OFFICE OF HEALTH, SAFETY AND SECURITY DEPARTMENTAL REPRESENTATIVE TO THE DNFSB
Text size: Smaller - Normal - Larger - Largest You are Here:  DOE > HSS > Departmental Representative
Departmental Representative
to the DNFSB

Home

Welcome

Archive

Chronological Listing
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1990-1999

Board Recommendations

Board Recommendations
Rec.2008-1
Rec.2007-1
Rec.2005-1
Rec.2004-2
Rec.2004-1
Rec.2002-3
Rec.2002-1
Rec.2001-1
Rec.2000-1
Rec.1992-4

Public Meetings on Oversight

Public Meetings on Safety in Design

SIMS

SIMS Logon
Letter Commitments
Recommendation Commitments

Board Review of Directives

About Our Office

Mission and Functions
DOE Policy on Board Interaction
Recommendation Contact
DOE Site Contacts
Our Office Contact
Site Assignments
Office Assignments
Office Personnel
DOE/DNFSB Interface Workshop
Web Sites Related to Our Office

Interface Manual

About the Board

General Description
Board Members
Board Mission and Functions
Board Enabling Legislation
Board Safety Oversight Principles
Board Policy Statements
Board Strategic Plan
Board Performance Plan
Board Performance Report
Performance & Accountability Rpt.
Board Web Site
Road Map to the Board

Board Web Site

Contact Us

DepRep News

Quick Reference

Facility Representative

Federal Technical Capability Panel

DOE Integrated Safety Management

DOE Directives, Regulations, and Standards

DOE Phone Book

HSS Logo
 

Current National Threat Level is elevated

The threat level in the airline sector is HIGH or Orange
Read more


Information Archive Homepage
CORRESPONDENCE BY SITE 
Hanford Los Alamos Mound OakRidge RockyFlats Savannah River WIPP
Idaho Lawrence Livermore Nevada Test Site Sandia West Valley Misc.

Pantex

  •  JUMP TO:
2009 2008 2007 2006 2005 2004 2003 2002 
 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 
          This page last updated Tuesday, December 23, 2008


headertrip.jpg (4453 bytes)

2009
No document links for 2009

2008
  • September 30,  2008, Department letter reporting completion of all Recommendation 98-2, U.S. Department of Energy Revised Implementation Plan for Accelerating Safety Management Improvements at the Pantex Plant, commitments. [HTML] [PDF] [DOC]
  • September 30,  2008, Departmental letter regarding the long-term fidelity of weapons trainer units at the Pantex Plant. [HTML] [PDF] [DOC]
  • August 25,  2008, Departmental letter regarding the need for a 30-day extension to respond to the letter dated July 8, 2008, concerning the long-term fidelity of the weapon trainer units at the Pantex Plant. [HTML] [PDF] [DOC]
  • August 19,  2008, Departmental letter transmitting CVS evaluation report prepared in response to the 2004-2 Implementation Plan for Pantex. [HTML] [PDF] [DOC]
  • August 8,  2008, Board letter establishing a reporting requirement regarding W76 nuclear explosive operations at the Pantex Plant. [HTML] [PDF] [DOC]
  • July 8,  2008, Board letter establishing a 60-day reporting requirement regarding the measures necessary at both the Pantex site and NNSA to address the long-term fidelity of the weapon trainer units at the Pantex Plant.  [HTML] [PDF] [DOC]
  • February 5,  2008, Board letter establishing a 90-day reporting requirement regarding independent validation of line management's implementation of new or substantially revised safety basis controls is warranted for all defense nuclear facilities. [HTML] [PDF] [DOC]

