Projects & Studies
|
»
|
Benton County near St. Cloud, Minnesota
|
»
|
Canisteo Mine Pit Flood Control Project, Itasca County, Minn.
|
»
|
Chippewa River at Big Bend , Minnesota - Stream Bank Protection
|
»
|
Crow River at Delano, Minnesota
|
»
|
Devils Lake Basin, North Dakota
|
»
|
Devils Lake Flood Risk Management Project
|
»
|
Devils Lake Levee, North Dakota
|
»
|
Devils Lake: Minnewaukan Flood Control Project, North Dakota
|
»
|
Drayton Initial Assessment - Drayton, North Dakota
|
»
|
Emergency Streambank Protection, Section 14, Brooklyn Center, Minn.
|
»
|
Erosion along Highway 2, Red Lake River, Crookston, MN
|
»
|
Fargo-Moorhead and Upstream Feasibility Study
|
»
|
Flood Control: Downtown St. Paul Airport, St. Paul, Minnesota
|
»
|
Flood Risk Management Continuing Authority, Red River of the North: Wahpeton, N.D.
|
»
|
Flood Risk Management: Fargo-Moorhead Metro, North Dakota and Minnesota
|
»
|
Flood Risk Management: Red Lake River, Crookston, Minnesota
|
»
|
Flood Risk Management: Roseau River, Roseau, Minnesota
|
»
|
Flood Risk Management: Twin Valley, Wild Rice River, Minnesota
|
»
|
Hay Creek Aquatic Ecosystem Restoration - Roseau County, Minnesota
|
»
|
Homme Dam and Reservoir Dam Safety, North Dakota
|
»
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
»
|
Kickapoo River Flood Damage Reduction, La Farge, Wisconsin
|
»
|
Lac Qui Parle River, Dawson, Minnesota
|
»
|
Marsh Creek near Mahnomen, Minnesota
|
»
|
Minnesota River Flood Control Project : Montevideo, Minnesota
|
»
|
Minnesota River Flood Control Project, at Granite Falls, Minnesota
|
»
|
Mississippi Headwaters Reservoirs Project Sites
|
»
|
Newport, Minnesota Flood Risk Management Project, Section 205
|
»
|
Painter Creek Habitat Restoration, Minnehaha Creek, Minnesota
|
»
|
Park River Flood Protection Project at Grafton, North Dakota
|
»
|
Pembina River Flood Control Project: Neche, North Dakota
|
»
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
»
|
Red River of the North Basin: Basin-Wide Watershed Management Planning
|
»
|
Red River of the North Basin: Minnesota, North Dakota, South Dakota and Manitoba, Reconnaissance Study
|
»
|
Red River of the North Flood Control: Breckenridge, Minnesota
|
»
|
Red River of the North at Grand Forks, North Dakota/East Grand Forks, Minnesota Flood Risk Management
|
»
|
Ridgewood Addition, Fargo, North Dakota
|
»
|
River Resource Values and Expectation
|
»
|
Roads Serving As Water Barriers, Devils Lake Basin, North Dakota
|
»
|
Sand Creek Flood Risk Management Project, Jordan, Minnesota
|
»
|
Section 205 Flood Control Project, Borup, Minnesota
|
»
|
Section 205 Flood Control Study: Mississippi River, Aitkin, Minnesota
|
»
|
Sheyenne River Flood Control, West Fargo, North Dakota
|
»
|
Sheyenne River, Baldhill Pool Raise, North Dakota
|
»
|
South Fork Zumbro River Flood Control: Rochester, Minnesota
|
»
|
South Washington Watershed District
|
»
|
Stillwater Flood and Retaining Wall Project, St. Croix River, Stillwater, Minnesota
|
»
|
Stream Bank Protection: Section 14, Pug Hole Lake, Minnesota
|
»
|
Western Flood Control Sites - Minnesota: Lake Traverse, Orwell Lake, Hwy 75 - Bigstone, Lac qui Parle
|
»
|
Western Flood Control Sites – North Dakota: Lake Ashtabula, Homme Lake Souris River
|
»
|
White Rock Dam Safety, Wheaton, Minnesota
|
»
|
Wild Rice River (MN) Feasibility Study
|
»
|
Wild Rice and Marsh Rivers, Ada, Minnesota
|
|
|
|
Drayton Initial Assessment - Drayton, North Dakota
Location/Description
|
The project is located in the city of Drayton, N.D. Drayton is on the west bank of the Red River of the North, approximately 90 river miles north of Grand Forks, N.D.
Following a successful flood fight during the 1997 flood, the city began construction of a higher earthen levee system which caused bank stability problems and resulted in the city needing to remove the majority of the earthen levees along the secondary bank of the Red River of the North. A Section 14 bank erosion project was requested in 1999 to evaluate and repair the riverbank problems, but bank slippage problems were too large to be addressed under the Section 14 authority.
On Feb. 10, 2000, the city asked the Corps of Engineers to perform a Section 205 study to determine the feasibility of a small flood control project for Drayton. Funding to initiate the study was not made available until fiscal year 2003.
|
Status
|
The initial assessment of the feasibility phase began in January 2003. During the initial assessment, structural and nonstructural alternatives were evaluated to determine if a flood control project had a potential federal interest. The Corps project delivery team met with the city and toured the site in May 2003. Structural and nonstructural flood damage reduction alternatives were identified and evaluated with the city and key stakeholders before completion of the initial assessment. The initial assessment was completed in September 2004, and no federal interest was identified. No additional work is planned.
|
Authority
|
Section 205 of the 1948 Flood Control Act, as amended, authorized the Corps to plan, design, and construct certain small flood control projects that have not already been specifically authorized by Congress.
|
Fiscal
|
Economic justification for this project was not identified. No further work is planned for this study.
|
|
|