About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
OFFICE OF HEALTH, SAFETY AND SECURITY DEPARTMENTAL REPRESENTATIVE TO THE DNFSB
Text size: Smaller - Normal - Larger - Largest You are Here:  DOE > HSS > Departmental Representative
Departmental Representative
to the DNFSB

Home

Welcome

Archive

Chronological Listing
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1990-1999

Board Recommendations

Board Recommendations
Rec.2008-1
Rec.2007-1
Rec.2005-1
Rec.2004-2
Rec.2004-1
Rec.2002-3
Rec.2002-1
Rec.2001-1
Rec.2000-1
Rec.1992-4

Public Meetings on Oversight

Public Meetings on Safety in Design

SIMS

SIMS Logon
Letter Commitments
Recommendation Commitments

Board Review of Directives

About Our Office

Mission and Functions
DOE Policy on Board Interaction
Recommendation Contact
DOE Site Contacts
Our Office Contact
Site Assignments
Office Assignments
Office Personnel
DOE/DNFSB Interface Workshop
Web Sites Related to Our Office

Interface Manual

About the Board

General Description
Board Members
Board Mission and Functions
Board Enabling Legislation
Board Safety Oversight Principles
Board Policy Statements
Board Strategic Plan
Board Performance Plan
Board Performance Report
Performance & Accountability Rpt.
Board Web Site
Road Map to the Board

Board Web Site

Contact Us

DepRep News

Quick Reference

Facility Representative

Federal Technical Capability Panel

DOE Integrated Safety Management

DOE Directives, Regulations, and Standards

DOE Phone Book

HSS Logo
 

Current National Threat Level is elevated

The threat level in the airline sector is HIGH or Orange
Read more


Information Archive Homepage
CORRESPONDENCE BY SITE 
Hanford Los Alamos Mound OakRidge RockyFlats Savannah River WIPP
Idaho Lawrence Livermore Nevada Test Site Pantex West Valley Misc.

Sandia National Laboratories

  •  JUMP TO:
2009 2008 2007 2006 2005 2004 2003 2002 
 2001 2000 1999 1998 1997 1996 1995 1994 
          This page last updated Monday, August 11, 2008


headertrip.jpg (4453 bytes)

2009
No document links for 2009

2008
  • July 31,  2008, Board letter regarding the June 20, 2008, letter from Mr. David McCoy, Executive Director, Citizen Action New Mexico, regarding concerns at Sandia National Laboratories. [HTML] [PDF] [DOC]

2007
  • October 1,  2007, Department letter transmitting NNSA Central Technical Authority (CTA) guidance to the Office of the Deputy Administrator for Defense Programs regarding expectations that the safety bases and controls be finalized and approved before a Contractor Readiness Assessment begins. [HTML] [PDF] [DOC]

2006
No document links for 2006

2005
  • June 13,  2005, Department letter regarding Corrective Action Plan for the skin contamination incident and Integrated Safety Management at the Sandia National Laboratories Technical Area V. [HTML] [PDF] [DOC]
  • March 23,  2005, Department letter regarding implementation of nuclear safety requirements for a nuclear facility located at Sandia National Laboratories, New Mexico. [HTML] [PDF] [DOC]