2007
  • October 1,  2007, Department letter transmitting NNSA Central Technical Authority (CTA) guidance to the Office of the Deputy Administrator for Defense Programs regarding expectations that the safety bases and controls be finalized and approved before a Contractor Readiness Assessment begins. [HTML] [PDF] [DOC]
  • August 14,  2007, Department letter regarding Safe Startup of Weapon Program Activities at the Pantex Plant. [HTML] [PDF] [DOC]
  • July 30,  2007, Board letter establishing a 45-day reporting requirement regarding the implementation of Recommendation 2002-3, Requirements for the Design, Implementation, and Maintenance of Administrative Controls[HTML] [PDF] [DOC]
  • July 30,  2007, Board letter regarding authorization basis review at the Pantex Plant. [HTML] [PDF] [DOC]
  • July 16,  2007, Board letter establishing a 30-day reporting requirement regarding adherence to Department of Energy requirements for safe startup of weapon program activities at the Pantex Plant. [HTML] [PDF] [DOC]
  • April 24,  2007, Board letter establishing a 30-day reporting requirement regarding quality of technical procedures for nuclear and nuclear explosive operations at Pantex. [HTML] [PDF] [DOC]
  • March 30,  2007, Board letter establishing a 30-day reporting requirement regarding lightning protection at the Pantex Plant. [HTML] [PDF] [DOC]
  • March 13,  2007, Department letter reporting completion of Commitments 4.2.2, 4.4.6, and 4.5.1 in the 98-2 implementation plan, Safety Management at the Pantex Plant[HTML] [PDF] [DOC]

2006
  • December 15,  2006, Board letter thanking Michael Reaka for his six years of dedicated service as the Department's liaison to the Board at the Pantex Site Office. [HTML] [PDF] [DOC]
  • August 9,  2006, Board letter regarding the proposed restart of W88 cell operations at the Pantex Plant. [HTML] [PDF] [DOC]
  • March 27,  2006, Board letter regarding conduct of operations at the Pantex Plant. [HTML] [PDF] [DOC]

2005
  • November 30,  2005, Department letter regarding NNSA readiness review validations of on-site transportation technical safety requirements. [HTML] [PDF] [DOC]
  • September 9,  2005, Board letter establishing an annual reporting requirement regarding the Pit Management Plan (PMP) and the pit packaging program at Pantex and closing Recommendation 99-1, Safe Storage of Fissionable Material Called "Pits"[HTML] [PDF] [DOC]
  • May 2,  2005, Board letter establishing a 30-day reporting requirement regarding NNSA's path forward to improve conduct of operations at the Pantex Plant. [HTML] [PDF] [DOC]
  • February 1,  2005, Department letter regarding NNSA briefing the Board on commitments from the 98-2 implementation plan, Safety Management at the Pantex Plant[HTML] [PDF] [DOC]
  • January 10,  2005, Department letter regarding special tooling program at the Pantex Plant. [HTML] [PDF] [DOC]

