Western's banner shows transmission lines.
Link to Western's home page
Federal Register Notices 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995

1998 Federal Register notices

Note: All files are in PDF.

Notice Date Published Citation

Comment Forum: Inquiry on the Impact of Electric Utility Industry Restructuring (20 kb pdf)

December 1, 1998

63 FR 66166

Notice of Availability and Public Hearing: Sutter Power Project Draft EIS (22 kb pdf)

November 6, 1998

63 FR 59986

Loveland Area Projects extension of the Firm Electric Service Rate— Rate Order No. WAPA-82 (15 kb pdf)

October 29, 1998 

63 FR 58033

Placing the provisional Base Charge and its components (Base Charge) for the Boulder Canyon Project (BCP) firm power into effect (27 kb pdf)

October 6, 1998 

63 FR 53045 

Pick-Sloan Missouri Basin Program— Eastern Division, Proposed Extension Firm Power Service and Firm Peaking Power Service— Rates Order No. WAPA-83 (15 kb pdf)

August 18, 1998

63 FR 44251

Loveland Area Projects Proposed Extension Firm Electric Service— Rate Order No. WAPA-82 (15 kb pdf)

August 18, 1998

63 FR 44250

Pick-Sloan Missouri Basin Program - Eastern Division: Placing formula rates into effect on an interim basis for firm and non-firm transmission on the Integrated System (IS) and ancillary services for the Watertown control area— Rate Order No. WAPA-79 (135 kb pdf)

August 12, 1998 

63 FR 43158 

Notice of Final Procedures: Collections from Central Valley Project Power Contractors to carry out the restoration, improvement and acquisition of Environmental Habitat Provisions of the Central Valley Project Improvement Act of 1992 (42 kb pdf)

August 4, 1998 

63 FR 41561 

Notice of Proposed Rate Adjustments: Desert Southwest Region is initiating a rate adjustment process for network integration transmission service for both the Parker-Davis Project (P-DP) and the Pacific Northwest-Pacific Southwest Intertie Project (Intertie) and for ancillary services from the P-DP, Boulder Canyon Project (BCP), and part of the Colorado River Storage Project (CRSP) located in DSW's Control Area. (26 kb pdf)

June 19, 1998 

63 FR 33649 

Notice of Availability of Replacement Resources Methods Report and Executive Summary: Identify economically and technically feasible methods for replacing power resources that are lost due to longterm operational constraints at Glen Canyon Dam Powerplant (16 kb pdf)

May 18, 1998 

63 FR 27277 

Confirming and Approving an extension of the Power Rate Formula for the Amistad and Falcon Projects— Rate Order No. WAPA-81 (19 kb pdf)

May 18, 1998 

63 FR 27278 

Notice of Proposed Base Charge: Desert Southwest Region is announcing the fiscal year (FY) 1998 annual rate adjustment process for FY 1999 Revenue Requirements and Rates under Rate Order WAPA-70 for firm power service for the Boulder Canyon Project (17 kb pdf)

April 21, 1998 

63 FR 10493 

Notice of Proposed Procedures: Western is proposing revised procedures for the assessment and collection of restoration fund payments from the Central Valley Project (CVP) power contractors as required by the CVP Improvement Act of 1992 (Act) (31 kb pdf)

April 13, 1998 

63 FR 18005 

Notice of Proposed Rate Adjustments: Desert Southwest Region is initiating a rate adjustment process for point-to-point transmission services on the 230/345-kV system of the Pacific Northwest-Pacific Southwest Intertie Project (AC Intertie) (18 kb pdf)

April 3, 1998 

63 FR 16497 

EIS: Regarding the proposal by Griffith Energy (GE), LLC, to construct an electric generating facility on private property and to interconnect this facility with Western’s system in the vicinity of Kingman, AZ (16 kb pdf)

April 3, 1998 

63 FR 16496 

Placing into effect on an interim basis, firm power rates from the Salt Lake City Area/Integrated Projects, placing firm and nonfirm transmission rates on the Colorado River Storage Project (CRSP) transmission and placing rates for ancillary services on the CRSP system— Rate Order No. WAPA-78 (125 kb pdf)

April 6, 1998 

63 FR 16796 

Placing formula rates into effect on an interim basis for firm and non-firm transmission on the Loveland Area Projects (LAP) transmission system and for ancillary services for the Western Area Colorado Missouri control area (WACM) (143 kb pdf)

April 6, 1998

63 FR 16778 

EIS: Regarding the proposal by the Calpine Corporation (Calpine) to construct an electric generating facility and associated 230-kV transmission line, approximately 3.5 miles in length, known as the Sutter Power Plant (SPP) (18 kb pdf)

February 13, 1998 

63 FR 7412 

Correction: Access Transmission Service Tariff (19 kb pdf)

February 2, 1998 

63 FR 6450 

Open Access Transmission Service Tariff (310 kb pdf)

January 6, 1998 

63 FR 521