Department of Health and Human Services with stylized eagle made up of silhouetted human faces C D C
Department of Health and Human Services
Centers for Disease Control and Prevention

National Institute for Occupational Safety and Health (NIOSH)
Search NIOSH NIOSH Home NIOSH Topics Site Index Databases and Information Resources NIOSH Products Contact Us

NIOSH Program Area:

Office of Compensation Analysis and Support (OCAS)

 

Bethlehem Steel Company
(Site Profile Number 011)

Location: Lackawanna, New York

Technical Basis Document

Basis for Development of an Exposure Matrix for Bethlehem Steel Company
(Approved July 27, 2006)
this document in PDF PDF 395 KB (41 pages)

Revision Includes: Approved issue of Revision 0 of OCAS-TKBS-003. This supersedes rev. 1 of the previous ORAUT-TBKS-0001.

An Exposure Matrix indicates the type and quantity of radiation exposure to individuals for a specific location and specific time. Locations can be as broad as an entire facility or as narrow as a single small room. Time can be years, months, or even a single event. When personnel monitoring data are incomplete or do not exist, an exposure matrix is developed to estimate the dose. The matrix is typically developed using a combination of personnel monitoring data in conjunction with area monitoring data. Once the exposure is estimated, data about how long the worker was exposed (time) is used to estimate their total exposure.

There was no identified documentation that contained personal monitoring data for employees of the Bethlehem Steel site. Therefore, an exposure matrix that relied on air sampling data was developed to estimate radiation dose to many individuals. The matrix that was developed can be used to estimate the dose for a large number of the employees at the Bethlehem Steel site.

In many cases, the development of a facility specific matrix is more difficult but due to the limited operations that took place in this AWE, this matrix was able to be developed more quickly. The following documented facts were used in the development of this matrix:

  1. Uranium processing occurred on one rolling mill.

  2. The amount of time involving work with uranium was no more than 500 hours total over a four year period.
Because of these two facts, the workplace exposure conditions could be estimated from the available data. Once the workplace exposures were estimated, Bethlehem Steel employees are then assumed to be exposed to these "worst-case scenario" conditions as a claimant favorable approach.

Top of Page

Technical Information Bulletins (TIBs)

At the current time, there are no TIBs for Bethlehem Steel Company.

Top of Page

Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)

NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the compensability of a completed dose reconstruction may be effected, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.

  • Evaluation of the Effect of Adding Ingestion Intakes to Bethlehem Steel Cases
    this document in PDF PDF 31 KB (3 pages)

    Document Number: OCAS-PER-0003 Rev-00

    About this Document: Describes the evaluation of the programmatic effect of the effect of adding ingestion intakes to Bethlehem Steel cases.

    Approved: January 28, 2005

    Summary: As a result of adding ingestion intakes, the probability of causation of none of the previously completed Bethlehem Steel claims would increase to greater than 50%.


  • Evaluation of the Effect of Revision 2 of the Site Profile on Previously Completed Bethlehem Steel Cases
    this document in PDF PDF 42 KB (7 pages)

    Document Number: OCAS-PER-0007 Rev-00

    About this Document: New document to evaluate the effect of revision 2 of the site profile on previously completed dose reconstructions from Bethlehem Steel.

    Approved: November 9, 2006

    Summary: The Bethlehem Steel Technical Basis Document was revised on July 27, 2006. The revision changed the estimated quantity of uranium inhaled and ingested as well as external dose to the skin. As a result of revisions to the Bethlehem Steel Technical Basis Document, three claims that were previously determined to have a PC of less than 50% will now have a PC greater than 50%. Eight cases that previously had a PC greater than 50% now have a PC less than 50%. This report, along with detailed information on the specific cases and calculations, has been provided to DOL for determination of further action.


Top of Page

Worker Outreach Activities

Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.

At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.

Below are the Worker Outreach Activities for the Bethlehem Steel Company:

Top of Page

Comments on Bethlehem Steel Company Documents

How to Submit Comments
Comments on Bethlehem Steel Company documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include the Site Profile Number (011) on all comments.

Comments Received

Top of Page

Special Exposure Cohort Petition Information for Bethlehem Steel Company

  • Submissions Not Qualifying for Evaluation
    Two separate submission were received but did not qualify for evaluation because one submission did not meet the minimum petition requirements and the other submission was withdrawn by the applicant.