2004
  • December 15,  2004, Board letter establishing a 30-day reporting requirement regarding the tooling program at the Pantex Plant. [HTML] [PDF] [DOC]
  • December 14,  2004, Board letter establishing a reporting requirement for monthly briefings from senior NNSA managers regarding commitments in the 98-2 implementation plan, Safety Management at the Pantex Plant[HTML] [PDF] [DOC]
  • November 23,  2004, Department letter providing status of NNSA's portion in Commitment 4.1.4 in the 2002-1 implementation plan, Quality Assurance for Safety-Related Software, which requires NNSA personnel assigned to Software Quality Assurance positions to have qualifications in accordance to the Technical Qualification program. [HTML] [PDF] [DOC]
  • November 10,  2004, Department letter regarding implementation of the guidance on Facility Representative training and staffing analysis. [HTML] [PDF] [DOC]
  • November 3,  2004, Department letter forwarding the Quarterly Report for the 98-2 implementation plan, Accelerating Safety Management Improvements at the Pantex Plant, for the period July 1 through September 30, 2004, and the NNSA exemption extension approvals for the W87 and W88 weapons program. [HTML] [PDF] [DOC]
  • November 3,  2004, Board letter regarding electrical and lightning protection systems at the Pantex Plant. [HTML] [PDF] [DOC]
  • October 27,  2004, Board letter establishing a 90-day reporting requirement regarding the Department's commitment to develop a program for archiving safety-related activities at the Pantex Plant, the Y-12 National Nuclear Complex, and the Nevada Test Site relative to implementation plan 93-6, Maintaining Access to Nuclear Weapons Expertise[HTML] [PDF] [DOC]
  • August 6,  2004, Department letter forwarding the quarterly report for 98-2 implementation plan, Accelerating Safety Management Improvements at the Pantex Plant for the period April 1 through June 30, 2004. [HTML] [PDF] [DOC]
  • August 6,  2004, Board letter establishing a 45-day reporting requirement regarding cell leak path areas and high explosive accident analysis at the Pantex Plant. [HTML] [PDF] [DOC]
  • July 16,  2004, Department letter regarding schedule for the review of quality assurance at the Pantex Plant. [HTML] [PDF] [DOC]
  • June 24,  2004, Department letter notifying the Board of the authorized startup of the Seamless Safety (SS-21) Process for the W78. [HTML] [PDF] [DOC]
  • June 18,  2004, Board letter establishing a 30-day reporting requirement regarding a comprehensive quality assurance review of the tooling program at Pantex. [HTML] [PDF] [DOC]
  • June 4,  2004, Department letter forwarding the National Nuclear Security Administration (NNSA) Site Office Functions, Responsibilities and Authorities Manuals (FRAMs), and plans for updating safety-related Orders, Standards, and supplemental Directives. [HTML] [PDF] [DOC]
  • May 21,  2004, Board letter requesting NNSA to brief the Board on actions taken to address issues regarding documentation and practices associated with activity-level work planning at NNSA sites. [HTML] [PDF] [DOC]
  • April 28,  2004, Department letter forwarding the Quarterly Report for the 98-2 implementation plan, Accelerating Safety Management Improvements at the Pantex Plant[HTML] [PDF] [DOC]
  • April 5,  2004, Department letter regarding status update on Software Quality Assurance (SQA) deficiencies at Pantex. [HTML] [PDF] [DOC]
  • March 25,  2004, Department letter responding to Board reporting requirement dated January 22, 2004 regarding Nuclear Explosive Safety Study (NESS) process. [HTML] [PDF] [DOC]
  • March 19,  2004, Department letter responding to Board reporting requirement regarding a weapon dismantlement at the Pantex Plant. [HTML] [PDF] [DOC]
  • March 8,  2004, Department letter forwarding the Quality Assurance Program assessment reports for Pantex, Los Alamos, Nevada, and Livermore Site Offices, completing Action 1.3.1 of the Quality Assurance Improvement Plan. [HTML] [PDF] [DOC]
  • February 25,  2004, Department letter regarding W56 Dismantlement Program. [HTML] [PDF] [DOC]
  • February 3,  2004, Department letter forwarding the quarterly report for implementation plan 98-2, Safety Management at the Pantex Plant, for the period October 1 - December 31, 2003. [HTML] [PDF] [DOC]
  • January 20,  2004, Board letter establishing a 30-day reporting requirement regarding a weapon dismantlement at the Pantex Plant. [HTML] [PDF] [DOC]

