New England (ISO-NE) Electric Regions  
2007 New England (ISO-NE) Electric Regions  
 
 
Overview

Geography
Back to Top
 
    States covered: Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island and Vermont

    Reliability region: ISO New England (ISO-NE) sub-region of the Northeast Power Coordinating Council (NPCC) [NERC regions map External Link]

    Balancing authority: ISO New England (ISO-NE)

    Load zones: Connecticut, Maine, New Hampshire, Rhode Island, Vermont, Northeastern Massachusetts/Boston (NEMA), Southeastern Massachusetts (SEMA) and Western/Central Massachusetts (WCMA).

    Hub: Mass Hub


RTO/ISO
Back to Top
 
    ISO New England (ISO-NE) (established 1997) operates the region's power grid and wholesale electric markets:

    • Energy market: two-settlement (day ahead and real-time) spot market with locational marginal pricing (an internal hub, eight load zones and more than 500 nodes),
    • Capacity market,
    • Forward reserves market,
    • Regulation market, and
    • Financial transmission rights market.

    ISO-NE 2007 State of the Markets Report PDF External Link
    Market Monitor: David LaPlante – Internal Market Monitor
Generation/Supply
Back to Top
 
    Marginal fuel type: natural gas

    Generating capacity (summer 2007): 30,879 MW

    Very little new generation has been brought on line recently in New England. The ISO states that it, “…has adequate installed capacity to meet regional capacity needs through 2009.  The ISO is optimistic that adequate demand and supply resources will be purchased and installed in time to meet the projected capacity needs and the resource adequacy requirements for 2010 and beyond.”

    Capacity reserve (summer 2007): 4,736 MW

    Reserve margin (summer 2007): 18.1%

Demand
Back to Top
 
    All time peak demand: 28,130 MW (set August 2, 2006)

    In summer of 2006, demand reached record levels on several occasions due to extremely hot weather.

    Peak demand growth: 7.1% (2007-2006) (weather-normalized peak increased by 1.9%)

      2004 2005 2006 2007
    Summer Peak Demand (MW) 24,116 26,885 28,130 26,143
    Source: Derived from ISO-NE Data

    Load pockets: Southwest Connecticut, Southeastern Massachusetts (SEMA), and Northeastern Massachusetts/Boston (NEMA).

Prices
Back to Top
 
    Annual Average Price (RTO Day-Ahead Mass Hub)
    2004: $53.74/MWh
    2005: $78.63/MWh
    2006: $60.88/MWh
    2007: $67.97/MWh


Updated: January 13, 2009