Projects & Studies
|
»
|
Benton County near St. Cloud, Minnesota
|
»
|
Canisteo Mine Pit Flood Control Project, Itasca County, Minn.
|
»
|
Chippewa River at Big Bend , Minnesota - Stream Bank Protection
|
»
|
Crow River at Delano, Minnesota
|
»
|
Devils Lake Basin, North Dakota
|
»
|
Devils Lake Flood Risk Management Project
|
»
|
Devils Lake Levee, North Dakota
|
»
|
Devils Lake: Minnewaukan Flood Control Project, North Dakota
|
»
|
Drayton Initial Assessment - Drayton, North Dakota
|
»
|
Emergency Streambank Protection, Section 14, Brooklyn Center, Minn.
|
»
|
Erosion along Highway 2, Red Lake River, Crookston, MN
|
»
|
Fargo-Moorhead and Upstream Feasibility Study
|
»
|
Flood Control: Downtown St. Paul Airport, St. Paul, Minnesota
|
»
|
Flood Risk Management Continuing Authority, Red River of the North: Wahpeton, N.D.
|
»
|
Flood Risk Management: Fargo-Moorhead Metro, North Dakota and Minnesota
|
»
|
Flood Risk Management: Red Lake River, Crookston, Minnesota
|
»
|
Flood Risk Management: Roseau River, Roseau, Minnesota
|
»
|
Flood Risk Management: Twin Valley, Wild Rice River, Minnesota
|
»
|
Hay Creek Aquatic Ecosystem Restoration - Roseau County, Minnesota
|
»
|
Homme Dam and Reservoir Dam Safety, North Dakota
|
»
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
»
|
Kickapoo River Flood Damage Reduction, La Farge, Wisconsin
|
»
|
Lac Qui Parle River, Dawson, Minnesota
|
»
|
Marsh Creek near Mahnomen, Minnesota
|
»
|
Minnesota River Flood Control Project : Montevideo, Minnesota
|
»
|
Minnesota River Flood Control Project, at Granite Falls, Minnesota
|
»
|
Mississippi Headwaters Reservoirs Project Sites
|
»
|
Newport, Minnesota Flood Risk Management Project, Section 205
|
»
|
Painter Creek Habitat Restoration, Minnehaha Creek, Minnesota
|
»
|
Park River Flood Protection Project at Grafton, North Dakota
|
»
|
Pembina River Flood Control Project: Neche, North Dakota
|
»
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
»
|
Red River of the North Basin: Basin-Wide Watershed Management Planning
|
»
|
Red River of the North Basin: Minnesota, North Dakota, South Dakota and Manitoba, Reconnaissance Study
|
»
|
Red River of the North Flood Control: Breckenridge, Minnesota
|
»
|
Red River of the North at Grand Forks, North Dakota/East Grand Forks, Minnesota Flood Risk Management
|
»
|
Ridgewood Addition, Fargo, North Dakota
|
»
|
River Resource Values and Expectation
|
»
|
Roads Serving As Water Barriers, Devils Lake Basin, North Dakota
|
»
|
Sand Creek Flood Risk Management Project, Jordan, Minnesota
|
»
|
Section 205 Flood Control Project, Borup, Minnesota
|
»
|
Section 205 Flood Control Study: Mississippi River, Aitkin, Minnesota
|
»
|
Sheyenne River Flood Control, West Fargo, North Dakota
|
»
|
Sheyenne River, Baldhill Pool Raise, North Dakota
|
»
|
South Fork Zumbro River Flood Control: Rochester, Minnesota
|
»
|
South Washington Watershed District
|
»
|
Stillwater Flood and Retaining Wall Project, St. Croix River, Stillwater, Minnesota
|
»
|
Stream Bank Protection: Section 14, Pug Hole Lake, Minnesota
|
»
|
Western Flood Control Sites - Minnesota: Lake Traverse, Orwell Lake, Hwy 75 - Bigstone, Lac qui Parle
|
»
|
Western Flood Control Sites – North Dakota: Lake Ashtabula, Homme Lake Souris River
|
»
|
White Rock Dam Safety, Wheaton, Minnesota
|
»
|
Wild Rice River (MN) Feasibility Study
|
»
|
Wild Rice and Marsh Rivers, Ada, Minnesota
|
|
|
|
White Rock Dam Safety, Wheaton, Minnesota
Location/Description
|
Lake Traverse is located near the junction of Minnesota, North Dakota and South Dakota in the headwaters of the Red River of the North on the Bois de Sioux River. Lake Traverse comprises two dams, two lakes and Browns Valley dike at the southern end of the project. White Rock Dam, which forms Mud Lake, is located at the extreme northern end of the project and controls water flowing north on the Bois de Sioux River.
White Rock Dam is 14,400 feet long with an average height of 16 feet. The current spillway capacity at project pool elevation 981.0 feet is approximately 7,100 cubic feet per second. This is only a fraction of the spillway capacity that would be required to safely pass the Probable Maximum Flood with freeboard. The PMF is the current spillway design flood standard for high hazard dams used to assess project risks associated with hydrologic deficiencies.
|
Status
|
A dam failure analysis performed in the mid-1980s identified that the PMF would overtop the dam. At that time, however, the incremental impacts in Wahpeton, N.D., and Breckenridge, Minn., due to a failure were not considered life threatening, as the communities were flooded prior to failure and most threatened populations would be evacuated. Incremental flood depths were in the range of about 2 feet.
The new levee projects in those communities will change this scenario. The levees are capable of withstanding the flood releases from the dam with the existing spillway capacity until the project pool approaches the top of the dam. A dam failure under these circumstances would more than likely result in the levees being overtopped as a result of the flood surge, threatening the lives of much of the population protected by the new levee project.
|
The Dam Safety Assurance Program Evaluation Report was approved in December 2004. Work on the Design Documentation Report began in Fiscal Year 2005, funding was not continued in Fiscal Year 2006. Once additional federal funding is provided, work will continue on the Design Documentation Report and the plans and specifications.
Dam safety modifications are required to provide stable and adequate discharge capability to meet the base safety condition. The recommended alternative is to armor the downstream slope of the embankment. If constructed, White Rock Dam would safely meet the minimum base safety condition of 50 percent of the Probable Maximum Flood.
|
Authority
|
The Report was prepared in accordance with the Dam Safety Assurance Program, ER 1110 2 1155.
|
Fiscal
|
Operation and Maintenance funds were used to prepare the evaluation report. Dam Safety funding has been requested to continue preparation of the DDR and P&S. Construction costs will be submitted as part of the Fiscal Year 2008 budget request. This project is 100 percent federally-funded.
DDR and P&S $1,100,000
Construction $5,800,000
|
|
|