Federal Register Notices
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995 |
1998 Federal Register notices |
Note: All files are in PDF.
Notice |
Date Published |
Citation |
Comment Forum: Inquiry on the Impact of Electric Utility Industry Restructuring (20 kb pdf) |
December 1, 1998 |
63 FR 66166 |
Notice of Availability and Public Hearing: Sutter Power Project Draft EIS (22 kb pdf) |
November 6, 1998 |
63 FR 59986 |
Loveland Area Projects extension of the Firm Electric Service Rate— Rate Order No. WAPA-82 (15 kb pdf) |
October 29, 1998 |
63 FR 58033 |
Placing the provisional Base Charge and its components (Base Charge) for the Boulder Canyon Project (BCP) firm power into effect (27 kb pdf) |
October 6, 1998 |
63 FR 53045 |
Pick-Sloan Missouri Basin Program— Eastern Division, Proposed Extension Firm Power Service and Firm Peaking Power Service— Rates Order No. WAPA-83 (15 kb pdf) |
August 18, 1998 |
63 FR 44251 |
Loveland Area Projects Proposed Extension Firm Electric Service— Rate Order No. WAPA-82 (15 kb pdf) |
August 18, 1998 |
63 FR 44250 |
Pick-Sloan Missouri Basin Program - Eastern Division: Placing formula rates into effect on an interim basis for firm and non-firm transmission on the Integrated System (IS) and ancillary services for the Watertown control area— Rate Order No. WAPA-79 (135 kb pdf) |
August 12, 1998 |
63 FR 43158 |
Notice of Final Procedures: Collections from Central Valley Project Power Contractors to carry out the restoration, improvement and acquisition of Environmental Habitat Provisions of the Central Valley Project Improvement Act of 1992 (42 kb pdf) |
August 4, 1998 |
63 FR 41561 |
Notice of Proposed Rate Adjustments: Desert Southwest Region is initiating a rate adjustment process for network integration transmission service for both the Parker-Davis Project (P-DP) and the Pacific Northwest-Pacific Southwest Intertie Project (Intertie) and for ancillary services from the P-DP, Boulder Canyon Project (BCP), and part of the Colorado River Storage Project (CRSP) located in DSW's Control Area. (26 kb pdf) |
June 19, 1998 |
63 FR 33649 |
Notice of Availability of Replacement Resources Methods Report and Executive Summary: Identify economically and technically feasible methods for replacing power resources that are lost due to longterm operational constraints at Glen Canyon Dam Powerplant (16 kb pdf) |
May 18, 1998 |
63 FR 27277 |
Confirming and Approving an extension of the Power Rate Formula for the Amistad and Falcon Projects— Rate Order No. WAPA-81 (19 kb pdf) |
May 18, 1998 |
63 FR 27278 |
Notice of Proposed Base Charge: Desert Southwest Region is announcing the fiscal year (FY) 1998 annual rate adjustment process for FY 1999 Revenue Requirements and Rates under Rate Order WAPA-70 for firm power service for the Boulder Canyon Project (17 kb pdf) |
April 21, 1998 |
63 FR 10493 |
Notice of Proposed Procedures: Western is proposing revised procedures for the assessment and collection of restoration fund payments from the Central Valley Project (CVP) power contractors as required by the CVP Improvement Act of 1992 (Act) (31 kb pdf) |
April 13, 1998 |
63 FR 18005 |
Notice of Proposed Rate Adjustments: Desert Southwest Region is initiating a rate adjustment process for point-to-point transmission services on the 230/345-kV system of the Pacific Northwest-Pacific Southwest Intertie Project (AC Intertie) (18 kb pdf) |
April 3, 1998 |
63 FR 16497 |
EIS: Regarding the proposal by Griffith Energy (GE), LLC, to construct an electric generating facility on private property and to interconnect this facility with Western’s system in the vicinity of Kingman, AZ (16 kb pdf) |
April 3, 1998 |
63 FR 16496 |
Placing into effect on an interim basis, firm power rates from the Salt Lake City Area/Integrated Projects, placing firm and nonfirm transmission rates on the Colorado River Storage Project (CRSP) transmission and placing rates for ancillary services on the CRSP system— Rate Order No. WAPA-78 (125 kb pdf) |
April 6, 1998 |
63 FR 16796 |
Placing formula rates into effect on an interim basis for firm and non-firm transmission on the Loveland Area Projects (LAP) transmission system and for ancillary services for the Western Area Colorado Missouri control area (WACM) (143 kb pdf) |
April 6, 1998 |
63 FR 16778 |
EIS: Regarding the proposal by the Calpine Corporation (Calpine) to construct an electric generating facility and associated 230-kV transmission line, approximately 3.5 miles in length, known as the Sutter Power Plant (SPP) (18 kb pdf) |
February 13, 1998 |
63 FR 7412 |
Correction: Access Transmission Service Tariff (19 kb pdf) |
February 2, 1998 |
63 FR 6450 |
Open Access Transmission Service Tariff (310 kb pdf) |
January 6, 1998 |
63 FR 521 |
|