Projects & Studies
|
»
|
Ambrough Slough Habitat Project, Pool 10, Wisconsin
|
»
|
Aquatic Ecosystem Restoration: Section 206, Paint Creek Restoration, Waukon, Iowa
|
»
|
Asian Carp Barrier System Upper Mississippi River
|
»
|
Blackhawk Park Backwater Restoration Project , Victory, Wisconsin
|
»
|
Bussey Lake Habitat Project, Guttenberg, Iowa
|
»
|
Capoli Slough Habitat Project, Pool 9, Wisconsin
|
»
|
Christine and Hickson Dams
|
»
|
Cold Springs Habitat Project, Crawford County, Wis.
|
»
|
Conway Lake Habitat Project, Lansing, Iowa
|
»
|
Drayton Dam Habitat Restoration, Drayton, North Dakota
|
»
|
Dresbach Island Revegetation Project
|
»
|
East Channel Habitat Project, La Crescent, Minn./Wis.
|
»
|
Endangered Species - Conservation of Native Mussels
|
»
|
Environmental Infrastructure Assistance - City of Garrison and Kathio Township, Minnesota
|
»
|
Environmental Infrastructure Assistance Program: Section 219 - Devils Lake and All of North Dakota
|
»
|
Environmental Infrastructure Assistance Program: Section 219 at Central Lakes, Goodview, Grand Rapids, Willmar, Minnesota
|
»
|
Environmental Infrastructure Assistance Program: St. Croix Falls, Wisconsin
|
»
|
Fargo-Moorhead and Upstream Feasibility Study
|
»
|
Feasibility Study: Blue Earth River Basin in Minnesota and Iowa
|
»
|
Finger Lakes Habitat Project , Wabasha, Minnesota
|
»
|
General Investigations: Hydropower, Crown Hydro, Minneapolis, Minnesota
|
»
|
General Investigations: Hydropower, Ford Plant, Minneapolis, Minnesota
|
»
|
Grand Marais River Aquatic Ecosystem Restoration
|
»
|
Guttenberg Waterfowl Ponds Habitat Project, Iowa
|
»
|
Habitat Restoration: Mississippi River, Pool 8 Islands Phase III, Wisconsin/Minnesota
|
»
|
Habitat Restoration: Mississippi River, Clear (Finger) Lake, Pool 5, Minnesota
|
»
|
Harpers Slough Habitat Project, Pool 9, Iowa
|
»
|
Hay Creek Aquatic Ecosystem Restoration - Roseau County, Minnesota
|
»
|
Indian Slough Habitat Project, Buffalo County, Wis.
|
»
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
»
|
Island 116 Channel Closure & Shoreline Stabilization
|
»
|
Island 42 Habitat Project, Wabasha County, Minn.
|
»
|
Kinnickinnic River Aquatic Ecosystem Restoration
|
»
|
Lake Onalaska Habitat Project, La Crosse, Wisconsin
|
»
|
Lake Winneshiek Habitat Project, Ferryville, Wis.
|
»
|
Lansing Big Lake Habitat Project, Lansing, Iowa
|
»
|
Long Lake Habitat Project , Trempealeau, Wisconsin
|
»
|
Long Meadow Lake Habitat Project, Bloomington, Minn.
|
»
|
Lower St. Anthony Falls Rapids Restoration, Mississippi River, Minneapolis, Minn.
|
»
|
Marsh Lake Ecosystem Restoration Feasibility Study, Lac Qui Parle Wildlife Area, MN
|
»
|
McGregor Lake Habitat Project, Prairie du Chien, Wisconsin
|
»
|
Minnehaha Creek Watershed Study
|
»
|
Mississippi River Bank Stabilization Habitat Project, Minn/Wis/Iowa
|
»
|
Mississippi River Locks and Dams Nos. 2-10 Embankment Rehabilitation
|
»
|
Mississippi River Recreation and Environmental Stewardship, Eau Galle Dam
|
»
|
Mississippi River: Lock & Dam 3 Navigation Safety and Embankments, Minnesota and Wisconsin
|
»
|
Mud Lake Water Management
|
»
|
North Ottawa Impoundment Project, Grant County, Minn.
|
»
|
Orr, Minnesota Water Line Replacement - Section 569 Environmental Infrastructure Program
|
»
|
Painter Creek Habitat Restoration, Minnehaha Creek, Minnesota
|
»
|
Peterson Lake Habitat Project, Wabasha, Minnesota
|
»
|
Pigs Eye Habitat Restoration Lake, St. Paul, Minnesota
|
»
|
Polander Lake Habitat Project, Winona, Minnesota
|
»
|
Pool 8 Islands Phase I Habitat Project, Wisconsin
|
»
|
Pool 8 Islands Phase II Habitat Project, Stoddard, Wis.