2003
  • December 22,  2003, Department letter reporting completion of Commitment 4.4.4 in implementation plan 98-2, Accelerating Safety Management Improvements at the Pantex Plant. [HTML] [PDF] [DOC]
  • October 17,  2003, Department letter providing requested clarifications for NNSA sites regarding habitability-related High Efficiency Particulate Air (HEPA) filters. [HTML] [PDF] [DOC]
  • October 10,  2003, Board letter regarding Conceptual Design Report for Building 12-64 Production Bays Upgrade Project at Pantex. [HTML] [PDF] [DOC]
  • September 30,  2003, Department letter reporting closure of Commitment 4.3.3 in implementation plan 98-2, Safety Management at the Pantex Plant, with the integration of the Transportation Safety Analysis Report with other Safety Analysis Report controls. [HTML] [PDF] [DOC]
  • September 30,  2003, Department letter providing status of Commitment 4.4.7 in implementation plan 98-2, Safety Management at the Pantex Plant, which requires the delivery and implementation of accelerated critical tooling for the W78 and W88 weapon program. [HTML] [PDF] [DOC]
  • August 29,  2003, Department letter regarding assessment of nuclear training at the Pantex Plant. [HTML] [PDF] [DOC]
  • July 30,  2003, Department letter forwarding the Quarterly Report for the period of April 1 to June 30, 2003 for implementation plan 98-2, Safety Management at the Pantex Plant[HTML] [PDF] [DOC]
  • July 10,  2003, Board letter establishing a 120-day reporting requirement regarding hoisting and rigging operations at the Pantex Plant. [HTML] [PDF] [DOC]
  • July 9,  2003, Board letter establishing a reporting requirement for a briefing as soon as possible on the accelerated implementation of Seamless Safety for the 21st Century tooling for W88 bay operations and W78 nuclear explosive operations. [HTML] [PDF] [DOC]
  • July 9,  2003, Board letter establishing a 30-day reporting requirement regarding training and qualification programs for National Nuclear Security Administration site office personnel. [HTML] [PDF] [DOC]
  • July 1,  2003, Department letter providing status of commitment 4.3.3, Develop site-wide TSR controls for on-site transportation of nuclear explosives, in the Department's 98-2 implementation plan, Safety Management at the Pantex Plant[HTML] [PDF] [DOC]
  • June 5,  2003, Department letter regarding training deficiencies at the Pantex Plant. [HTML] [PDF] [DOC]
  • May 23,  2003, Department letter regarding Software Quality Assurance deficiencies at Pantex. [HTML] [PDF] [DOC]
  • April 24,  2003, Department letter enclosing the quarterly report for 98-2 implementation plan for the period January through March 2003. [HTML] [PDF] [DOC]
  • April 4,  2003, Board letter establishing a 60-day reporting requirement regarding conduct of operations and training programs at the Pantex Plant. [HTML] [PDF] [DOC]
  • March 25,  2003, Board letter establishing a 30-day reporting requirement regarding Software Quality Assurance at Pantex. [HTML] [PDF] [DOC]
  • March 18,  2003, Board letter forwarding a staff report on the implementation of fire protection controls at the Pantex Plant. [HTML] [PDF] [DOC]
  • January 29,  2003, Department letter forwarding the 4th quarterly report on the 98-2 implementation plan for fiscal year 2002. [HTML] [PDF] [DOC]
  • January 15,  2003, Department letter responding to Board reporting requirement dated November 13, 2002 on continuous air monitor (CAM) and radiation alarm monitor (RAM) systems at the Pantex Plant relative to DOE STD-3009-94. [HTML] [PDF] [DOC]

2002
  • December 19,  2002, Board letter regarding the implementation of Seamless Safety for the 21st Century at the Pantex Plant relative to the 98-2 implementation plan. [HTML] [PDF] [DOC]
  • November 15,  2002, Board letter regarding the need to restart disassembly and inspection operations for the W84 Program. [HTML] [PDF] [DOC]
  • November 13,  2002, Board letter establishing a 60-day reporting requirement on actions that will be taken to ensure controls to protect against significant exposure to radiological hazards at the Pantex Plant are afforded the protection required by safety-significant designation. [HTML] [PDF] [DOC]
  • October 28,  2002, Department letter forwarding the changes to the 98-2 implementation plan, Safety Management at the Pantex Plant. [HTML] [PDF] [DOC]
  • October 23,  2002, Department letter forwarding the Third Quarterly Report on the 98-2 implementation plan, Safety Management at the Pantex Plant. [HTML] [PDF] [DOC]
  • October 15,  2002, Department letter responding to Board letter dated September 23, 2002 regarding fire protection at the Pantex Plant. [HTML] [PDF] [DOC]
  • October 3,  2002, Board letter forwarding Recommendation 2002-2, Weapons Laboratory Support of the Defense Nuclear Complex. [HTML] [PDF] [WPD]
  • September 23,  2002, Board letter enclosing a staff issue report on Fire Protection at the Pantex Plant. [HTML] [PDF] [WPD]
  • September 3,  2002, Department letter responding to Board reporting requirement dated August 1, 2002 regarding the single point of contact concept relative to W80 enchanced transportation cart (ETC) approval. [HTML] [PDF] [WPD]
  • August 6,  2002, Board letter enclosing a staff issue report on the electrical and lightning protection systems at the Pantex Plant. [HTML] [PDF] [WPD]
  • August 1,  2002, Board letter establishing a 30-day reporting requirement regarding the actions being taken to ensure support in the implementation of safety initiatives at the Pantex Plant. [HTML] [PDF] [WPD]
  • July 31,  2002, Department letter forwarding the quarterly report for implementation plan 98-2, Safety Management at the Pantex Plant. [HTML] [PDF] [WPD]
  • July 10,  2002, Department letter forwarding an initial Phase II assessment report from the Amarillo Area Office, Pantex Plant System Drawing Program, in relation to the 2000-2 implementation plan. [HTML] [PDF] [WPD]
  • May 8,  2002, Board letter regarding the Department's revision to the Implementation Plan for Board recommendation 99-1, Safe Storage of Fissionable Material Called "Pits." [HTML] [PDF] [WPD]
  • April 30,  2002, Department letter enclosing the first quarter report for implementation plan 98-2 for fiscal year 2002. [HTML] [PDF] [WPD]
  • April 1,  2002, Department letter regarding Building 12-64 at the Pantex Plant for future nuclear explosive operations. [HTML] [PDF] [WPD]
  • March 25,  2002, Board letter enclosing a staff issue report on procedural compliance at the Pantex Plant. [HTML] [PDF] [WPD]
  • March 18,  2002, Department letter informing the Board of the Department's intent to change commitment 5.2.1 in Implementation Plan 99-1 regarding the safe storage of pits at the Pantex Plant. [HTML] [PDF] [WPD]
  • February 28,  2002, Department letter enclosing the Pantex Plant Sealed Insert First Quarter Fiscal Year 2002 Summary Status Report, a deliverable under Commitment 5.2.2 of the 99-1 Implementation Plan. [HTML] [PDF] [WPD]
  • February 4,  2002, Department letter regarding the Pantex Plant Fire Alarm System program plan. [HTML] [PDF] [WPD]