  • Petition Information
    • Location: 10 inch Bar Mill and Blooming Mill

      Job Titles and/or Job Duties: Millwrights, welders, electricians, bricklayers, carpenters, all maintenance, testers, rollers, supervisors, crane operators, hookers, clean-up crews, grinders

      Period of Employment: 1949 through 1952

    • Federal Register Notice Announcing that the Bethlehem Steel Corporation SEC Petition has met the Minimum Qualifications for Review and Evaluation
      September 7, 2006
      this document in PDF PDF 45 KB (1 page)

    • Copy of the Petition Received
      Bethlehem Steel Company SEC Petition
      this document in PDF PDF 4.1 MB (10 pages)

      Attachments to the petition:

      13" Bar Mill: Lackawanna Plant (brochure)
      this document in PDF PDF 2.1 MB (5 pages)

      Photo of cooling bed
      this document in PDF PDF 493 KB (1 page)

      Sketch of cooling tables
      this document in PDF PDF 717 KB (1 page)

    • SEC Petition Evaluation Report
      Bethlehem Steel Company SEC Petition Evaluation Report
      this document in PDF PDF 202 KB (53 pages)

    • Petition to be Discussed by the Advisory Board
      The Advisory Board discussed the petition on May 3, 2007; July 18, 2007; January 9, 2008; and April 9, 2008, during its regular meetings.

    • Advisory Board Recommendation on SEC Petition
      The Advisory Board has not discussed the petition at this time.

    • NIOSH Letter to HHS Regarding the SEC Petition
      Not completed at this time.

    • HHS Letter to Congress Regarding the SEC Petition
      Not applicable at this time.
      (Note: this only applies if the class is added to the SEC.)

    • Federal Register Notice: Designation of a Class of Employees for Addition to the Special Exposure Cohort
      Not applicable at this time.
      (Note: this only applies if the class is added to the SEC.)

    • HHS Designation of Additional Members to the SEC
      Not applicable at this time.
      (Note: this only applies if the class is added to the SEC.)

    • Effective Date for the SEC Class
      Not applicable at this time.
      (Note: this only applies if the class is added to the SEC.)

    • Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort
      Not applicable at this time.
      (Note: this only applies if the class is added to the SEC.)

    • Letter to DOL Regarding the Addition of a New Class of Employees to the SEC
      Not applicable at this time.
      (Note: this only applies if the class is added to the SEC.)

    • Letter from DOL Regarding the Return of All Cases for the New SEC Class
      Not applicable at this time.
      (Note: this only applies if the class is added to the SEC.)

Top of Page

Previous Versions of Bethlehem Steel Company Documents

  • Basis for Development of an Exposure Matrix for Bethlehem Steel Company

    • Revised June 29, 2004
      this document in PDF PDF 161 KB (13 pages)

      Revision Includes: Revision to incorporate occupational X-ray doses from the OTIB-0006, estimates of ingestion intakes, and additional OCAS comments.

    • Approved March 31, 2003
      this document in PDF PDF 1.4 MB (15 pages)

Top of Page

Page last updated: March 19, 2008
Page last reviewed: May 30, 2008
Content Source: National Institute for Occupational Safety and Health (NIOSH)

Find It !
On this page...
Technical Basis Document
Technical Information Bulletins (TIBs)
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
Worker Outreach Activities
Comments on Bethlehem Steel Company Documents
Special Exposure Cohort Petition Information for Bethlehem Steel Company
Previous Versions of Bethlehem Steel Company Documents
Claimant Corner
Claim Information
Commonly Used Acronyms
FAQs
General Activities on AWE Cases
General Activities on DOE Cases
Help A-Z
List of Work Sites
Phone Interview Information
OCAS Print Materials
Status of Your Dose Reconstruction
OCAS Directory
About OCAS
The Act (EEOICPA)
Advisory Board
Conflict or Bias Policy and Disclosure Statements
Dose Reconstruction
Help A-Z
Latest Update to OCAS Web Site
Probability of Causation
(NIOSH-IREP)

Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
Public Meetings
Regulatory Record
(Public Docket)

Related Links
Special Exposure Cohort
Technical Documents Used in Dose Reconstruction
Timeline of Major OCAS Events
OCAS Main Page