Table of Contents
Section 2 - Major Steps in Transition
2.1 Beginning of Transition and Rate of Implementation
2.2 DTB Mass-Duplication and DTBM Production Related Tasking
2.2.1 Finalize DTBM, DTB, and DTB Container Design
2.2.5 Finalize Duplicator Equipment Design and Procure Equipment
2.2.6 Develop New and Retro DTB Production Scheduling System
2.2.7 Phase-In DTB Mass-Duplication
2.2.8 Recondition Cartridges and Containers
2.3 DTB and DTBM Library-Related Tasking
2.3.1 Modify Library Automation Systems
2.3.2 Make Storage System Changes to Accommodate DTBs
2.3.3 Provide Library Duplication Capability and Procure Equipment
2.3.4 Implement DAMS and Internet DTB Delivery
2.3.5 Implement New Patron Return Inspection Procedures
2.3.6 Distribute DTBMs to Patrons
2.4 DTB and DTBM Other Tasking
2.4.1 Allocate DTBMs to Libraries
2.4.2 Develop DTB Title Master Collection
2.4.3 Develop New and Retro Copy Allotment System
2.4.4 Develop DTBM Repair Infrastructure
2.5.1 Phase-Out RC Mass-Duplication
2.5.4 Migrate RC Titles to Multistate Centers
2.5.5 Make Lifetime Buys of CBM Repair Parts
2.5.6 Phase-Out RC Distribution from Libraries
2.6 DOD Center Production Related Tasking
2.7 DOD Library Related Tasking
2.7.1 Modify Library Automation Systems and Implement DOD Distribution
Section 3 - Multiyear Transition Plans
1 Estimates and Assumptions Used for Planning