Projects & Studies
|
»
|
Critical Infrastructure Security Program (CISP)
|
»
|
Dam Bridge and Gate Painting: Upper St. Anthony Falls through Lock and Dam 10
|
»
|
East Two Rivers at Tower, Minnesota
|
»
|
Effects of Recreational Boating on the Upper Mississippi River System
|
»
|
General Investigations: Federal Energy Regulatory Commission(FERC) Licensing
|
»
|
General Investigations: Hydropower, Crown Hydro, Minneapolis, Minnesota
|
»
|
General Investigations: Hydropower, Ford Plant, Minneapolis, Minnesota
|
»
|
Hydropower, LSAF Hydro, Minneapolis, Minnesota
|
»
|
Hydropower, Lock and Dam 2, Hastings, Minnesota
|
»
|
Hydropower, Upper St. Anthony Falls, Minneapolis, Minnesota
|
»
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
»
|
Lock & Dam 10 Stage 2
|
»
|
Lock Tow Haulage Units
|
»
|
Lock and Dam 4 Embankment Environmental Assessment
|
»
|
Locks and Dams 2 - 10, Embankment Maintenance Study
|
»
|
Lower Pool 4 Channel and Dredged Material Management Study
|
»
|
McMillan Island, Mississippi River Channel Maintenance
|
»
|
Minnesota River Navigation Project
|
»
|
Mississippi Headwaters Reservoirs Dam Safety Issues
|
»
|
Mississippi Headwaters Reservoirs Project Sites
|
»
|
Mississippi River Locks and Dams Nos. 2-10 Embankment Rehabilitation
|
»
|
Mississippi River Major Maintenance / Rehabilitation
|
»
|
Mississippi River: Lock & Dam 3 Navigation Safety and Embankments, Minnesota and Wisconsin
|
»
|
Navigation and Environmental Sustainability Program (NESP)
|
»
|
Navigation, Mississippi River, Lock Bulkheads and Slot Installation, Minn/Wisc/Iowa
|
»
|
Operation and Maintenance, Lock and Dam 10 Stage 2
|
»
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
»
|
Recreational Boating Study of the Mississippi River, Pools 4 to 9, Summer 2003
|
»
|
River Resource Values and Expectation
|
»
|
Small-Boat Harbor Dredging, St. Paul, Minnesota (Harbor Dredging)
|
»
|
St. Croix River: Endangered Mussel Conservation - Zebra Mussel Control
|
»
|
Upper Mississippi River - Illinois Waterway System Navigation Study
|
»
|
Upper Mississippi River 9-Foot Project - Locks & Dams
|
»
|
Upper Mississippi River 9-Foot Project Channel Maintenance; MN, WI, IA
|
»
|
Warroad Harbor and River Harbor Dredging
|
|
|
|
Mississippi Locks and Dams
Overview
|
To achieve a 9-foot channel in the Upper Mississippi River, the construction of a system of navigation locks and dams was authorized in 1930. Dams are built on rivers to hold back water and form deeper navigation "pools." Most pools in the United States are maintained at a constant minimum water depth of 9 feet for safe navigation. Dams allow river vessels to use a series of locks to "step" up or down the river from one water level to another.
The Corps operates the locks and dams on the Mississippi River for navigation, not flood control. The locks and dams create slack-water pools for navigation during periods of low- and moderate-level water. For each pool, there is a primary control point, where a predetermined water elevation must be kept for navigation to continue.
The St. Paul District operates and maintains 13 locks and dams beginning at Upper St. Anthony Falls in downtown Minneapolis and ending at lock and dam 10 in Guttenberg, Iowa.
For recreational craft to pass through a lock and dam, there is a specific locking procedure. It's a fun and unique experience. Interpretive materials and brochures are available at all locks.
|
Operation and Maintenance of Navigation Installations (OMNI) Reports
|
Information about commodity tonnage, vessel location, more.
|
Locking Information
|
Use Marine Band Channel 14 to get locking information.
|
Stairway of Water (PDF)
|
Minneapolis to St.Louis.
|
|
|
[Printable Copy]
|