07/14 |
Asbestos
Demolition & Renovation Fees for Owner-Occupied Condominiums |
|
06/02 |
Floor
Mastic Removal with Mechanical Buffer Subject to Asbestos Regulations |
1993 |
02/04 |
Applicability Determination
- Sheetrock Joint Compound |
|
Year |
Date |
Asbestos Air Toxic Control Measure (ATCM) |
2008 |
03/04 |
Permit
Advisory - Airborne Toxic Control Measure (ATCM) for Chromium Plating
and Chromic Acid Anodizing Facilities |
2006 |
08/08 |
Asbestos
Airborne Toxic Control Measure (ATCM) for Construction and Grading
Projects |
2002 |
11/19 |
Asbestos
ATCM for Naturally-Occurring Asbestos (NOA) at Construction, Grading,
Quarrying, and Surface Mining Operations
|
|
Year |
Date |
Coatings |
2002 |
12/12 |
Lower
Standards for Some Architectural Coatings |
|
Year |
Date |
Combustion Equipment |
2008 |
06/10 |
New
Regulation 9, Rule 8, Nitrogen Oxide and Carbon Monoxide Emission
Limits for Stationary Internal Combustion Engines (effective January
1, 2012) |
|
01/17 |
New
Regulation 9, Rule 6, Emission Limits for Natural Gas-Fired Water
Heaters and Boilers (applicable to Manufacturers, Vendors And Installers) |
|
Year |
Date |
Dry Cleaner |
2008 |
07/01 |
New
State Airborne Toxic Control Measure (ATCM) Requirements for Emissions
of Perchloroethylene (PERC) from Dry Cleaning Operations
|
1999 |
09/01 |
Dry
Cleaners: Advisory For Regulation 11, Rule 16: Perchloroethylene and
Synthetic Solvent Dry Cleaning Operations |
|
Year |
Date |
Flares |
2007 |
06/25 |
Required
Content for Regulation 12-12 Flare Causal Analysis Reports |
2006 |
08/01 |
All
Refinery Projects That Impact Flare Use must be Included in an Updated
Flare Minimization Plan (FMP) Prior to Commencing Construction |
2005 |
08/16 |
Flare Notification
Requirements at Petroleum Refineries |
2004 |
06/09 |
Flare Monitoring at Petroleum
Refineries |
|
Year |
Date |
Gasoline Dispensing Facilities(GDF)/Service Stations |
2008 |
06/26 |
Operators
of Retail Underground Gasoline Tanks - Enhanced Vapor
Recovery (EVR) Phase II Deadline April 1, 2009
|
|
06/26 |
Operators
of Non-Retail Underground Gasoline Tanks - Enhanced
Vapor Recovery (EVR) Phase II Deadline April 1, 2009 |
2007 |
06/07 |
GDF Contractors
and Owner/Operators - New Source Test Notification and Results Submission
Procedures |
2006 |
04/03 |
Operators
of Underground Gasoline Tanks - Phase
I “Out of Order” Tags on Bulk Fueling Delivery Points |
|
04/03 |
Gasoline
Bulk Fuel Delivery Drivers - Phase
I “Out of Order” Tags on Bulk Fueling Delivery Points |
2005 |
08/17 |
Operators
of Underground Gasoline Tanks - Onboard Refueling Vapor Recovery (ORVR)
Compatibility Deadlines |
|
03/30 |
Operators of Underground
Gasoline Tanks - Enforcement Policy for Enhanced Vapor Recovery Phase
I Deadline |
|
03/16 |
Operators of Underground
Gasoline Tanks - Enhanced Vapor Recovery Phase I Deadlines |
2004 |
08/30 |
Operators of Underground Storage
Tanks - Enhanced Vapor Recovery Deadlines |
|
05/17 |
Permit Advisory - Remote Vapor
Check Valves No Longer Allowed on Balance Systems |
|
05/05 |
Permit Advisory - Drain
Valves on Vapor Spill Boxes No Longer Allowed |
|
01/20 |
Maintenance
and Testing Contractors - Gilbarco VaporVac Systems |
2003 |
12/11 |
Operators of Underground
Storage Tanks - Enhanced Vapor Recovery Deadlines |
|
07/14 |
Gasoline
Tank Operators, July 14, 2003 Targeted for San Mateo County Facilities
|
|
05/21 |
Testing
Deadline, May 21, 2003 |
|
02/26 |
Gasoline
Dispensing Facilities - Expanded Annual Testing Requirements. |
|
02/24 |
Gasoline
Dispensing Facilities - Unihose Dispensers Required for New/Modified
Installations. |
|
02/06 |
Gasoline Dispensing
Facilities - Updated Title 17 List of Significant Defects |
|
01/16 |
Gasoline
Dispensing Facilities - Title 17 List of Significant Defects Updated
and Expanded. |
2002 |
08/16 |
Gasoline
