Projects & Studies
|
»
|
Benton County near St. Cloud, Minnesota
|
»
|
Canisteo Mine Pit Flood Control Project, Itasca County, Minn.
|
»
|
Chippewa River at Big Bend , Minnesota - Stream Bank Protection
|
»
|
Crow River at Delano, Minnesota
|
»
|
Devils Lake Basin, North Dakota
|
»
|
Devils Lake Flood Risk Management Project
|
»
|
Devils Lake Levee, North Dakota
|
»
|
Devils Lake: Minnewaukan Flood Control Project, North Dakota
|
»
|
Drayton Initial Assessment - Drayton, North Dakota
|
»
|
Emergency Streambank Protection, Section 14, Brooklyn Center, Minn.
|
»
|
Erosion along Highway 2, Red Lake River, Crookston, MN
|
»
|
Fargo-Moorhead and Upstream Feasibility Study
|
»
|
Flood Control: Downtown St. Paul Airport, St. Paul, Minnesota
|
»
|
Flood Risk Management Continuing Authority, Red River of the North: Wahpeton, N.D.
|
»
|
Flood Risk Management: Fargo-Moorhead Metro, North Dakota and Minnesota
|
»
|
Flood Risk Management: Red Lake River, Crookston, Minnesota
|
»
|
Flood Risk Management: Roseau River, Roseau, Minnesota
|
»
|
Flood Risk Management: Twin Valley, Wild Rice River, Minnesota
|
»
|
Hay Creek Aquatic Ecosystem Restoration - Roseau County, Minnesota
|
»
|
Homme Dam and Reservoir Dam Safety, North Dakota
|
»
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
»
|
Kickapoo River Flood Damage Reduction, La Farge, Wisconsin
|
»
|
Lac Qui Parle River, Dawson, Minnesota
|
»
|
Marsh Creek near Mahnomen, Minnesota
|
»
|
Minnesota River Flood Control Project : Montevideo, Minnesota
|
»
|
Minnesota River Flood Control Project, at Granite Falls, Minnesota
|
»
|
Mississippi Headwaters Reservoirs Project Sites
|
»
|
Newport, Minnesota Flood Risk Management Project, Section 205
|
»
|
Painter Creek Habitat Restoration, Minnehaha Creek, Minnesota
|
»
|
Park River Flood Protection Project at Grafton, North Dakota
|
»
|
Pembina River Flood Control Project: Neche, North Dakota
|
»
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
»
|
Red River of the North Basin: Basin-Wide Watershed Management Planning
|
»
|
Red River of the North Basin: Minnesota, North Dakota, South Dakota and Manitoba, Reconnaissance Study
|
»
|
Red River of the North Flood Control: Breckenridge, Minnesota
|
»
|
Red River of the North at Grand Forks, North Dakota/East Grand Forks, Minnesota Flood Risk Management
|
»
|
Ridgewood Addition, Fargo, North Dakota
|
»
|
River Resource Values and Expectation
|
»
|
Roads Serving As Water Barriers, Devils Lake Basin, North Dakota
|
»
|
Sand Creek Flood Risk Management Project, Jordan, Minnesota
|
»
|
Section 205 Flood Control Project, Borup, Minnesota
|
»
|
Section 205 Flood Control Study: Mississippi River, Aitkin, Minnesota
|
»
|
Sheyenne River Flood Control, West Fargo, North Dakota
|
»
|
Sheyenne River, Baldhill Pool Raise, North Dakota
|
»
|
South Fork Zumbro River Flood Control: Rochester, Minnesota
|
»
|
South Washington Watershed District
|
»
|
Stillwater Flood and Retaining Wall Project, St. Croix River, Stillwater, Minnesota
|
»
|
Stream Bank Protection: Section 14, Pug Hole Lake, Minnesota
|
»
|
Western Flood Control Sites - Minnesota: Lake Traverse, Orwell Lake, Hwy 75 - Bigstone, Lac qui Parle
|
»
|
Western Flood Control Sites – North Dakota: Lake Ashtabula, Homme Lake Souris River
|
»
|
White Rock Dam Safety, Wheaton, Minnesota
|
»
|
Wild Rice River (MN) Feasibility Study
|
»
|
Wild Rice and Marsh Rivers, Ada, Minnesota
|
|
|
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
Location/Description
|
The Minnesota River originates in southwestern Minnesota at the Minnesota-South Dakota border. The river drains 16,770 square miles in Minnesota, South Dakota, North Dakota and Iowa. It flows 335 miles to join the Mississippi River at Minneapolis, Minnesota. Since European settlement, native prairie has been replaced by agriculture and urban development with constructed drainage systems; more than 90 percent of the wetlands that existed prior to European settlement have been drained. The hydrology of the basin has been significantly altered, leading to increased erosion and impaired water quality. The Minnesota River carries substantial sediment and nutrient loads that degrade the aquatic ecosystems in the Minnesota and Mississippi Rivers. A navigation channel in the lower 15 miles of the river passes through the Minnesota Valley National Wildlife Refuge.
|
The integrated watershed study will produce a watershed management plan and decision support system to aid water and land managers in the Minnesota River basin. These tools will enable examination of existing conditions, forecasting of future conditions and simulation of alternatives to identify ecologically sustaining and economically and socially desirable management actions. The system will address watershed, water quality and ecosystem restoration needs at the small and major watershed scales.
Developing the plan will involve collecting information throughout the basin, working with partners interested in the river, completing detailed modeling efforts and developing a plan based on the needs of the people living and working in the Minnesota River basin. The project will integrate the efforts of local, State and Federal agencies as well as nongovernmental organizations active in the Minnesota River basin.
|
Status
|
The Corps and the Minnesota Environmental Quality Board entered into a feasibility cost share agreement for the study on September 29, 2008.
|
Authority
|
The study is authorized by a resolution of the Committee on Public Works of the U.S. House of Representatives, May 10, 1962, to determine the advisability of further improvements in the Minnesota River basin for navigation, flood control, recreation, low-flow augmentation, and other related water and land resources.
|
Fiscal
|
Estimated Federal cost $4,205,000
Estimated non-Federal cost $4,205,000
Total estimated cost $8,410,000
FY 2008 Federal appropriation $33,000
|
|
|
[Printable Copy]
|