2001
  • October 2, 2001, Board letter establishing a 30-day reporting requirement providing details on the procedural compliance problem at the Pantex Plant and the corrective actions DOE proposes to resolve this.  [HTM] [WPD] [PDF] 
  • September 25, 2001, Board letter responding to Department letter dated September 14, 2001 regarding Justification for Continued Operations for W88 activities at the Pantex Plant.  [HTM] [WPD] [PDF] 
  • September 14, 2001, Department letter regarding issues raised in Board/TECH-24, Safe Handling of Insensitive High Explosive Weapon Subassemblies at the Pantex Plant.  [HTM] 
  • September 14, 2001, Department letter responding to Board letter dated June 28, 2001 regarding Justification for Continued Operations (JCO) of W88 Assembly, Disassembly, and Inspection.  [HTM] 
  • August 17, 2001, Department letter regarding a new anticipated delivery date to develop a replacement schedule for the Pantex Plant Fire Alarm System.  [HTM] [WPD] [PDF] 
  • July 20, 2001, Board letter enclosing a staff issue report on review of Approved Container Program at the Pantex Plant.  [HTM] 
  • June 28, 2001, Board letter establishing two reporting requirements, (1) a 30-day reporting requirement documenting a technically defensible analysis of the scenarios discussed in the Justification for Continued Operations (JCO) of W88 Assembly, Disassembly, and Inspection in Building 12-85, and (2) 60-day reporting requirement that outlines corrective measures relative to NNSA guidelines for the use and application of weapon response data.  [HTM] [WPD] [PDF] 
  • June 22, 2001, Board letter enclosing a staff issue report on the implementation of lightning protection controls at the Pantex Plant.  [HTM] [WPD] [PDF] 
  • June 21, 2001, Board letter enclosing a staff issue report on the safety basis documentation to restart W78 Disassembly and Inspection operations at the Pantex Plant.  [HTM] 
  • June 21, 2001, Board letter enclosing a staff issue report on Pantex Fire Protection Basis for Interim Operation.  [HTM] 
  • April 20, 2001, Department letter regarding the Board's concerns about the fire response of certain Canned Subassemblies (CSAs) at Pantex.  [HTM] [WPD] [PDF] 
  • March 11, 2001, Department letter responding to Board letter dated February 27, 2001 regarding Seamless Safety for the 21st Century (SS-21) for the W76 and W88 nuclear explosive operations at the Pantex Plant.  [HTM] [WPD] [PDF] 
  • February 27, 2001, Board letter enclosing 2 staff issue reports on reauthorization of W88 assembly and disassembly and inspection, and implementation of seamless safety for W76 disassembly and inspection operations.  [HTM] 
  • February 15, 2001, Department letter responding to Board letter dated May 2, 2000 on the evaluation of systemic deficiencies in the fire hazards analyses and controls at Pantex.  [HTM] 
  • January 30, 2001, Board letter enclosing a staff issue report on the proposed changes to lightning controls for W87 Stockpile Life Extension Program.  [HTM] 
  • January 29, 2001, Department letter responding to the Board's letter dated October 23, 2000 on concerns involving lightning controls at the Pantex Plant.  [HTM] [WPD] [PDF] 
2000
  • November 17, 2000, Department letter responding to Board letter dated March 29, 2000 regarding the staff issue report on fire protection program at the Pantex Plant.  [HTM] 
  • October 23, 2000, Board letter establishing a 30-day reporting requirement outlining the path forward and schedule for addressing the issues in the enclosed staff report on the implementation of the Lightning Basis for Interim Operation.  [HTM] [WPD] [PDF] 
  • September 25, 2000, Department letter forwarding Revision 1 to Implementation Plan 98-2, Safety Management at the Pantex Plant.  [DOC] [HTM] [PDF] 
  • August 29, 2000, Board letter forwarding a staff issue report on a follow-up technical exchange relative to Board/TECH-24, Safe Handling of Insensitive High Explosive Weapon Subassemblies at the Pantex Plant.  [HTM] 
  • July 20, 2000, Board letter accepting the Department's proposal to delay the report and briefing on the fire hazards associated with the W76 Program at the Pantex Plant.  [HTM] [WPD] [PDF] 
  • July 13, 2000, Board announcing the assignment of Mr. William I. White to succeed Timothy J. Dwyer as one of the two Board Site Representatives at the Pantex Plant effective July 31, 2000.  [HTM] [WPD] [PDF] 
  • July 7, 2000, Department letter regarding the safety issue associated with Canned Sub-Assemblies (CSA).  [HTM] 
  • July 3, 2000, Department letter responding to Board letter dated March 29, 2000 on fire protection program at the Pantex Plant.  [HTM] 
  • May 2, 2000, Board letter establishing a 60-day reporting requirement for evaluating the systemic deficiencies in fire hazard analyses and controls at Pantex. The Board also requests a briefing within 4 weeks.  [HTM] 
  • April 25, 2000, Department letter responding to Board letter dated December 6, 1999 on Tech 24, Safe Handling of Insensitive High Explosive Weapon Subassemblies at the Pantex Plant.  [HTM] [WPD] [PDF] 
  • April 21, 2000, Board letter responding to questions posed by the Serious Texans Against Nuclear Dumping (STAND), in their letter dated February 9, 2000, regarding the Board's activities at and the safe operation of Pantex Plant.  [HTM] 
  • March 29, 2000, Board letter forwarding a staff issue report on the fire protection program at the Pantex Plant.  [HTM] 
  • January 13, 2000, Board letter forwarding a revised staff issue report on the In-Progress Review of the W79 Dismantlement Program.  [HTM] [WPD] [PDF] 

