Projects & Studies
|
»
|
Ambrough Slough Habitat Project, Pool 10, Wisconsin
|
»
|
Aquatic Ecosystem Restoration: Section 206, Paint Creek Restoration, Waukon, Iowa
|
»
|
Asian Carp Barrier System Upper Mississippi River
|
»
|
Blackhawk Park Backwater Restoration Project , Victory, Wisconsin
|
»
|
Bussey Lake Habitat Project, Guttenberg, Iowa
|
»
|
Capoli Slough Habitat Project, Pool 9, Wisconsin
|
»
|
Christine and Hickson Dams
|
»
|
Cold Springs Habitat Project, Crawford County, Wis.
|
»
|
Conway Lake Habitat Project, Lansing, Iowa
|
»
|
Drayton Dam Habitat Restoration, Drayton, North Dakota
|
»
|
Dresbach Island Revegetation Project
|
»
|
East Channel Habitat Project, La Crescent, Minn./Wis.
|
»
|
Endangered Species - Conservation of Native Mussels
|
»
|
Environmental Infrastructure Assistance - City of Garrison and Kathio Township, Minnesota
|
»
|
Environmental Infrastructure Assistance Program: Section 219 - Devils Lake and All of North Dakota
|
»
|
Environmental Infrastructure Assistance Program: Section 219 at Central Lakes, Goodview, Grand Rapids, Willmar, Minnesota
|
»
|
Environmental Infrastructure Assistance Program: St. Croix Falls, Wisconsin
|
»
|
Fargo-Moorhead and Upstream Feasibility Study
|
»
|
Feasibility Study: Blue Earth River Basin in Minnesota and Iowa
|
»
|
Finger Lakes Habitat Project , Wabasha, Minnesota
|
»
|
General Investigations: Hydropower, Crown Hydro, Minneapolis, Minnesota
|
»
|
General Investigations: Hydropower, Ford Plant, Minneapolis, Minnesota
|
»
|
Grand Marais River Aquatic Ecosystem Restoration
|
»
|
Guttenberg Waterfowl Ponds Habitat Project, Iowa
|
»
|
Habitat Restoration: Mississippi River, Pool 8 Islands Phase III, Wisconsin/Minnesota
|
»
|
Habitat Restoration: Mississippi River, Clear (Finger) Lake, Pool 5, Minnesota
|
»
|
Harpers Slough Habitat Project, Pool 9, Iowa
|
»
|
Hay Creek Aquatic Ecosystem Restoration - Roseau County, Minnesota
|
»
|
Indian Slough Habitat Project, Buffalo County, Wis.
|
»
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
»
|
Island 116 Channel Closure & Shoreline Stabilization
|
»
|
Island 42 Habitat Project, Wabasha County, Minn.
|
»
|
Kinnickinnic River Aquatic Ecosystem Restoration
|
»
|
Lake Onalaska Habitat Project, La Crosse, Wisconsin
|
»
|
Lake Winneshiek Habitat Project, Ferryville, Wis.
|
»
|
Lansing Big Lake Habitat Project, Lansing, Iowa
|
»
|
Long Lake Habitat Project , Trempealeau, Wisconsin
|
»
|
Long Meadow Lake Habitat Project, Bloomington, Minn.
|
»
|
Lower St. Anthony Falls Rapids Restoration, Mississippi River, Minneapolis, Minn.
|
»
|
Marsh Lake Ecosystem Restoration Feasibility Study, Lac Qui Parle Wildlife Area, MN
|
»
|
McGregor Lake Habitat Project, Prairie du Chien, Wisconsin
|
»
|
Minnehaha Creek Watershed Study
|
»
|
Mississippi River Bank Stabilization Habitat Project, Minn/Wis/Iowa
|
»
|
Mississippi River Locks and Dams Nos. 2-10 Embankment Rehabilitation
|
»
|
Mississippi River Recreation and Environmental Stewardship, Eau Galle Dam
|
»
|
Mississippi River: Lock & Dam 3 Navigation Safety and Embankments, Minnesota and Wisconsin
|
»
|
Mud Lake Water Management
|
»
|
North Ottawa Impoundment Project, Grant County, Minn.
|
»
|
Orr, Minnesota Water Line Replacement - Section 569 Environmental Infrastructure Program
|
»
|
Painter Creek Habitat Restoration, Minnehaha Creek, Minnesota
|
»
|
Peterson Lake Habitat Project, Wabasha, Minnesota
|
»
|
Pigs Eye Habitat Restoration Lake, St. Paul, Minnesota
|
»
|
Polander Lake Habitat Project, Winona, Minnesota
|
»
|
Pool 8 Islands Phase I Habitat Project, Wisconsin
|
»
|
Pool 8 Islands Phase II Habitat Project, Stoddard, Wis.
|
»
|
Pool 9 Island Habitat Project, Wisconsin
|
»
|
Pool Slough Habitat Project, New Albin, Iowa
|
»
|
Reconnaissance Report: Baraboo/Wisconsin River
|
»
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
»
|
Recreational Boating Study of the Mississippi River, Pools 4 to 9, Summer 2003
|
»
|
Red Lake River/Zah Gheeng Marsh Projects, Clearwater County, Minn.