2004
  • December 13,  2004, Board letter granting a 30-day extension to respond to Board reporting requirement regarding safety bases at Sandia National Laboratory. [HTML] [PDF] [DOC]
  • November 23,  2004, Department letter providing status of NNSA's portion in Commitment 4.1.4 in the 2002-1 implementation plan, Quality Assurance for Safety-Related Software, which requires NNSA personnel assigned to Software Quality Assurance positions to have qualifications in accordance to the Technical Qualification program. [HTML] [PDF] [DOC]
  • November 22,  2004, Department letter requesting a 30-day extension to submit a report and brief the Board regarding adequacy of safety basis for nuclear facilities at Sandia National Laboratory. [HTML] [PDF] [DOC]
  • November 10,  2004, Department letter regarding implementation of the guidance on Facility Representative training and staffing analysis. [HTML] [PDF] [DOC]
  • October 8,  2004, Board letter regarding Integrated Safety Management at Sandia National Laboratories, New Mexico. [HTML] [PDF] [DOC]
  • September 27,  2004, Board letter establishing a 90-day reporting requirement regarding issues on the adequacy of safety analyses for facilities at Sandia National Laboratory. [HTML] [PDF] [DOC]
  • June 4,  2004, Department letter forwarding the National Nuclear Security Administration (NNSA) Site Office Functions, Responsibilities and Authorities Manuals (FRAMs), and plans for updating safety-related Orders, Standards, and supplemental Directives. [HTML] [PDF] [DOC]
  • March 18,  2004, Department letter providing additional information as a follow-up to the Sandia National Laboratory briefing with the Board on its new management team and other areas of interest to the Board. [HTML] [PDF] [DOC]

2003
  • November 21,  2003, Department letter regarding Commitment 4.2.4 in implementation plan 2002-2, Weapons Laboratory Support of Defense Nuclear Complex, on process for selection, training, mentoring, and succession planning for weapons points-of-contact. [HTML] [PDF] [DOC]
  • October 17,  2003, Department letter providing requested clarifications for NNSA sites regarding habitability-related High Efficiency Particulate Air (HEPA) filters. [HTML] [PDF] [DOC]
  • September 30,  2003, Department letter reporting closure of Commitment 4.2.3 in implementation plan 2002-2, Weapons Laboratory Support of the Defense Nuclear Complex, which requires identifying the point-of-contact for each weapon system in the defense nuclear complex. [HTML] [PDF] [DOC]

2002
  • November 12,  2002, Department letter regarding Sandia Underground Reactor Facility (SURF). [HTML] [PDF] [DOC]
  • October 3,  2002, Board letter forwarding Recommendation 2002-2, Weapons Laboratory Support of the Defense Nuclear Complex. [HTML] [PDF] [WPD]
  • September 3,  2002, Department letter responding to Board reporting requirement dated August 1, 2002 regarding the single point of contact concept relative to W80 enchanced transportation cart (ETC) approval. [HTML] [PDF] [WPD]
  • August 1,  2002, Board letter establishing a 30-day reporting requirement regarding the actions being taken to ensure support in the implementation of safety initiatives at the Pantex Plant. [HTML] [PDF] [WPD]
  • May 17,  2002, Department letter responding to Board reporting requirement dated March 7, 2002 regarding the design of the Sandia Underground Reactor Facility (SURF). [HTML] [PDF] [WPD]
  • March 7,  2002, Board letter establishing a 60-day reporting requirement on the issues outlined in the enclosed staff report on the preliminary design of Sandia Underground Reactor Facility. [HTML] [PDF] [WPD]


2001
             No document links for 2001



2000
             No document links for 2000


1999

No document links for 1999
1998

No document links for 1998

1997

  • January 7, 1997, Staff Review of "Feedback and Improvement" Activities at Sandia National Laboratories-New Mexico, [HTML] (forwarded February 25, 1997).

1996

1995

  • July 31, 1995, Board staff trip report on SNL-NM emergency response exercise rubble glow (trip conducted May 17, 1995). [PDF]

1994

  • June 22, 1994, Board staff trip report on nuclear materials storage at Sandia National Laboratory. [PDF]
  • June 9, 1994, Board staff trip report on low-level waste management and environmental protection at Sandia National Laboratory. [PDF]
  • February 2, 1994, Board staff trip report on Sandia National Lab/Savannah River Site (trip conducted January 5-7, 1994). [PDF]



  Security & Privacy Notice   •   HSS Information Inventory   •   HSS Organization                                      
The White House FirstGov.gov FirstGov.gov Spanish Version E-gov IQ FOIA
U.S. Department of Energy | 1000 Independence Ave., SW | Washington, DC 20585
1-800-dial-DOE | f/202-586-4403 |