1999

1998

1997

  • September 16, 1997, Board letter forwarding a review of Milestone I for the W78 Seamless Safety-21 (SS-21) Project, at the Pantex Plant dated August 29, 1997 [HTML]. (trip conducted on August 13 and 27, 1997.) [HTML]
  • September 5, 1997, Board letter forwarding a trip report of W79 Dismantlement Program Single Internal Readiness Review, dated July 30, 1997.[HTML] (trip conducted June 17-20, 1997.) [HTML]
  • August 12, 1997, Board Trip Report on AT400A Pit Repackaging Startup at Pantex Plant. (trip conducted on July 21-25, 1997.) [HTML] [PDF]
  • August 08, 1997 Board letter forwarding a trip report on the Review W69 Dismantlement Hazard Analysis Report, dated April 18, 1997. [HTML] (trip conducted February 3-12, 1997.) [HTML]
  • April 11, 1997, Board letter forwarding a trip report on the Review of Diesel Generators and Uninterruptible Power Supply Systems, dated June 3, 1996. [HTML] (trip conducted on May 16, 1996.) [HTML]
  • April 11, 1997 Board trip report on Review Installation for Suspect/Counterfeit Parts in Electrical Systems, dated May 23, 1996. [HTML] (trip conducted May 13, 1996, through May 15, 1996.) [HTML]
  • February 19, 1997, Board letter forwarding a trip report on Electrical Testers Used in Nuclear Explosive Operations at Pantex, dated January 6, 1997.[HTML] (trip conducted December 5-6, 1996.) [HTML]
  • February 19, 1997, Board letter forwarding a trip report on Safety Analysis Reports, dated December 3, 1996. [HTML] (trip conducted October 24 and 25 and November 12 to 15, 1996.) [HTML]
  • February 19, 1997, Board letter forwarding a trip report on the Status of New Special Nuclear Material (SNM) Component Staging Facility (12-116), dated December 2, 1996. [HTML] (trip conducted on October 30, 1996.) [HTML]