|
»
|
Red River of the North Basin: Basin-Wide Watershed Management Planning
|
»
|
Red River of the North Basin: Minnesota, North Dakota, South Dakota and Manitoba, Reconnaissance Study
|
»
|
Rice Lake Habitat Project, Savage, Minnesota
|
»
|
River Resource Values and Expectation
|
»
|
Ruffy Brook Aquatic Ecosystem Restoration, Clearwater County, Minnesota
|
»
|
Sand Hill River Aquatic Ecosystem Restoration, Minn.
|
»
|
Small Scale Drawdown Habitat Project, Buffalo City, Wis.
|
»
|
South Washington Watershed District
|
»
|
Spring Lake Islands Habitat Project, Buffalo City, Wis.
|
»
|
Spring Lake Peninsula Habitat Project, Buffalo City, Wis.
|
»
|
St. Croix Headwaters Watershed Study, Wisconsin
|
»
|
St. Croix River: Endangered Mussel Conservation - Zebra Mussel Control
|
»
|
St. Croix Watershed Reconnaissance Study
|
»
|
Streambank Protection: Section 14 Minnehaha Creek WPA Walls, Minnesota
|
»
|
Streambank Protection: Section 14, Barnes County, Kathryn, North Dakota
|
»
|
Streambank Protection: Section 14, Pug Hole Lake, Minnesota
|
»
|
Streambank Protection: Section 14, Sartell, Minnesota
|
»
|
Sturgeon Lake, Pine County, Minnesota, Wastewater Collection and Treatement Facility
|
»
|
Sunrise River Watershed Study, Minnesota
|
»
|
Trempealeau National Wildlife Refuge, Trempealeau, Wis
|
»
|
Upper Mississippi River - Illinois Waterway System Navigation Study
|
»
|
Upper St. Croix Lake Sanitary District Wastewater Collection Systems Improvement Project
|
»
|
WKTY-AM Study Area
|
»
|
Western Flood Control Sites - Minnesota: Lake Traverse, Orwell Lake, Hwy 75 - Bigstone, Lac qui Parle
|
»
|
Western Flood Control Sites – North Dakota: Lake Ashtabula, Homme Lake Souris River
|
»
|
Wild Rice River (MN) Feasibility Study
|
»
|
Wild Rice River Aquatic Ecosystem Restoration, Minn.
|
»
|
Zebra Mussels and Management Implications for Endangered Freshwater Mussels on the Upper Mississippi River System
|
|
|
|
Finger Lakes Habitat Project , Wabasha, Minnesota
Location/Description
|
Part of the Corps of Engineers' Environmental Management Program, the Finger Lakes are five backwater lakes on the Minnesota side of the Mississippi River in upper Pool 5, immediately below the Lock and Dam 4 dike. The site is in the Upper Mississippi River National Wildlife and Fish Refuge. With construction of Lock and Dam 4, fresh water flows could only enter the Finger Lakes overland during high water. This restriction caused low dissolved oxygen conditions in the lakes at other times of the year, hampering fish productivity.
The Corps of Engineers installed a culvert through the dike in the 1960s to provide flow to one of the lakes. The other four lakes continued to experience periods of low dissolved oxygen during the summer and winter.
|
The project included the installation of three gated culverts in the Lock and Dam 4 dike to provide a maximum of 50 cubic feet per second of fresh water flow to each lake. The project provides year-round fresh water flow into the four lakes to maintain minimum dissolved oxygen levels of 5 mg/l. The project improves fishery productivity in about 113 acres of backwater habitat.
|
Status
|
A construction contract was awarded in September 1992 and was essentially completed in July 1994. The project was transferred to the U.S. Fish and Wildlife Service for operation and maintenance in December 1994. A biological monitoring study to evaluate the effects of the project was completed in 1999. A proposal to dredge one of the Finger Lakes (Clear Lake) to improve the fishery in the lake is being evaluated in 2007. If the dredging is found to be feasible, the dredged material would be used for topsoil in conjunction with the proposed Dam 4 embankment project in 2007.
|
Authority
|
The Finger Lakes Habitat Project was planned under the authority of the Upper Mississippi River System - Environmental Management Program and constructed in accordance with a definite project report dated May 1990. The Environmental Management Program was authorized by Section 1103 of the Water Resources Development Act of 1986 and reauthorized by the Water Resources Development Act of 1999.
The project was planned and designed as part of a cooperative effort of the U.S. Army Corps of Engineers, the Wisconsin and Minnesota Departments of Natural Resources, the U.S. Fish and Wildlife Service and local interests.
|
Fiscal
|
Project design and construction costs were 100 percent federal because the project is located on lands managed as a national wildlife refuge. Operation and maintenance costs are 100 percent federal (a responsibility of the U.S. Fish and Wildlife Service).
Federal cost $1,445,000
Non-federal cost $0
Total cost $1,445,000
|
|
|