Dispensing Facilities - New Enhanced Vapor Recovery Phase I Equipment
Requirements. |
2000 |
10/15 |
Gasoline
Dispensing Facilities - Information Required on All Source Test Submittals
and Where to Submit Them. |
|
04/17 |
Gasoline
Dispensing Facility (GDF): Permit Application Advisory for Regulation
8, Rule 7: Gasoline Dispensing Facilities. |
1999 |
12/02 |
Operators
Of Non Retail Gasoline Dispensing Facilities: Advisory For Regulation
8, Rule 7: Gasoline Dispensing Facilities. |
|
Year |
Date |
Marine Terminal Operators/Marine Vessels |
2007 |
01/26 |
New Operational,
Notification, and Reporting Requirements for Marine Tank Vessels
(For a Word version of the 8-44 Notification/Exemption form click
here) |
2005 |
03/08 |
Venting, Cleaning, and Gas
Freeing of Marine Tank Vessels |
|
Year |
Date |
Natural Gas Production Facilities |
2006 |
07/05 |
Liquid Storage in
Tanks, Permits and Petitions |
|
Year |
Date |
Open Burning |
2006 |
08/24 |
Approval
Procedures for Fall 2006 Marsh Burn Season |
|
02/09 |
New
Procedures for Spring Marsh Burning |
2005 |
05/03 |
Prohibition
on Burning Chemically Treated Wooden Grapestakes |
2003 |
11/24 |
Changes to Burn Notification Policies and
Procedures |
|
11/25 |
Hazardous Material Fires Without
Fire Official Authorization |
2002 |
08/27 |
Expanded
and Revised Notification Requirements |
|
08/01 |
More
Restrictive Burn Hour Conditions |
2001 |
07/19 |
Change
in Burn Forecasting Procedures |
2000 |
04/04 |
Burning
Hours for Wildlife Management Burns |
|
Year |
Date |
Power Crisis |
2001 |
02/15 |
The
Power Crisis and Compliance - Advisory #2, |
|
02/15 |
The
Power Crisis and Compliance - Advisory #1, |
|
Year |
Date |
Reportable Compliance Activities (RCA) |
2006 |
06/30 |
Reportable Compliance Activity (RCA)
Policies (previously referred to as "Episodes") |
2005 |
01/14 |
CEM - Revision to Span Gas Protocol |
2004 |
12/03 |
Breakdown Excess Emission
Calculations and Reporting |
|
Year |
Date |
Soil Excavation |
2003 |
08/01 |
Soil
Excavation and Tank Removal Contractors |
|
Year |
Date |
Solid Waste Disposal Sites |
2002 |
11/21 |
Key
Regulatory Requirements and Compliance Dates for Operators of Solid
Waste Disposal Sites |
1999 |
12/09 |
Operators
Of Solid Waste Disposal Sites: Advisor For Regulation 8, Rule 34:
Organic Compounds, Solid Waste Disposal Sites |
|
Year |
Date |
Solvent Cleaning |
2004 |
03/08 |
Annual
Reports for Users of Halogenated Solvent Cleaners |
2003 |
05/27 |
Surface
Preparation and Cleanup for Printed Circuit Board Manufacturers |
|
01/13 |
New
Standards for Wipe Cleaning (Surface Preparation and Clean-up) Solvents |
|
01/13 |
New
Standards for Repair and Maintenance Cleaning Operations |
|
Year |
Date |
Tank Removal |
2003 |
08/01 |
Soil
Excavation and Tank Removal Contractors |
|
Year |
Date |
Title V Permitted Facilities (Major Facilities) |
2008 |
05/12 |
Petroleum
Refinery and Chemical Plant Operators: Restricted Operations upon
Predicted Excess of Federal and State Ozone Standards |
|
01/17 |
New
Regulation 9, Rule 9, Requirements for Stationary Gas Turbines |
2007 |
07/11 |
New Regulation 8, Rule 28,
Atmospheric Pressure Relief Devices Reporting and Demonstration Requirements |
|
06/15 |
New Operational and Reporting Requirements
for Regulation 8, Rule 5, Organic Liquid Storage Tanks |
2005 |
11/08 |
Reporting and Identification
Requirements for Regulation 8, Rule 18, Equipment Leaks |
|
09/14 |
Petroleum Refineries
Wastewater Collection System Reporting Requirements |
|
01/14 |
CEM - Revision to Span Gas Protocol |
2004 |
10/13 |
Process Vessel Depressurization
at Refineries and Chemical Plants; Reg. 8-10 |
|
06/14 |
Deviation Reporting Reminder
for Regulation 2, Rule 6; Major Facility Review |
2000 |
04/14 |
Title
V Facilities: Advisory for Regulation 2, Rule 6: Major Facility Review |