1996

  • July 24, 1996, Board letter forwarding a trip report on the Review of the Unreviewed Safety Question Program at the Pantex Plant, dated May 29, 1996. [HTML] (trip conducted on April 30 - May 2, 1996.) [HTML]
  • June 4, 1996, Board letter forwarding a trip report on the Review of Unreviewed Safety Questions to Increase Nuclear Weapon Staging in Zone 12 (PX-USQD-95-39-A). [HTML] (trip conducted January 29, 1996.) [HTML]
  • May 10, 1996, Board letter forwarding a trip report on the Review of SNM Component Staging Facility (12-116), dated February 26, 1996. [HTML] (trip conducted January 30 to February 2, 1996.) [HTML]
  • April 19, 1996, Board letter forwarding a trip report on the Revalidation for the Nuclear Explosive Safety Studies of B61-3/4/10 Operations at the Department of Energy Pantex Plant, dated March 27, 1996. [HTML] (trip conducted March 12-15, 1996) [HTML]
  • April 19, 1996, Board letter forwarding a trip report on the Revalidation for the Nuclear Explosive Safety Studies of W76 Operations at the Department of Energy Pantex Plant, dated March 5, 1996. [HTML] (trip conducted January 30 to February 1, 1996) [HTML]
  • February 22, 1996, Board letter forwarding a trip report on Shipping Weapons from Pantex to Department of Defense Facilities to Remove Reservoirs. [HTML] (trip conducted November 17, 1995.) [HTML]

1995

  • September 27, 1995, Board letter forwarding a trip report on the Status of Recommendation 93-1 Implementation Plan Action Item Five, dated July 6, 1995. [HTML] (trip conducted May 24-26, 1995) [HTML]
  • September 27, 1995, Board letter forwarding a trip report on the Conduct of Operations and Training and Qualification Program Review, dated May 23, 1995. [HTML] (trip conducted April 19-21, 1995) [HTML]
  • September 27, 1995, Board letter forwarding a trip report on the Safety Review, dated May 2, 1995.  [HTML] (trip conducted March 28-30, 1995) [HTML]
  • August 14, 1995, Board letter forwarding a trip report on the AT400A Pit Storage and Shipping Container Design and Repackaging.(trip conducted June 9, 1995.) [HTML]
  • July 5, 1995, Board letter forwarding a trip report on the Pantex Site - W55 Case Cutting Incident, dated October 6, 1994. (trip conducted September 12-14, 1994) [HTML]
  • July 5, 1995, Board letter forwarding a trip report on the Emergency Preparedness Exercise, PXCOM-94, dated September 23, 1994 (trip conducted August 24, 1994) [HTML]
  • July 5, 1995, Status of Order Compliance, dated August 23, 1994 (trip conducted May 24-25, 1994) [HTML]
  • July 5, 1995, Board letter forwarding a trip report on the Ventilation Systems, dated June 30, 1994. (trip conducted June 6-9, 1994) [HTML]
  • July 5, 1995, Board letter forwarding a trip report on the Use of Radiation Generating Devices, dated January 7, 1994 (trip conducted November 29 to December 1, 1993) [HTML]
  • June 22, 1995, Board letter forwarding a trip report on the Design and Safety Review of the Special Nuclear Material Component Staging Facility (Building 12-116) and the Weapons Special Purpose Bay Replacement Complex (Building 12-104A), dated May 11, 1995.[HTML] (trip conducted April 10 - 13, 1995) [HTML]
  • May 2, 1995, Board staff trip report on the Pantex Plant Safety Review. [HTML]
  • February 22, 1995, Board letter forwarding a trip report on the Radiological Protection Review, dated November 1, 1994. (trip conducted June 6-10, 1994, and October 12-13, 1994).  [HTML]
  • February 3, 1995, Board staff independent review of the Nuclear Explosive Safety Study. [PDF]
  • January 31, 1995, Board letter forwarding a trip report on the review of the QE process for the Pantex Plant dated December 9, 1994.  (trip conducted on September 13-16, September 27-30, October 25-26, November 15-16, November 29, 1994) [PDF]