|
»
|
Pool 9 Island Habitat Project, Wisconsin
|
»
|
Pool Slough Habitat Project, New Albin, Iowa
|
»
|
Reconnaissance Report: Baraboo/Wisconsin River
|
»
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
»
|
Recreational Boating Study of the Mississippi River, Pools 4 to 9, Summer 2003
|
»
|
Red Lake River/Zah Gheeng Marsh Projects, Clearwater County, Minn.
|
»
|
Red River of the North Basin: Basin-Wide Watershed Management Planning
|
»
|
Red River of the North Basin: Minnesota, North Dakota, South Dakota and Manitoba, Reconnaissance Study
|
»
|
Rice Lake Habitat Project, Savage, Minnesota
|
»
|
River Resource Values and Expectation
|
»
|
Ruffy Brook Aquatic Ecosystem Restoration, Clearwater County, Minnesota
|
»
|
Sand Hill River Aquatic Ecosystem Restoration, Minn.
|
»
|
Small Scale Drawdown Habitat Project, Buffalo City, Wis.
|
»
|
South Washington Watershed District
|
»
|
Spring Lake Islands Habitat Project, Buffalo City, Wis.
|
»
|
Spring Lake Peninsula Habitat Project, Buffalo City, Wis.
|
»
|
St. Croix Headwaters Watershed Study, Wisconsin
|
»
|
St. Croix River: Endangered Mussel Conservation - Zebra Mussel Control
|
»
|
St. Croix Watershed Reconnaissance Study
|
»
|
Streambank Protection: Section 14 Minnehaha Creek WPA Walls, Minnesota
|
»
|
Streambank Protection: Section 14, Barnes County, Kathryn, North Dakota
|
»
|
Streambank Protection: Section 14, Pug Hole Lake, Minnesota
|
»
|
Streambank Protection: Section 14, Sartell, Minnesota
|
»
|
Sturgeon Lake, Pine County, Minnesota, Wastewater Collection and Treatement Facility
|
»
|
Sunrise River Watershed Study, Minnesota
|
»
|
Trempealeau National Wildlife Refuge, Trempealeau, Wis
|
»
|
Upper Mississippi River - Illinois Waterway System Navigation Study
|
»
|
Upper St. Croix Lake Sanitary District Wastewater Collection Systems Improvement Project
|
»
|
WKTY-AM Study Area
|
»
|
Western Flood Control Sites - Minnesota: Lake Traverse, Orwell Lake, Hwy 75 - Bigstone, Lac qui Parle
|
»
|
Western Flood Control Sites – North Dakota: Lake Ashtabula, Homme Lake Souris River
|
»
|
Wild Rice River (MN) Feasibility Study
|
»
|
Wild Rice River Aquatic Ecosystem Restoration, Minn.
|
»
|
Zebra Mussels and Management Implications for Endangered Freshwater Mussels on the Upper Mississippi River System
|
|
|
|
Small Scale Drawdown Habitat Project, Buffalo City, Wis.
Location/Description
|
Part of the Corps of Engineers' Environmental Management Program, a drawdown of a small backwater area on the Upper Mississippi River was proposed to restore or enhance aquatic plant species. Impoundments on the Upper Mississippi River for navigation have slowed the natural sediment transport during low to normal flow conditions, and seasonal water level fluctuations have been reduced, which has increased backwater sedimentation and reduced germination of aquatic plant species.
|
The project consisted of a drawdown to permit germination of seeds in the bottom sediments. Potential sites of 5 to 200 acres in pools 3 through 10 were identified and screened. Candidate sites were primarily shallow areas lacking emergent aquatic vegetation, having a flocculent substrate, and able to provide useful information about the impacts of a drawdown.
Lizzy Pauls Pond in pool 5 was selected. It is a 52-acre pond within the Upper Mississippi River National Wildlife and Fish Refuge. The outlet of the pond was closed to isolate the area, and water was pumped out to simulate the lower natural summer water level conditions. Pre- and post-drawdown conditions were monitored to document changes in vegetation and bottom sediments.
|
Status
|
A drawdown was implemented at Lizzy Pauls Pond in 1997. Although the desired extent of drawdown was not achieved because of heavy rainfall and the natural bottom elevations of the pond, the vegetative response was good. No further drawdowns are planned for this site.
|
Authority
|
The Small Scale Drawdown Habitat Project at Lizzy Pauls Pond was implemented under the authority of the Upper Mississippi River System - Environmental Management Program in accordance with a definite project report dated May 1997. The Environmental Management Program was authorized by Section 1103 of the Water Resources Development Act of 1986 and reauthorized by the Water Resources Development Act of 1999.
The project was planned and implemented as part of a cooperative effort of the U.S. Army Corps of Engineers; the U.S. Fish and Wildlife Service; the Minnesota, Wisconsin, and Iowa Departments of Natural Resources; and local interests.
|
Fiscal
|
Project planning and implementation costs were 100 percent Federal because the project was on lands managed as a national wildlife refuge. The cost includes the site screening and selection process. Because the project was a one-time effort, it has no operation and maintenance costs.
Federal cost $97,000
Non-federal cost $0
Total cost $97,000
|
|
|