1994

  • November 4, 1994 Board letter forwarding a Report on Trip to Pantex - Building 12-84 and 12-44, [HTML] (trip conducted August 23, 1994.) [HTML]
  • November 4, 1994 Board staff trip report on Suspect Parts - Pantex Site. [HTML] (trip conducted August 23, 1994) [HTML]
  • August 3, 1994, Board staff trip report on National Laboratory Support for Pantex. [PDF]
  • June 28, 1994, Board letter regarding the analyses used to determine the probability of an aircraft crash into the Pantex Zone 4 storage magazines. [PDF]
  • April 29, 1994, Board letter regarding plan for addressing issues that led to the maintenance mode and assess efforts to resume operations at Zone 12 at Pantex. [PDF]
  • April 29, 1994, Board letter reviewing the Department's Operational Readiness Review on the increased storage of pits in Zone 4 at Pantex. [PDF]
  • March 3, 1994, Board letter forwarding staff trip report on operational readiness review at Pantex.  [PDF]
  • January 4, 1994, Board staff trip report on W48 Dimethyl Sulfoxide Dissolution Process NESS at the Pantex Site (trip conducted on November 30-December 3, 1993). [PDF]
  • January 3, 1994, Department memorandum forwarding interim report on evaluating conduct of operations at Pantex. [PDF]

1993

  • December 17, 1993, Board staff trip report on Pantex Site - Emergency Preparedness Exercise Review. [HTML]
  • December 8, 1993, Board letter regarding staff trip report to Nevada Test Site and Pantex Plant. [PDF]
  • November 1993, Board staff's observations on the Implementation of Conduct of Operations at Pantex. [PDF]
  • November 19, 1993, Board staff trip report on configuration management and maintenance at Pantex.  [PDF]
  • November 16, 1993, Board staff trip report on safety analysis issues at Pantex.   [PDF]
  • October 10, 1993, Board letter forwarding comments from a review and analysis of DP-West Facility at LANL, Rocky Flats Plants, and Zone 4 at the Pantex Plant. [HTML]
  • September 23, 1993, Board letter submitting comments on a review of Amarillo and M&H. [PDF]
  • July 16, 1993, Board letter commenting on closure findings of QED at Pantex, December 1992 and February 1993. [PDF]
  • February 22, 1993, Board staff's trip report on quality assurance at Pantex. [PDF]
  • July 6, 1993, Board's review of Amarillo and M&H, March 9-11 and June 14-16. [PDF]
  • June 24, 1993, Board's review of Quality Assurance at Pantex. [PDF]
  • June 15, 1993, Board's review on status of administrative Order compliance and the self-assessment process at AL. June 1-14, 1992 [PDF]
  • January 21, 1993, Board letter forwarding staff trip report at Pantex (trip conducted January 5-8, 1993). [PDF]

1992

  • December 23, 1992, Board letter forwarding staff trip report to Pantex (trip conducted December 15-17, 1992). [PDF]
  • September 11, 1992, Board letter transmitting staff trip report on criticality safety at Pantex (trip conducted August 11-14, 1992). [HTML]
  • July 30, 1992, Board letter transmitting staff trip report at Pantex (trip conducted July 7-9, 1992).  [PDF]
  • June 19, 1992, Board staff trip report at Pantex (conducted March 10-13, 1992).  [HTML]
  • May 26, 1992, Board letter forwarding a trip report on Observations Concerning the Operator Training and Qualification, Conduct of Operations, and Procedure Development, dated May 7, 1992. [HTML] (trip conducted April 27-30.) [HTML]



  Security & Privacy Notice   •   HSS Information Inventory   •   HSS Organization                                      
The White House FirstGov.gov FirstGov.gov Spanish Version E-gov IQ FOIA
U.S. Department of Energy | 1000 Independence Ave., SW | Washington, DC 20585
1-800-dial-DOE | f/202-586-4403 |